Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59,900Qualified | L1 | Qualified MII | |
| 2 | L2₹66,050+₹6,150 (10.3%)Qualified 0 MOHAR KUNJA 3RD FLOOR RAJA RAMMOHAN ROY ROAD EAST VIVEKANANDA PALLY PO RABINDRA SARANI SILIGURI WEST BENGAL 734006 | JALPAIGURI | WEST BENGAL | 734006 | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹70,050+₹10,150 (16.9%)Qualified 0 MOHAR KUNJA RAJA RAMMOHAN ROY ROAD EAST VIVEKANANDAPALLY RABINDRA SARANI SILIGURI WEST BENGAL 734006 | JALPAIGURI | WEST BENGAL | 734006 | L3 | Qualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
3 Oct 2022, 5:00 pmClosed
Repair and Replacement of 100 KVA transformer at Pedong
3838959
GEM/2022/B/2583742
M and L for dismantling of the transformer after opening the external metal cover and lifting the c
30 days
West Bengal; Darjeeling
Total value wise evaluation
BOQ
3 documents required · 3 mandatory
2 yrs
30%
Exempted
3 Oct 2022
27 Sept 2022
3 Oct 2022
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | M and L for dismantling of the transformer after opening the external metal cover and lifting the core and winding assembly complete including survey and loading complete all as directed | M and L for dismantling of the transformer after opening the external metal cover and lifting the core and winding assembly complete including survey and loading complete all as directed | 1 | No | DARJEELING | 30 |
| 2 | Repair and replacement of insulating materials like Glass Tube Bakelite Tube Glass Tape Pre compress Board Crap Paper Craft Paper Pressphan Paper Cotton Tape Vanish etc | Repair and replacement of insulating materials like Glass Tube Bakelite Tube Glass Tape Pre compress Board Crap Paper Craft Paper Pressphan Paper Cotton Tape Vanish etc | 1 | No | DARJEELING | 30 |
| 3 | M and L for re assembl of both HV and LV coils after core binding and reconnect of coils and all testing and after cleaning of tank and refitting of Bushing and testing all as directed by E in c | M and L for re assembl of both HV and LV coils after core binding and and dying the assembly through heating and all testing and Box up the transformer after cleaning of tank and testing all as directed by E in c | 1 | No | DARJEELING | 30 |
| 4 | Repair andreplacement for Gasket Waasher for Radiator conservator tank Vent pipe etc complete all as directed by Engr in charge | Repair andreplacement for Gasket Waasher for Radiator conservator tank Vent pipe etc complete all as directed by Engr in charge | 1 | No | DARJEELING | 30 |
| 5 | Replacement of Silicagel Breather 100 Gram | Replacement of Silicagel Breather 100 Gram | 1 | No | DARJEELING | 30 |
| 6 | Replacement of new oil seal for Bushing complete | Replacement of new oil seal for Bushing complete | 7 | Nos | DARJEELING | 30 |
| 7 | M and L for regeneration and filtaration of old or used Transformer oil complete | M and L for regeneration and filtaration of old or used Transformer oil complete | 200 | Ltr | DARJEELING | 30 |
| 8 | M and L for painting of Metal Primer outside main tank after proper scraping and cleaning complete with all accessories Spray painting with appn of double coat of synthetic enamel finish D A Grey | M and L for painting of Metal Primer outside main tank after proper scraping and cleaning complete with all accessories Spray painting with appn of double coat of synthetic enamel finish D A Grey | 1 | Job | DARJEELING | 30 |
| 9 | Replacement of new transformer oil Make Power Oil or Castrol for topping up | Replacement of new transformer oil Make Power Oil or Castrol for topping up | 30 | Ltrs | DARJEELING | 30 |
| 10 | M and L for disconnecting L and U and shifting transformer of any cap and type from site loc to wksp and back to site and placing it to the existing loc and making all cconnect all as dire by E in c | M and L for disconnect L and U and shifting transformer of any cap and type from site loc to wksp and back to site and placing it to the existing loc and making all connection all as dire by E in c | 1 | Each Job | DARJEELING | 30 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3838959.pdf
GEM_BID
term-condition-of-repof-100-kva-transformer_2022-09-27-16-50-06_9183058353fe46e17f1fcaaf04c23695.pdf
BOQ
100-kva-transformer13_2022-09-27-16-50-06_415912b532ac026f1d8df42ce1e2be20.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .