Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.7 LAccepted-AOC TRIVANDRUM | L1 | Accepted-AOC Accepted being L1 bidder | |
| 2 | L2₹39.8 L+₹5.1 L (14.8%)Rejected-Finance 131 SANGAM NAGAR OPP NATIONAL SCHOOL SANGHVI PUNE 411027 | PUNE | MAHARASHTRA | 411027 | L2 | Rejected-Finance Being L2 bidder | |
| 3 | L3₹41.8 L+₹7.1 L (20.5%)Rejected-Finance NEAR SOLAPOKHARI PO INS CHILKA DIST KHURDA ODISHA 752 037 | KHORDHA | ODISHA | 752037 | L3 | Rejected-Finance Being L3 bidder | |
| 4 | Rejected-Technical 1 8 373 FLAT NO 704 KRISHE GARDEN BEGUMPET BEGUMPET HYDERABAD TELANGANA 500016 | MEDCHAL MALKAJGIRI | TELANGANA | 500016 | - | Rejected-Technical Due to bidders not submitted requisite documents as asked in short fall | |
| 5 | Rejected-Technical | - | Rejected-Technical Due to bidders not submitted requisite documents as asked in short fall |
| Sl No | Description | Qty | Unit | S C MOHANTY L3 | Vandan Enterprises L1 | LEO ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Design,supply, installation,testing and commissioning of roof mounted solar photo voltaic power plant 30KWp (AC) on existing OTM bldg (Admin Block) at ICGS Gopalpur, with power evacuation at 415V, 3 Phase 4 Wire system including connected civil works such as foundation ballast type modular mounting, structural frame work etc. complete all as per guide lines/norms issued by MNRE, OERC (Odisha Elrectricity Regulatory Commission) & Indian Meteorological Deptt viz solar radiation data,direct normal irradiance, global horizontal irradiance etc complete in all respect comprising the following:- | 1 | Each Job | 26,34,000 ₹26,34,000 Lowest | 26,80,000 ₹26,80,000 | 28,00,000 ₹28,00,000 |
| 1.01SOLAR PHOTO VOLTAIC MODULES: Each solar PV modules shall be poly crystalline type,wattage minimum 335Wp, the module efficiency shall be more than 16.99% at standard test conditions ,Required number of modules for the plant capacity 30 KWp OTM bldg (Admin Block) at ICGS Gopalpur with anti reflective coating and anti dust coating.Confirming to IEC 61215-Edition II ,IEC-61730 (Part I & II) and IEC-61701. Note:(i) Solar module and SPV cells used in the module should essentially be indigeneously manufactured in India (ii). PV modules shall be warrented for a minimum 25years(iii) PV modules must be warranted for their output peak watt capacity which should not be less than 90 % at the end of 10 years and 80% at the end of 25 years.. (iv) PV module shall be tested by any MNRE approved laboratory.(Solar PV modules- Maximum- 90 Nos) Make :- TATA/PANASONIC/EMMVEE/ADANI/VIKRAM SOLAR /RENEWSYS | ||||||
| 1.02RFID : Each PV module must use a RF identification tag mandatorily placed inside the module laminate, which must contain the following information: (i) Name of the manufacturer of PV Module (ii) Name of the Manufacturer of Solar cells (iii) Month and year of the manufacture(separately for solar cells and module) (iv) Country of origin (separately for solar cells and module) (v) I-V curve for the module (vi) Peak Wattage, Im, Vm and FF for the module (vii) Unique Serial No and Model No of the module (viii)Date and year of obtaining IEC PV module qualification certificate (ix) Name of the test lab issuing IEC certificate (x) Other relevant information on traceability of module as per ISO 9000 series. | ||||||
| 1.03Solar PV module GI frame work and Dead Weight : Ballast type modular mounting structure, fabricated from pre coated mild Steel / hot dipped Galvanized Iron section of suitable size with appropriate & optimum tilt angle according to site requirment to achieve maximum benefit of solar energy and suitable to withstand total 200 KM/Hr wind speed with sufficient quantum of Dead Load Fly Ash/PCC Brick/Block total weight 9000 Kg minimum as per Structural deign data complete all as specifed and as directed by Engineer in Charge. Note:- (a). Module mounting structure may require to be customized with respect to the site availability. (b)The contractor shall submit structural design on Stad- Pro based on Wind load of 200 kmph on the surface of the panel, live load and dead load of structure with solar panel & seismic zone III . Any deflection to the mounting structure shall be as per IS 800:2007 (c) Minimum thickness of galvanization should be at least 600 gsm. Test certificate of galvanization shall be submitted by contractor. (d) The structure will not be grouted on the roof and roof will not be damaged in any way during the installation, Any unintended damage done to water proofing/roof structure during installation shall be made good by the contractor at no extra cost as directed by GE. | ||||||
| 1.04Inter connection of Solar PV modules, connection to DC Control Box and Connection from DC Control Box to Inverter : DC cable single core 6 sqmm copper XLPE flexible conductor cable conforming to relevant IS weather proof, UV resistant, rated voltage 1100V grade including suitable type of copper lugs, suitable required qty of male & female MC4 connectors (M-10, F-10) & joints etc including Aluminim raceway for cable, complete as specifed and directed. MAKES: POLYCAB, FINOLEX,HAVELLS | ||||||
| 1.05DC Control Box -1No .Supply, fix and testing of DC control box/junction box, with mounting holes, Mounting Screws of required qty, for 30 KWp OTM bldg (Admin Block) at ICGS Gopalpur plant ,weather proof (IP - 65) suitable for outdoor duty with and including suitable rating of MCB breakers, string fuses with base ,copper bus bar, voltage grade 1100V etc for combining solar PV module output complete all specifed and as directed. | ||||||
| 1.06String Grid Invertor 01 Nos: Grid tie Solar string Invertor unit of capacity 30KWp (DC to AC 415 volt at given load condition, Three phase system),wall mounted, with efficiency not less than 97% conforming to IEC 600682-2/VDE standards with multifunctional LED indications with alarm LED/LCD digital display system with following specification complete .- 01Nos (i) Nominal voltage: 415V, +/- 10% 3phase 50Hz (ii) Microprocessor /DSP micro controller system (iii) IP65 (outdoor) Protection enclosure (iv) Grid frequency synchronization +/-3% range (v) No load losses<1% of rated power (vi) Ambient temperature 4°C to 60°C. (v) Conforms to IEC 62116 for Anti Islanding Protection. (vi) Internal protection features against any fault in feeder line and lightening fault in feeder. (vii)Protection features- Inverter should have following protections (a) Anti islanding (b) Over voltage protection (c) Over current protection (d) Over temperature protection (e) Reverse polarity Protection (f) Surge protection (g) Short Circuit (g) Frequency change (viii) MPP Trackers (ix) No. of Inputs: minimum 6 (x) Total Harmonic Distortion < 3%. (xi) Power Factor >90%. (xii) Inverter should be capable of synchronisation with grid supply. (xiii) Should have necessary support for Remote Monitoring System (RMS) Data logging system complete in-built with inverter (RJ45 port). | ||||||
| 1.07Make of RMS :- LAPP/DIGILINK/TOP/LEONE/SMA Make of cable :- LAPP/DIGILINK/TOP/LEONE Make of Invertor :- DELTA/SMA/SCHNEIDER/ABB/POWERON Note:- If Grid tied Solar Invertor capacity as specified is not available then the same of higher capacity as available will be provided at no extra cost by the contractor. | ||||||
| 1.08A data logging system for plant shall be provided to measure the following data through web based application with cloud storage minimum 1 year: (i) Solar irradiance : Solar Irradiance an integrating sensor (Pyranometer) mounted in the plane of the array. Read out should be integrated with data logging system (ii) Wind speed: Wind Speed:An integrated wind speed measurement unit be provided. (iii) Amb temperature and Module surface temp : Temperature Sensor : Integrated temp, sensors for measuring the ambient temp and module surface temp and to be provided complete with read outs integrated with the data logging system. (iv) Module surface temp (v) Total output Voltage & Current. (vi) Generation data KWh (per inverter and cumulative) (vii) Instantaneous generation in KW (Each invertor and cummulative) Note: Facility of Remote Monitoring to be installed on existing PC at GE office and mobile app facility to be provided. | ||||||
| 1.09Invertor to AC control box : Supply and laying 4core 16sqmm 1100V grade copper flexible cable required qty as per site requirment complete all as specifed. | ||||||
Tender Value
₹43.0 L
EMD Value
₹86,560
Closing Date
20 Jan 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Shri Avinash Mishra IDSE EE
Garrison Engineer (I) (CG) Bhubaneswar, Plot No 190/702, Kokila Residency, 2nd Floor, Anant Vihar, Post-Pokhariput, Bhubaneswar- 751020
PROVISION OF 30 KW SOLAR POWER PLANT
2023_MES_634172_1
8414/BBSR/06/E8
Open Tender
Miscellaneous Works
Item Rate
120 days
Gopalpur
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE (I) (CG) Bhubaneswar
₹86,560
Yes
11 Mar 2024
23 Dec 2023
27 Jan 2024
23 Dec 2023
20 Jan 2024
6 Jan 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design,supply, installation,testing and commissioning of roof mounted solar photo voltaic power plant 30KWp (AC) on existing OTM bldg (Admin Block) at ICGS Gopalpur, with power evacuation at 415V, 3 Phase 4 Wire system including connected civil works such as foundation ballast type modular mounting, structural frame work etc. complete all as per guide lines/norms issued by MNRE, OERC (Odisha Elrectricity Regulatory Commission) & Indian Meteorological Deptt viz solar radiation data,direct normal irradiance, global horizontal irradiance etc complete in all respect comprising the following:- | 1 | Each Job | - | - |
| 1.01 | SOLAR PHOTO VOLTAIC MODULES: Each solar PV modules shall be poly crystalline type,wattage minimum 335Wp, the module efficiency shall be more than 16.99% at standard test conditions ,Required number of modules for the plant capacity 30 KWp OTM bldg (Admin Block) at ICGS Gopalpur with anti reflective coating and anti dust coating.Confirming to IEC 61215-Edition II ,IEC-61730 (Part I & II) and IEC-61701.
Note:(i) Solar module and SPV cells used in the module should essentially be indigeneously manufactured in India (ii). PV modules shall be warrented for a minimum 25years(iii) PV modules must be warranted for their output peak watt capacity which should not be less than 90 % at the end of 10 years and 80% at the end of 25 years.. (iv) PV module shall be tested by any MNRE approved laboratory.(Solar PV modules- Maximum- 90 Nos)
Make :- TATA/PANASONIC/EMMVEE/ADANI/VIKRAM SOLAR /RENEWSYS | - | - | - | - |
| 1.02 | RFID : Each PV module must use a RF identification tag mandatorily placed inside the module laminate, which must contain the following information:
(i) Name of the manufacturer of PV Module
(ii) Name of the Manufacturer of Solar cells
(iii) Month and year of the manufacture(separately for solar cells and module)
(iv) Country of origin (separately for solar cells and module)
(v) I-V curve for the module
(vi) Peak Wattage, Im, Vm and FF for the module
(vii) Unique Serial No and Model No of the module
(viii)Date and year of obtaining IEC PV module qualification certificate
(ix) Name of the test lab issuing IEC certificate
(x) Other relevant information on traceability of module as per ISO 9000 series. | - | - | - | - |
| 1.03 | Solar PV module GI frame work and Dead Weight : Ballast type modular mounting structure, fabricated from pre coated mild Steel / hot dipped Galvanized Iron section of suitable size with appropriate & optimum tilt angle according to site requirment to achieve maximum benefit of solar energy and suitable to withstand total 200 KM/Hr wind speed with sufficient quantum of Dead Load Fly Ash/PCC Brick/Block total weight 9000 Kg minimum as per Structural deign data complete all as specifed and as directed by Engineer in Charge.
Note:- (a). Module mounting structure may require to be customized with respect to the site availability.
(b)The contractor shall submit structural design on Stad- Pro based on Wind load of 200 kmph on the surface of the panel, live load and dead load of structure with solar panel & seismic zone III . Any deflection to the mounting structure shall be as per IS 800:2007
(c) Minimum thickness of galvanization should be at least 600 gsm. Test certificate of galvanization shall be submitted by contractor.
(d) The structure will not be grouted on the roof and roof will not be damaged in any way during the installation, Any unintended damage done to water proofing/roof structure during installation shall be made good by the contractor at no extra cost as directed by GE. | - | - | - | - |
| 1.04 | Inter connection of Solar PV modules, connection to DC Control Box and Connection from DC Control Box to Inverter : DC cable single core 6 sqmm copper XLPE flexible conductor cable conforming to relevant IS weather proof, UV resistant, rated voltage 1100V grade including suitable type of copper lugs, suitable required qty of male & female MC4 connectors (M-10, F-10) & joints etc including Aluminim raceway for cable, complete as specifed and directed. MAKES: POLYCAB, FINOLEX,HAVELLS | - | - | - | - |
| 1.05 | DC Control Box -1No .Supply, fix and testing of DC control box/junction box, with mounting holes, Mounting Screws of required qty, for 30 KWp OTM bldg (Admin Block) at ICGS Gopalpur plant ,weather proof (IP - 65) suitable for outdoor duty with and including suitable rating of MCB breakers, string fuses with base ,copper bus bar, voltage grade 1100V etc for combining solar PV module output complete all specifed and as directed. | - | - | - | - |
| 1.06 | String Grid Invertor 01 Nos: Grid tie Solar string Invertor unit of capacity 30KWp (DC to AC 415 volt at given load condition, Three phase system),wall mounted, with efficiency not less than 97% conforming to IEC 600682-2/VDE standards with multifunctional LED indications with alarm LED/LCD digital display system with following specification complete .- 01Nos
(i) Nominal voltage: 415V, +/- 10% 3phase 50Hz
(ii) Microprocessor /DSP micro controller system
(iii) IP65 (outdoor) Protection enclosure
(iv) Grid frequency synchronization +/-3% range
(v) No load losses<1% of rated power
(vi) Ambient temperature 4°C to 60°C.
(v) Conforms to IEC 62116 for Anti Islanding Protection.
(vi) Internal protection features against any fault in feeder line and lightening fault in feeder.
(vii)Protection features- Inverter should have following protections (a) Anti islanding (b) Over voltage protection (c) Over current protection (d) Over temperature protection (e) Reverse polarity Protection (f) Surge protection (g) Short Circuit (g) Frequency change
(viii) MPP Trackers
(ix) No. of Inputs: minimum 6
(x) Total Harmonic Distortion < 3%.
(xi) Power Factor >90%.
(xii) Inverter should be capable of synchronisation with grid supply.
(xiii) Should have necessary support for Remote Monitoring System (RMS) Data logging system complete in-built with inverter (RJ45 port). | - | - | - | - |
| 1.07 | Make of RMS :- LAPP/DIGILINK/TOP/LEONE/SMA
Make of cable :- LAPP/DIGILINK/TOP/LEONE
Make of Invertor :- DELTA/SMA/SCHNEIDER/ABB/POWERON
Note:- If Grid tied Solar Invertor capacity as specified is not available then the same of higher capacity as available will be provided at no extra cost by the contractor. | - | - | - | - |
| 1.08 | A data logging system for plant shall be provided to measure the following data through web based application with cloud storage minimum 1 year:
(i) Solar irradiance : Solar Irradiance an integrating sensor (Pyranometer) mounted in the plane of the array. Read out should be integrated with data logging system
(ii) Wind speed: Wind Speed:An integrated wind speed measurement unit be provided.
(iii) Amb temperature and Module surface temp : Temperature Sensor : Integrated temp, sensors for measuring the ambient temp and module surface temp and to be provided complete with read outs integrated with the data logging system.
(iv) Module surface temp
(v) Total output Voltage & Current.
(vi) Generation data KWh (per inverter and cumulative)
(vii) Instantaneous generation in KW (Each invertor and cummulative)
Note: Facility of Remote Monitoring to be installed on existing PC at GE office and mobile app facility to be provided. | - | - | - | - |
| 1.09 | Invertor to AC control box : Supply and laying 4core 16sqmm 1100V grade copper flexible cable required qty as per site requirment complete all as specifed. | - | - | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
TENDER.pdf
Tender Document • 0.73 MB
Tendernotice_1.pdf
Tender Document • 0.09 MB
BOQ_709968.xls
BOQ • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .