| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹20.0 L+₹97,062.70 (5.10%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹19.4 L
EMD Value
₹38,840
Closing Date
5 Jan 2026, 6:00 pmClosed
Aayukt Nagar Parishad Baran
Aayukt Nagar Parishad Baran
Construction of Nala from Mathura Mama house to Indrraj Ji Meena house and Vidhya Colony in Ward No. 2.
2025_DLB_523076_5
Nirman 85/2025-26
Open Tender
Civil Works
Percentage
90 days
Baran
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Aayukt Nagar Parishad Baran
₹38,840
Yes
10 Feb 2026
24 Dec 2025
6 Jan 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m
Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Cement Concrete Grade M-15 and above and PCC blocks
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Hot rolled deformed bars
Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
TechnicalRequirment.pdf
Tender Documents • 0.19 MB
BOQ_933026.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .