| 1 | Admitted-Fee/PreQual/Technical PLOT 41 A PHASE 1 R S CORPORATION COMPOUND GIDC ESTATE VITTHAL UDHYOGNAGAR ANAND GUJARAT 388121 | ANAND | GUJARAT | 388121 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹22,800
Closing Date
1 Jan 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chief Engineer
The Chief Engineer, North Chennai Thermal Power Station - I, Chennai - 120
NCTPS I Operation Circle CA Dn CWPH Overhauling of 50T slash 10T 25T and 3T EOT cranes and 2T Hoist at ware house stores CWPH RWPH and Chlorine plant respectively Load testing and Renewal of certificates for the above cranes
2025_EB_633893_1
CE/NCTPS-I/SE/OPN/65/2025-26
Open Tender
Power/Energy Projects/Products
Works
30 days
NCTPS - I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹22,800
Yes
11 Jun 2026
18 Dec 2025
2 Jan 2026
18 Dec 2025
1 Jan 2026
18 Dec 2025
Material Cost : Electro Hydraulic Thrust operated double shoe brake for Long Travel of 50T and 25T cranes.
Labour Cost: Overhauling of 50/10 T EOT crane Revisioning of gear box in main hoist:Dismantling of top cover, removal of gears, inspection of gears and bearings and if necessary changing of bearings dismantling of gear couplings draining of old oil, changing of oil seal, assembling back the gears, gear couplings, topping up of oil, etc.. And normalizing.
Labour Cost: Revisioning of Gear Box In Auxiliary Hoist:Removal of top cover, removal of gears, inspection of gears and bearings and if necessary changing of bearings dismantling of gear couplings draining of old oil, changing of oil seal, assembling back the gears, gear couplings, topping up of oil, etc., and normalizing.
Labour Cost: Revisioning Of Gear Boxes In Cross Travel:Removal of top cover, removal of gears, inspection of gears and bearings and if necessary changing of bearings dismantling of gear couplings draining of old oil, changing of oil seal, assembling back the gears, gear couplings, topping up of oil, etc.. and normalizing.
Labour Cost: Revisioning Of Gear Boxes In Long Travels:Removal of top cover, removal of gears, inspection of gears and bearings and if necessary changing of bearings dismantling of gear couplings draining of old oil, changing of oil seal, assembling back the gears, gear couplings, topping up of oil, etc., and normalizing.
Labour Cost: Revisioning Of Brakes:All the brakes are to be dismantled, liners to be changed for whichever necessary, reassembling, adjusting and fixing.
Labour Cost: Revisioning of bottom and top equalizing pullies (both MH And AH) and wire ropes inspection:All the pulleys to be dismantled, Bearings to be inspected, Cleaning and Changing of Bearings if necessary regreasing assembling back. Inspection of wire rope as per IS Standards, magnifying inspection, core condition check, strand elongation, reduction check, strand kink, protrusion, bird caging & bend inspection.
Labour Cost: Inspection of Hooks Bearings (Both Main Hoist & Auxiliary Hoist): The Hooks to be Lowered to '0' Meter, Dismantled Bearings to be inspected and to be changed if necessary, cleaning regressing etc., and assembling back.
Labour Cost: Charges for dismantling of rope drum, inspection, cleaning and applying compound & re winding the steel wire rope and assembling the drum with hoist (50/10T).
Labour Cost:Overhauling of main gearbox of 25 Ton capacity electrical hoist at CWPH including the dismantling of gear couplings, gear box top cover, inspection of gears & gear coupling, changing of hoist gear box assembly in put pinion shaft and input pinion mating gear wheel and gear box shaft made of special grade and hardened material and bearings and assembling back all the above internals etc.. and normalizing.
Labour Cost: Revisioning of long travel gearbox of 25Ton EOT crane by providing "A" frame chain block arrangement including the dismantling of gear couplings, gear box top cover, draining oil, and inspection of gears & gear coupling, bearings & changing of gears & gear coupling, bearings if necessary changing of oil seals, assembling back all the above internals & topping up Oil etc and normalizing.
Labour Cost: Revisioning of cross travel gearbox of 25Ton EOT crane by providing on "A" frame chain block arrangement including the dismantling of gear couplings, gear box top cover, draining 2oil,and inspection of gears & gear coupling, bearings & changing of gears & gear coupling, bearings if necessary changing of oil seals, assembling back all the above internals & topping up oil,etc.,and normalizing.
Labour Cost: Revisioning of brakes assemblies with thrustor units of 25 Ton EOT crane including dismantling the actuators, renewal of all brake liners, changing the thrustor if necessary and assembling all the above checking the operation of brake liners & thrustors units. (Main motor side, Micro motor, Long travel - Cross travel Brakes) rate for 1 brake.
Labour Cost: Complete alignment & checking the operation of 25 Ton EOT crane. Alignment of Main motor, of Main motor, gearbox and its brake units, Micro motor, gearbox and its brakes units, LT & CT motors, gearboxes and its brakes units. Checking all movement of crane with load.
Labour Cost: Charges for Overhauling of Hoist Hook Assembly, Compensating pulleys and changing of hook pulley bearings(25T).
Labour Cost: Overhauling of 3T capacity EOT crane at RWPH.
Labour Cost: Charges for lowering of 2T mono rail crane from its beam to the ground surface and after completion of work lifting the crane and fitting in the beam.
Labour Cost: Charges for Overhauling of gear box of cross travel and cross travel capacity -2 Ton including dismantling of top cover, draining of oil, removal of gears and checking, renewal of gears and renewal of bearings, cleaning and inspection, reassembling of gears, topping up of oil etc., and normalizing.
Labour Cost: Charges for Overhauling of brakes, capacity 2 Ton and renewal and reassembling adjusting and fixing and normalizing.
Labour Cost: Charges for Overhauling of equalizing pulley and hook pulleys, capacity 2 Ton including the pulleys to be Dismantling, and reassembling and greasing and reassembling and greasing and normalizing.
Labour Cost: Transporting the material & arranging for load testing of EOT crane for conducting full load test of 50T/10T EOT crane (To be done by Govt. approved agencies and certificate of Load Test to be produced).
Labour Cost: Transporting the material & arranging for load testing of EOT crane for conducting full load test of 25T EOT crane (To be done by Govt. approved agencies and certificate of Load Test to be produced).
Labour Cost: Transporting the material & arranging for load testing of EOT crane for conducting full load test of 3T hoist (To be done by Govt. approved agencies and certificate of Load Test to be produced).
Labour Cost: Transporting the material & arranging for load testing of EOT crane for conducting full load test of 2T hoist (To be done by Govt. approved agencies and certificate of Load Test to be produced).
Labour Cost: Charges for thorough cleaning and painting of structures of 50T/10T, 25T, 3T and 2T capacity EOT cranes/hoists, with two coats of Epoxy paint, including cost of paint and consumables.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.45 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_758492.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .