Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹5.4 L+₹12,985.60 (2.47%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.4 L+₹18,873.80 (3.59%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹5.3 L
EMD Value
₹10,550
Closing Date
13 Feb 2026, 12:00 pmClosed
DG(CIVIL)
5, S.N.BANERJEE ROAD
RESTORATION OF PAVER BLOCK AND IPS ON FOOTPATH NEAR 8C,13,29/1 SPM RD,31 ATM RD, ETC. IN WD NO-72, DISTURBED BY CESC, NATURAL WEAR AND TEAR.
2026_KMC_997603_1
KMC/DGC/VIII/72/70/25-26/D
Open Tender
CIVIL WORKS
Percentage
120 days
W-72
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,550
26 Feb 2026
5 Feb 2026
16 Feb 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm.
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES
TAKING OUT AND RELAYING OF EXISTING INTERLOCKING PAVER BLOCKS IN FOOT PATH OR PASSAGE ETC. OVER 20-40 MM THICK MEDIUM YELLOW SAND BED WITH TRUE TO LINE, LEVELLING, PROPER COMPACTION WITH VIBRATER ETC. WITH JOINTING WITH KERB/EDGE TO BE MADE WITH CEMENT CONCRETE (1:2:4) ETC. AS PER THE DIRECTION OF THE ENGINEER IN CHARGE. INCLUDING COST OF TAKING OUT AND USING 20% NEW SAND AND ALL MATERIALS, LABOUR ETC. COMPLETE.
Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone.
Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone.
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone.
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 6. Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 2. Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth.
SINGLE BRICK FLAT SOLING OF PICKED JHAMA BRICKS INCLUDING RAMMING AND DRESSING BED TO PROPER LEVEL AND FILLING JOINTS WITH POWDERED EARTH OR LOCAL SAND.
35mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry [email protected] cement per Sqm. Rounding off corners, chequering as required including taking necessary protective measure complete in Gr.floor/footpath.
Sub Total
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
TF.pdf
Tender Documents • 1.07 MB
civil_oid_compressed.pdf
Additional Documents • 1.12 MB
BOQ_2442579.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .