Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 11 SANJIV BAUG SOCIETY NEW SHARDA MANDIR ROAD PALDI AHMEDABAD GUJARAT 380007 | AHMADABAD | GUJARAT | 380007 | Admitted-Finance |
Tender Value
₹27.1 L
EMD Value
₹54,122
Closing Date
15 Jan 2020, 3:00 pmClosed
Executive Engineer Elect
O/o EE (E), PWD NES/ M-251, LM Bund Road, Ramesh Park, Delhi-92
Replacement of One No. 20 Passengers (B plus G plus 6 floors) General Lifts in B Block at District Courts Karkardooma Delhi
2019_PWD_173909_2
08/EE (E)/ PWD North East and Shahdara/2019-20
Open Tender
Electrical Works
Item Rate
180 days
KKD Court Complex
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹54,122
O/o EE (E), PWD NES/ M-251, LM Bund Road, Ramesh P
28 Jan 2020
27 Dec 2019
15 Jan 2020
27 Dec 2019
15 Jan 2020
27 Dec 2019
8 Jan 2020
Amount
(xvii) Vandal proof SS Button with Braille type. (xviii) Car enclosure: SS Hairline Finish, Car cailing- LED ceiling SS hairline finish RL 20, Car Panel – SS Hairline Finish, Car flooring- Granite flooring, Car Illumination – LED ceiling. (xix) Infra red door screen. (xx) Dot matrix LED D & P indicators in Car & Landing. (xxi) Push Button – RED/ Orange LED Illumination. (xxii) Braille Buttons in each floors and lift car. (xxiii) Fireman’s Switch (xxiv) Pit ladder made out of MS angle iron. (xxv) SS hand rail of suitable size to be fixed adjacent to control panel in the lift car in three sides. (xxvi) Mirror in front wall in lift car 2000 mm. x 1500 mm. etc.
Dismantling & Credit for old existing lift complete in all respect as buy back arrangement.
Sub Head - II “B” (AMC of Lift)
Comprehensive maintenance of 1 No. 20 passenger capacity Eight Nos. Opening, capacity lifts installed in ‘B’ Block at District Courts, Karkardooma Delhi i/c servicing routine checkup of all installations, safety devices alarm system and other accessories as applicable i/c attending day to day complaints etc. as required. (NOTE:- AMC will start after completion of warranty/ guarantee period w.e.f. actual date of work of completion.) - 1 Job 1st Year (AMC during warranty/ guarantee Period) 2nd Year (AMC during warranty/ guarantee Period)
3rd Year
4th Year
5th Year
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .