| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance R O BIMAL HOTA GALI WARD NO 27 PO BUDHARAJA PS AINTHAPALI DIST SAMBALPUR | +0.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.1 CrAdmitted-Finance | +0.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 3 | L1₹1.1 CrAdmitted-Finance | +0.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 4 | L1₹1.1 CrAdmitted-Finance | +0.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 5 | L1₹1.1 CrAdmitted-Finance | +0.00% | ₹1.1 Cr | L1 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
17 Jun 2026, 5:00 pmClosed
C.C.E, Northern R AND B Circle, SAMBALPUR
O/O THE C.C.E, Northern R AND B Circle, SAMBALPUR
BUILDING WORK
2026_EICCL_130287_1
CCENC(RANDB) /24/ 2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
120 days
NAKTIDEUL
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹1.1 L
Yes
8 Sept 2026
2 Jun 2026
18 Jun 2026
2 Jun 2026
17 Jun 2026
2 Jun 2026
2 Jun 2026 - 8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick or stone masonry in lime or cement mortar above 3m.height including stacking the useful materials for reuse and removing the debris within 50m. lead including all cost of labour,material,mechineries, loading & unloading, conveyance & T&P etc. Complete as per the direction of Engineer-In-Charge. | 1 | Cum | - | - |
| 2 | Dismantling and removing 2.5 cm thick grading concrete from roof slab cleaning the surface lowering and removing the debris within 50m lead. including stacking the useful materials for reuse and removing the debris within 50m. lead including all cost of labour,material,mechineries, loading & unloading, conveyance & T&P etc. Complete as per the direction of Engineer-In-Charge. | 1 | Sqm | - | - |
| 3 | Scraping old paint with scrapers, sand papering andwashing with soap water or soda including scaffolding charges upto 5M height. including stacking the useful materials for reuse and removing the debris within 50m. lead including all cost of labour,material,mechineries, loading & unloading, conveyance & T&P etc. Complete as per the direction of Engineer-In-Charge. | - | Sqm | - | - |
| 4 | Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead including all cost of labour,material,mechineries, loading & unloading, conveyance & T&P etc. Complete as per the direction of Engineer-In-Charge. | 1 | Sqm | - | - |
| 5 | Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead including all cost of labour,material,mechineries, loading & unloading, conveyance & T&P etc. Complete as per the direction of Engineer-In-Charge. | 1 | Sqm | - | - |
| 6 | Dismantling and removing old tiled flooring cladding from wall including racking out joints 12mm deep stacking the useful materials for reuse and removing the debris within 50 meter lead including all cost of labour, material, mechineries, loading & unloading, conveyance & T&P etc. Complete as per the direction of Engineer-In-Charge. | - | Sqm | - | - |
| 7 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m lead including all cost of labour, material, machineries, loading & unloading, conveyance & T&P etc. Complete as per the direction of Engineer-In-Charge. | - | Sqm | - | - |
| 8 | Dismantling and removing of R.C.C. footing, column, beam, slab, staircase, landing, lintel, etc. all of existing structure and removing the debris within 50mtr lead. Including all cost of labour,material,mechineries, loading & unloading, conveyance & T&P etc. Complete as per the direction of Engineer-In-Charge. | 1 | Cum | - | - |
| 9 | Earth work in excavation of foundation trenches in all type of soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. | 1 | Cum | 1 | ₹1 |
| 10 | Up to (1.5m to 2m depth) | - | Cum | 1 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.60 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
1NAKTIDEUL.pdf
Tender Documents • 1.77 MB
BOQ_593464.xls
BOQ • 1.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .