Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹6.7 L+₹2.3 L (53.8%)Rejected-Finance PLOT NO 88 SHILPA COLONY HYDERNAGER RANGAREDDI TELANGANA 500049 | MEDCHAL MALKAJGIRI | TELANGANA | 500049 | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
21 Oct 2019, 11:00 amClosed
Director
ICAR-Indian Institute of Farming Systems Research, Modipuram, Meerut
Supply and Installation/ Commissioning of 250 KVA Transformer
2019_DARE_505833_1
3-3/Transformer/ST/2019-20
Open Tender
Electrical Goods/Equipment
Supply
45 days
ICAR-IIFSR, MODIPURAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹20,000
Yes
22 Aug 2020
24 Sept 2019
22 Oct 2019
24 Sept 2019
21 Oct 2019
24 Sept 2019
Name of the Items/goods
Supplying of 250 KVA Transformer with Installation, testing, commissioning including proper earthing of indoor type 250 KVA 11 KV/ 433 volts, 3 phase, 50 HZ copper wound, oil immersed naturally cooled. Delta/star connected (dyn11 vector group) with neutral brought out on star side. The transformer shall be contained in a mild steel radiator cooled tank and conforming to latest 4 star rating/level 2 confirming tolS-1180/2014 Part-I. The transformer shall be provided with cable end box on H.V. side and provision of bus trunking on L.V. side and painted with standard synthetic gray enameled paint. Must have all standard fitting and mountings.
TCC ENERGY SOLUTIONS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .