Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | -2.80% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹2.3 L (1.54%)Admitted-Finance | -1.30% | ₹1.5 Cr+₹2.3 L (1.54%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹2.3 L (1.59%)Admitted-Finance | -1.25% | ₹1.5 Cr+₹2.3 L (1.59%) | L3 | Admitted-Finance |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
10 Aug 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-06 Ward-03 Bamrauli ke antargat Pappu Pasi ke ghar se Raju Pasi ke ghar hote hue Jagj Gautam ke ghar tak, aur Munna Kushwaha se Raju aur Ranjeet ke ghar hote hue Mandir tak, aur Suresh se Deshraj Kushwaha ke ghar tak, aur Shatrudhan ke ghar se
2026_NNAMC_1174024_4
10.08.2026
Open Tender
Civil Works
Percentage
90 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹17,811
AS PER DOCS
₹3.0 L
19 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work cutting in ordinary soil up to 1.5 m lift &30m led with all complete work (S.I.No.253) | 2,099.02 | cum | 160 | ₹3,35,842.4 |
| 2 | Earth work cutting/Filling of embankment lead 30 m and up to 1.5 m lift with all complete work (S.I.No.253) | 2,318.53 | cum | 87.3 | ₹2,02,407.67 |
| 3 | PCC 1:6:12 cement sand and 40mm brick ballast and all compelte the work (s.I.No.-273) | 361.8 | Cum | 3,500 | ₹12,66,300 |
| 4 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 515.14 | cum | 5,098 | ₹26,26,183.72 |
| 5 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) | 2,428.65 | sqm | 197 | ₹4,78,444.05 |
| 6 | Flush pointing (1:2) cement sand mortor including all complete the work (S.I.NO.575) | 1,030.5 | Sqm | 166 | ₹1,71,063 |
| 7 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) | 124.99 | Cum | 9,300 | ₹11,62,407 |
| 8 | M.S iron work including cutting bending and praper laying all complete work (S.I.No.504) | 70.56 | qtl | 6,200 | ₹4,37,472 |
| 9 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 684.46 | cum | 1,654.8 | ₹11,32,644.41 |
| 10 | Cement Concrete work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work | 795.28 | Cum | 8,200 | ₹65,21,296 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tendernotice_2.pdf
PDF • 1.51 MB
BOQ_2205654.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .