Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1Accepted-AOC | ₹1 Quoted ₹80.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹81.7 L+₹81,690.68 (1.01%)Rejected-Finance | ₹81.7 L+₹81,690.68 (1.01%) | L2 | Rejected-Finance L2 |
| 3 | L3₹83.3 L+₹2.4 L (3.01%)Rejected-Finance | ₹83.3 L+₹2.4 L (3.01%) | L3 | Rejected-Finance L3 |
Tender Value
₹80.9 L
EMD Value
₹1.6 L
Closing Date
25 Feb 2026, 4:00 pmClosed
EE/HHD/PWRD
ONKARMAL JETIA ROAD HOWRAH-711103
Dewanghata Bowbazar Road with link to deulpur H.C from 0.00 km to 2.20 km, Restoration work of PHE Cutting for laying pipe line under Howrah Highway Division in the District of Howrah. (Under Head- Deposit Head)
2026_SH_996772_1
WB/PWRD/EE/HHD/NIT-23/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
HOWRAH
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.6 L
Yes
3 Sept 2026
31 Jan 2026
27 Feb 2026
31 Jan 2026
25 Feb 2026
31 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary for sand filling . | 2,577.4 | SQM | 128.4 | ₹3,30,938.16 |
| 2 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. | - | CUM | 1,253.32 | - |
| 3 | Granular Sub-base with Graded Material (Table:- 400-1)
A. Plant Mix Method: Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (v) Grading – V | 644.35 | CUM | 2,251.03 | ₹14,50,451.18 |
| 4 | Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). | 644.35 | CUM | 2,369.5 | ₹15,26,787.33 |
| 5 | Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming toIS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanicalmeans including cost and carriage of bitumen emulsion and allother incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). | 2,577.4 | SQM | 32.19 | ₹82,966.51 |
| 6 | Tack Coat Providing and applying tack coat with Cationic
Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). | 5,154.8 | CUM | 9.17 | ₹47,269.52 |
| 7 | Bituminous Macadam using Hot Mix Plant (HMP)Providing and laying bituminous macadam with Hot Mix Plant using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature with paver finisher to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Clause 504 of Specifications for Road & Bridge Works of MoRT&H (5th Revision) B. For Grading 2
(19 mm nominal size, 50-75 mm thick.) (ii) Using Drum mix Type HMP of minimum capacity 60-90 TPH. | 128.87 | CUM | 5,823.25 | ₹7,50,442.23 |
| 8 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction andsatisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150mm. | 1,101.75 | CUM | 71.4 | ₹78,664.95 |
| 9 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shinglesof specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal(63 mm to 45 mm) with moorum screening : | 82.63 | CUM | 2,583 | ₹2,13,433.29 |
| 10 | GST @ 18.00% over Sl. No. 1 to Sl. No. 9 | - | G.S.T. | 0.18 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_2439433.xls
BOQ • 0.26 MB
2911.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .