| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance SAGAR COLONY STATION ROAD PO DISTRICT BALANGIR ODISHA | BALANGIR | BALANGIR | ODISHA | -14.99% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.2 CrAdmitted-Finance AT DUMDUMA KHANDAGIRI PO PS KHANDAGIRI BHUBANESWAR DIST KHORDHA ODISHA PIN 751019 | KHORDHA | ODISHA | 751019 | -14.99% | ₹1.2 Cr | L1 | Admitted-Finance |
| 3 | Rejected-Technical AT BDA COLONY LAXMISAGAR STAGE II BHUBANESWAR | - | - | - | Rejected-Technical Not fullfilled the criteria as per DTCN Clause No.11 (a). |
| 4 | Rejected-Technical NA | - | - | - | Rejected-Technical Not fulfilled the criteria as per DTCN Clause No. 11(a). |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
19 Dec 2025, 5:00 pmClosed
S.E. Electrical Circle (RandB) Bhubaneswar
S.E. Electrical Circle (RandB) Bhubaneswar, Nirman Soudha, Unit-V, 751001.
Shifting of 11KV HT line LT line and Transformer for the work-Improvement of such as widening and Strengthening to Narasinghpur-Baliput road from 7/000 to 24/560 Km in the dist. of Cuttack
2025_EICCL_121742_2
Bid Identification No.S.E.E.C (RandB) 18/2025-26
National Competitive Bid
Electrical Works
90 days
Charbatia
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.4 L
10 Feb 2026
5 Dec 2025
20 Dec 2025
5 Dec 2025
19 Dec 2025
5 Dec 2025
5 Dec 2025 - 12 Dec 2025
PART A: Construction of 8.08 KM LT Line using 4CX50 Sq.mm. LTAB Cable. 9 Mtr. long 300 Kg. PSC Pole
PSC POLE 10 METER LONG 330 KG.
LT Stay set Complete
7/12 SWG GI stay wire, Grade -2
LT stay Clamp ( 1.40Kg/pair)
LT Stay insulator
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)
EYE hook for XLPE Aerial bunched Cable
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable
Suspension Clamp with EYE hook for ABC
4C×50 mm² (P)+1C×50 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable)
4 WAY SERVICE Distb. Box with kit kat fuse and Aluminium bus bar.
8 WAY SERVICE Distb.Box with kit kat fuse and Aluminium bus bar.
Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm
GI Pipe Earthing (each 5th pole to earth)
Coil Earthing
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
Danger plate (LT)
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510)
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole)
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1667mm) = 0.42Cu.mtr(Per Pole)
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
PART B: Construction of 3.52 KM 11KV Line using 55 Sq.mm. AAA Conductor. DP With AB Switch WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
Top Channel(GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 3 mtr., 2 no's Channel(GI) required =( 2x9.56x3)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)
AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2)
AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required =( 9.56x2x0.35)
Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1)
Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3.0 Mtr., 4 no's Channel(GI) required =( 7.14x3x4)
50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 4 nos Angle(GI) required = (4.5x3.512x4)
Danger Plate, 2 no's.
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510)
H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)
H.T. Stay set (Complete )
H.T. Stay Insulator Type-C
7/10 SWG Stay Wire 15kg /stay
Gi Pipe Earthing 40mm. 3 Mtr. Long
50x6mm Flat(GI) for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36
GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg)
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510)
Lightning Arrester(12KV,10KA) (Station Class,class-2)
AB Switch (11KV,400A.3pole,50Hz)
11 KV pin insulator polymer
H W fitting(B&S) 70KN, 3Bolt
Disc insulator (B&S) 70 KN polymer
WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole)
Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole)
Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design
11 KV Cut Point with 180 Degree Angle WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) (Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 2 no's Channel(GI) required =( 2x9.56x1.2)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 2 no's Channel(GI) required =(2x9.56x0.306)
Danger Plate, 1 no's.
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510)
11 KV pin insulator polymer
H W fitting(B&S) 70KN, 3Bolt
Disc insulator (B&S) 70 KN polymer
Earthing of Support ( Coil Type )
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole)
Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole)
11 KV Cut Point with 90 Degree Angle WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) (Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required =( 4x9.56x0.306)
Danger Plate, 1 no's.
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510)
11 KV pin insulator polymer
H W fitting(B&S) 70KN, 3Bolt
Disc insulator (B&S) 70 KN polymer
Earthing of Support ( Coil Type )
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)
H.T. Stay set (Complete )
H.T. Stay Insulator Type-C
7/10 SWG Stay Wire 15kg /stay
GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole)
Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole)
11 KV Pin Points With WPB WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) (Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
11 KV V cross Arm(GI) (10.2 K.g. each )
Top bracket 100x50X6 mm GI Channel(GI) (2kg each)
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510)
anger Plate, 1 no's. for each pole
Earthing of Support ( Coil Type )
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
11 KV pin insulator polymer, 3 Nos. required for each support
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
POLYCARBONATE BIRD GUARD
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole)
Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole)
55 sq.mm AAA conductor
PART-C:- Supply & Installation of 1 No. of Pole Mounted 16 KVA 11/0.4 KV Cu.DSS WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) (Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
Top Channel(GI) GI 100 X 50 X 6 MM (1200 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x1.200x9.56= 22.94 Kg)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., Noch 0.280 mtr. length, 4 No's required = (4x2.36x0.280)
Transformer Mounting Bracket (65x65x6 GI Angle(GI)) suitable for 16/10KVA 11/0.23 KV Transformer
AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (2000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x2.000x7.14= 28.56 Kg)
Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg)
HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (2000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x2.000x7.14= 28.56 Kg)
25x3mm Flat(GI) for earthing, 0.59kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle) ( Each 62.6x 0.59= 36.93 Kg)
LT Dist. Box with MCCB for 16KVA S/S.
55 SQ.MM. AAAC XLPE Covered Conductor
2Cx16 mm2 LT XLPE Cable(armoured)
AB Switch(11KV,200A.2pole,50Hz)
DO.Fuse( 11KV.200A.3Pole)
WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
2.5 AMP Fuse Link
Disc insulator (B&S)70 KN polymer
H W fitting (B&S)70KN(3bolted)
Lightning Arrester(12KV,10KA) Station Class 2
11KV pin insulator polymer
HT stay set complete
HT stay Clamp (1.9Kg/pair)
HT stay insulator TYPE-C
7/10 SWG GI stay wire, Grade -2 (15Kg./ Set)
40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long
GI Nuts & Bolts of Assorted size (15 Kg/ DSS SP)
GI Barbed wire/Anticlimbing device (3Kg /Pole)
Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 No's = (4x0.59x0.510)
Danger plate 11kv
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 No's (Noch 1x0.59x0.510)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Name plate
Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.450Cu.mtr(Per Pole)
Couping ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr(Per Pole)
PCC ratio 1:3:6(M-10 Grade) For DSS Area (3X2X0.1)= 0.6 Cu. mtr.
Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator .
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
Laying of 2 Cx 16 mm2 LT PVC Cable
Supply of AL Lugs suitable for 16 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement.
SITC and Erection of GI Fencing with Gate
PART-D: Construction of 11KV Protecting guarding on Single Pole Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 2.2 mtr., 4 no's Channel(GI) required =( 4x7.14x2.2) ( For Single Pole)
No-6 GI wire (0.192 kg/mtr.) for Main String
No-8 GI wire (0.131 kg/mtr.) for lacing
Gi Pipe Earthing 40mm. 3 Mtr. Long
Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.)
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
50x6mm Flat(GI) for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36
PART-E: Construction of 11KV Protecting guarding on Double Pole Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 3.5 mtr., 4 no's Channel(GI) required =( 2x7.14x3.5) ( For Double Pole)
Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 2.2 mtr., 4 no's Channel(GI) required =( 2x7.14x2.2) ( For Single Pole)
PART-D: Construction of 11KV Protecting guarding on Single Pole Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 2.2 mtr., 4 no's Channel(GI) required =( 4x7.14x2.2) ( For Single Pole)
No-6 GI wire (0.192 kg/mtr.) for Main String
No-8 GI wire (0.131 kg/mtr.) for lacing
Gi Pipe Earthing 40mm. 3 Mtr. Long
Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.)
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 3.5 mtr., 4 no's Channel(GI) required =( 2x7.14x3.5) ( For Double Pole)
PART-F: DISMANTLING OF MATERIALS Dismantling of 09/11 Mtr. Joist/WPB Pole- 116X100mm (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km /site store and refilling the pit with loose earth and ramming including removal and disposal of malba at proper location as per instruction of EIC.
Dismantling of 9/8 Mtr. PCC/Joist Pole (Serviceable Pole) after digging the pit and taking out the pole, transportation and stacking the pole at a proper place in safe position within 10km /site store and refilling the pit with loose earth and ramming including removal and disposal of malba at proper location as per instruction of EIC.
Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 16KVA including removal of HT/LT leads, earth connections and unloading by crane if required. Scope of work also includes loading, transportation, unloading and staking at a proper place in safe position/site store
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
DTCN.pdf
Tender Documents • 1.06 MB
BOQ_569569.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid