| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 bidder rate quoted less estimate rate |
| 2 | L2₹1.1 Cr+₹1.7 L (1.47%)Rejected-Finance | ₹1.1 Cr+₹1.7 L (1.47%) | L2 | Rejected-Finance Bidder quoted above estimate rate |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
12 Jul 2024, 3:00 pmClosed
Project Director
DRDA, Sivagangai
Renewal,Upgradation and Strengthening 4 road works in S.Pudur Block - Package No 25
2024_RDTN_458806_1
Renewal,Upgradation and Strengthening 4 road works in S.Pudur Block - Package No 25
Open Tender
Civil Works
Item Rate
180 days
Sivagangai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.2 L
4 Sept 2024
3 Jul 2024
12 Jul 2024
3 Jul 2024
12 Jul 2024
3 Jul 2024
Amount
Picking the Existing Worn out BT Surface including all charges etc., complete.
Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle)
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Name Board
Provision for 60cm cautionary Sign Board
Provision for road marker / stud with lens reflector
Provision for KM Stone
Provision for HM Stone
Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle)
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Name Board
Provision for 60cm cautionary Sign Board
Provision for road marker / stud with lens reflector
Provision for KM Stone
Provision for HM Stone
Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle)
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Name Board
Provision for 60cm cautionary Sign Board
Provision for road marker / stud with lens reflector
Provision for HM Stone
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
900mm dia. Pipe Culvert @ Ch. 84m
900mm dia. Pipe Culvert @ Ch. 433m
900mm dia. Pipe Culvert @ Ch. 491m
900mm dia. Pipe Culvert @ Ch. 705m
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
900mm dia. Pipe Culvert @ Ch. 84m
900mm dia. Pipe Culvert @ Ch. 433m
900mm dia. Pipe Culvert @ Ch. 491m
900mm dia. Pipe Culvert @ Ch. 705m
Supplying and erecting shuttering for CC Works including cost and conveyance of all materials to site etc., complete.
900mm dia. Pipe Culvert @ Ch. 84m
900mm dia. Pipe Culvert @ Ch. 433m
900mm dia. Pipe Culvert @ Ch. 491m
900mm dia. Pipe Culvert @ Ch. 705m
Cement concrete 1 : 3 :6 mix using 40mm HBG metal or foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
900mm dia. Pipe Culvert @ Ch. 84m
900mm dia. Pipe Culvert @ Ch. 433m
900mm dia. Pipe Culvert @ Ch. 491m
900mm dia. Pipe Culvert @ Ch. 705m
Supply of NP3 pipe line including siutable collars including cost and conveyance at site etc.,complete
900mm dia. Pipe Culvert @ Ch. 84m
900mm dia. Pipe Culvert @ Ch. 433m
900mm dia. Pipe Culvert @ Ch. 491m
900mm dia. Pipe Culvert @ Ch. 705m
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
900mm dia. Pipe Culvert @ Ch. 84m
900mm dia. Pipe Culvert @ Ch. 433m
900mm dia. Pipe Culvert @ Ch. 491m
900mm dia. Pipe Culvert @ Ch. 705m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Toe wall @ Ch. 364m - 379m
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Toe wall @ Ch. 364m - 379m
Supplying and erecting shuttering for CC Works including cost and conveyance of all materials to site etc., complete.
Toe wall @ Ch. 364m - 379m
Cement concrete 1 : 3 :6 mix using 40mm HBG metal or foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
Toe wall @ Ch. 364m - 379m
Supply & Fixing of 100mm Dia PVC pipe ifor weep holes
Toe wall @ Ch. 364m - 379m
Picking the Existing Worn out BT Surface including all charges etc., complete.
Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle)
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Name Board
Provision for 60cm cautionary Sign Board
Provision for road marker / stud with lens reflector
Provision for HM Stone
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
900mm dia. Pipe Culvert @ Ch. 5m
900mm dia. Pipe Culvert @ Ch. 304m
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
900mm dia. Pipe Culvert @ Ch. 5m
900mm dia. Pipe Culvert @ Ch. 304m
Supplying and erecting shuttering for CC Works including cost and conveyance of all materials to site etc., complete.
900mm dia. Pipe Culvert @ Ch. 5m
900mm dia. Pipe Culvert @ Ch. 304m
Cement concrete 1 : 3 :6 mix using 40mm HBG metal or foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
900mm dia. Pipe Culvert @ Ch. 5m
900mm dia. Pipe Culvert @ Ch. 304m
Supply of NP3 pipe line including siutable collars including cost and conveyance at site etc.,complete
900mm dia. Pipe Culvert @ Ch. 5m
900mm dia. Pipe Culvert @ Ch. 304m
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
900mm dia. Pipe Culvert @ Ch. 5m
900mm dia. Pipe Culvert @ Ch. 304m
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MALAIMATHA CONSTRUCTION (BID ID -1079467)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .