| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAdmitted-Finance | ₹9.7 L | L1 | Admitted-Finance |
| 2 | L2₹11.3 LAdmitted-Finance WARD NO 9 BHAGAT SINGH COLONY NEAR SINGRALI SINGRAULI | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | ₹11.3 L | L2 | Admitted-Finance |
| 3 | L3₹11.3 LAdmitted-Finance MILAN COMPLEX SHANKER MARKET JAYANT PO SINGRAULI DISTT SINGRAULI MP 486 890 | SINGRAULI | MADHYA PRADESH | 486890 | ₹11.3 L | L3 | Admitted-Finance |
| 4 | L4₹11.8 LAdmitted-Finance | ₹11.8 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | J.V.Engineering L3 | MAGADH ENTERPRISES L4 | M/S SHAKTI CONTRACTORS L1 | M s Banarsilal and Sons Associates L2 |
|---|---|---|---|---|---|---|---|
| 1.00Repairing of Old Pontoon | |||||||
| 1.01 | Cleaning ,checking of leakage in each and every boxes of MS pontoon emptying the water of pontoon to dry position and then rubbing from cotton for further work like cutting ,welding and Painting.
(All consumable are provided by contractor) | 9 | Set | 4,000 ₹36,000 | 5,000 ₹45,000 | 5,000 ₹45,000 | 9,000 ₹81,000 |
| 1.02 | Dismantling of M.S pontoon for the overhauling
Scope of work:-Damage part of all 09 nos. of boxes to be dismantled accordingly.
(All consumable are provided by contractor such as welding rod, nut bolt etc.) | 18,970.71 | Kg. | 4.15 ₹78,728.45 | 5 ₹94,853.55 | 3 ₹56,912.13 | 4 ₹75,882.84 |
| 1.03 | Fabrication and Errection of dismental part of pontoon
(Steel material are Provided departmentally)
(Scope of work:-Damage part of all nine nos. of boxes to be fabricated accordingly) | 18,970.71 | Kg. | 14.37 ₹2.7 L | 15 ₹2.8 L | 11 ₹2.1 L | 6 ₹1.1 L |
| 1.04 | Supply and Painting with rubberized paint(One coat red oxide and two coat rubberized paint)
(Scope of work:-First, all nine boxes shall be thoroughly cleaned. After cleaning, one coat of red oxide primer shall be applied. Once the red oxide primer has completely dried, one coat of rubberized paint shall be applied, followed by a second coat of rubberized paint as required. | 1,620 | Sq.Mtr. | 74.88 ₹1.2 L | 80 ₹1.3 L | 95 ₹1.5 L | 60 ₹97,200 |
| 2.00Making of New Pontoon | |||||||
| 2.01 | Fabrication and Errection of dismental part of pontoon
(Steel material are Provided departmentally )
(Scope of work:-Damage part of all nine boxes are fabricated accordingly) | 33,726 | Kg. | 15 ₹5.1 L | 15 ₹5.1 L | 11 ₹3.7 L | 20 ₹6.7 L |
| 2.02 | Supply and Painting with rubberized paint(One coat red oxide and two coat rubberized paint)
(Scope of work:-First all nine boxes should be clean than one coat red oxide. When red oxide dry than one coat rubberized paint than other coat accordingly) | 1,468 | Sq.Mtr. | 81 ₹1.2 L | 80 ₹1.2 L | 95 ₹1.4 L | 60 ₹88,080 |
| 3.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - |
Tender Value
₹15.8 L
EMD Value
₹19,700
Closing Date
23 Mar 2026, 5:00 pmClosed
GM(ENM), DCH
PO-KHADIA, DISTRICT-SONEBHADRA, UP- 231222
Repairing Old Pontoon (9 Sets) and making of New Pontoons (4 Sets) for Installation During Monsoon in the Coal and East Section of Dudhichua.
2026_NCL_356398_1
DCH/EnM/Tender/FLD/25-26/057
Open Tender
Miscellaneous Works
90 days
DUDHICHUA, NCL
Please refer tender documents
4 documents required · 4 mandatory
₹19,700
24 Apr 2026
12 Mar 2026
24 Mar 2026
12 Mar 2026
23 Mar 2026
13 Mar 2026
12 Mar 2026 - 16 Mar 2026
Repairing of Old Pontoon
Cleaning ,checking of leakage in each and every boxes of MS pontoon emptying the water of pontoon to dry position and then rubbing from cotton for further work like cutting ,welding and Painting. (All consumable are provided by contractor)
Dismantling of M.S pontoon for the overhauling Scope of work:-Damage part of all 09 nos. of boxes to be dismantled accordingly. (All consumable are provided by contractor such as welding rod, nut bolt etc.)
Fabrication and Errection of dismental part of pontoon (Steel material are Provided departmentally) (Scope of work:-Damage part of all nine nos. of boxes to be fabricated accordingly)
Supply and Painting with rubberized paint(One coat red oxide and two coat rubberized paint) (Scope of work:-First, all nine boxes shall be thoroughly cleaned. After cleaning, one coat of red oxide primer shall be applied. Once the red oxide primer has completely dried, one coat of rubberized paint shall be applied, followed by a second coat of rubberized paint as required.
Making of New Pontoon
Fabrication and Errection of dismental part of pontoon (Steel material are Provided departmentally ) (Scope of work:-Damage part of all nine boxes are fabricated accordingly)
Supply and Painting with rubberized paint(One coat red oxide and two coat rubberized paint) (Scope of work:-First all nine boxes should be clean than one coat red oxide. When red oxide dry than one coat rubberized paint than other coat accordingly)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.47 MB
LOB057.pdf
Tender Documents • 0.11 MB
BOQ_369243.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid