Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L1 | Accepted-AOC L1-Accepted | |
| 2 | L2₹15.3 L+₹1,567.22 (0.10%)Rejected-Finance 1 1A VANSITART ROW 2ND FLOOR ROOM NO 2 KOL 700 001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹15.3 L+₹2,496.82 (0.16%)Rejected-Finance BHAGIRATHIPUR DOMKAL MSD | DOMKAL | MURSHIDABAD | WEST BENGAL | 742101 | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹31,000
Closing Date
17 Jan 2025, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Operation Maintenance at Intake Pumping Station of Balupur W/S Scheme (All Mechanical Electrical part) in the District of Malda under Malda Mechanical Division, P.H.E.Dte.
2024_PHED_786046_2
WBPHED/EE/MLMD/NIeT_31 of 2024-2025
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
4 documents required · 4 mandatory
₹31,000
Yes
3 Feb 2025
24 Dec 2024
20 Jan 2025
24 Dec 2024
17 Jan 2025
24 Dec 2024
Amount
PART-A
INTAKE:- Operation , maintenance and guarding round the clock of 03 Nos. Vertical Turbine pumping machineries, Vertical Motor control Panel, Actuator Operated butterfly valve for maintenance of Raw Water Supply as and when required per day alongwith operation of 3 nos.non-clog submersible pump in floating burge (in emergncy situation when normal supply fails) by engaging personnel having sufficient experience in operation of pumping machineries for supply of Raw Water to Treatment Plant including sweeping & Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitation
ESIC contribution for Employers for sl no 2. @ 3.25 %
EPF contribution for Employers for sl no 2. @ 13 %
Checking of healthly condition of all feeders daily by Electrician having valid and appropriate License (Workmans' Permit), issue by Directorate of Electricity (Licensing Board), Govt. of W.B. or of any other State Govt. of India or by personal having ITI (Electrician) Certificate, checking and fault finding of distributed power cable at said site and findings to be recorded in the Log Book
ESIC contribution for Employers for sl no 3. @ 3.25 %
EPF contribution for Employers for sl no 3. @ 13 %
PART-B
Periodical maintenance by Cleaning of contacts by CRC 226 spray in the existing HT & LT panel board, PDBs, cleaning of all Terminal Sockets, Coils, greasing of pump & motor bearing, filling up lubricating oil, change of gland packing etc at the site once in a month along with minor repairing (if required) of the electro mechanical equipments by supplying necessary sundry materials/electro mechanical accessories as required in presence of Electrical Supervisor/ Electrician and to be recorded in the Log Book with date.
Periodial inspection thrice in a month and as & when required by Electrical Supervisor having valid Supervisors' certificate of competency from Directorate of Electricity Licensing Board), Govt. of West Bengal or under any other State Govt. of India along with Pump Technician/Supervisor. Each visit should be recorded in the Log Book (with date and time) to be supplied by the Agency and kept in the Pump House & Sub-station Building. The Supervisor requires to have through/in-depth inspection of all the electrical appliances to ascertain the healthy/ fault free operational condition of each equipment i.e. pumps, Motors,valves with Actuators, flow / level/ pressure instruments, gauges, lightings, waisting arrangements, exhaust fans, HT & LT Panel Boards, Cables, capacitors, Transformer, Battery and Battery charger along with in-house lighting system.
Calibration of all meters viz. Ammeter, Voltmeter, Kilowatt meter etc. and testing of all relays, earthing arrangement system, power cable by any agency approved by Directorate of Electricity/WBSEDCL/Any Power Generating unit, twice in a year (preferably in the month of December and June) and submission of the test report in duplicate to Department in each case as required and as per direction of EIC.
Add GST @ 18%
Add Cess @ 1%
ALOK ENTERPRISE. A Unit of Saket Trexim Pvt. Ltd. (BID ID -5948625)
M/S.S.S.ENTERPRISE (BID ID -5946280)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .