| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAdmitted-Finance | ₹3.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.8 CrAdmitted-Finance GSTIN: 18ADZPD3365P1ZNC O SRI BANAMALI DAS WARD NO 3 THAKURBARI ROAD P O BIJNI DIST CHIRANG ASSAM 783390 | CHIRANG | ASSAM | 783390 | ₹3.8 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical GALIAHATI DIST BARPETA 781301 | BARPETA | ASSAM | 781301 | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | kajalkrdas L2 | M/S Competent Infrastructure & Consulting Pvt. Ltd L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of temporary Bamboo bridge of 3.70m clear road waywith Bholuka or Barua Bamboo post 5nos. in each rows driven at least180cm. below ground level and rows not more than 150cm apart from center to center Bholuka or Barua Bamboo dham longitudinal groth both closely placed and tied with half bamboo 90cm to 120cm apart in both layers and ttwo layers of jati bamboo chattais ( top layer should bedigonally woven), 70 mm to 100 mm thick brushwood in between chattias should be tied with half jati bamboo on both ends, bamboo railing with bholuka or barua bamboo post placed at150cm apart jati or betua bamboo hand rails of two lines both side of every alternate rows.All tying must be done with cane or coir string and only mature bamboo should be used in work i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road. | 30 | Meter | 1,000 ₹30,000 | 1,000 ₹30,000 |
| 2.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) Depth upto 3 m i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road. | 290.85 | Cum | 1,000 ₹2.9 L | 1,000 ₹2.9 L |
| 3.00 | Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road. | 196.8 | Metre | 9,000 ₹17.7 L | 7,000 ₹13.8 L |
| 4.00 | Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000 mm) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road. | 331.2 | Metre | 9,000 ₹29.8 L | 7,000 ₹23.2 L |
| 5.00 | Levelling course for Pile Cap i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road. | 19.71 | Cum | 5,000 ₹98,560 | 5,000 ₹98,560 |
| 6.00 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road. | 301.95 | Cum | 22,000 ₹66.4 L | 22,000 ₹66.4 L |
| 7.00 | Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road. | 88.05 | tonne | 75,000 ₹66.0 L | 70,000 ₹61.6 L |
| 8.00 | Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test. i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road. | 534.5 | tonne | 500 ₹2.7 L | 500 ₹2.7 L |
| 9.00 | Pile load test on single vertical pile in accordance with IS:2911(Part-IV). b) Lateral load test i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road. | 50 | tonne | 500 ₹25,000 | 500 ₹25,000 |
| 10.00 | Integrity testing of pile using pile driving analyser or equivalent as approved by Engineer in charge and detailed in specification. Test to be carried out by approved reputed agency. Item to be include all incidental work to execute the job. i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road. | 8 | Each / Test | 50,000 ₹4 L | 50,000 ₹4 L |
Tender Value
₹3.5 Cr
EMD Value
₹7.1 L
Closing Date
24 Dec 2025, 2:00 pmClosed
Chief Engineer (EAP), PWRD, Fatasil Ambari
O/o The Chief Engineer (EAP), PWRD, Fatasil Ambari, Guwahati-781025, Assam
CE/EAP/ARRBP/OCB/Bridge1/Barpeta/30 Construction of Bridge in Barpeta/30 district Bridge No. 3/1 on NH31 to Gapal Ata Satra Road.
2025_PWRDW_48965_16
EAP/ARRBP/02/TENDERS/2024/57
Open Tender
Civil Works - Bridges
720 days
Barpeta District
Please refer Tender documents.
7 documents required · 7 mandatory
₹7,100
₹7.1 L
Yes
O/o The Chief Engineer (EAP), PWRD, Fatasil Ambari
23 Feb 2026
5 Dec 2025
24 Dec 2025
5 Dec 2025
24 Dec 2025
5 Dec 2025
5 Dec 2025 - 10 Dec 2025
10 Dec 2025
Construction of temporary Bamboo bridge of 3.70m clear road waywith Bholuka or Barua Bamboo post 5nos. in each rows driven at least180cm. below ground level and rows not more than 150cm apart from center to center Bholuka or Barua Bamboo dham longitudinal groth both closely placed and tied with half bamboo 90cm to 120cm apart in both layers and ttwo layers of jati bamboo chattais ( top layer should bedigonally woven), 70 mm to 100 mm thick brushwood in between chattias should be tied with half jati bamboo on both ends, bamboo railing with bholuka or barua bamboo post placed at150cm apart jati or betua bamboo hand rails of two lines both side of every alternate rows.All tying must be done with cane or coir string and only mature bamboo should be used in work i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) Depth upto 3 m i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000 mm) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Levelling course for Pile Cap i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test. i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork, Without plasticiser, RCC Grade M35, With Batching Plant, Transit Mixer and Concrete Pump Height upto 5m i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind the abutment, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification b) Sandy material i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure Without plasticiser, RCC Grade M35, as per drawing and Technical Specification' including steel shuttering formwork. Using Batching Plant, Transit Mixer and Concrete Pump i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Furnishing and Placing Reinforced /Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (N) Without Plasticiser - E) PSC Grade M-40 - (ii) For I-beam & slab , Case II - Using Batching Plant, Transit Mixer and Concrete Pump a) Height upto 5m . i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA / SAIL / Esser Steel / Jindal panther steel/ Shyam steel or equivalent) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Structural steel Built-Up-Girder (BUG) (Providing and launching Steel Truss of Structural steel BUG Super Structure including painting complete as per as per drawing and technical specifications under Section 1900 of MOST.) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 a) With crushed stone Nominal mix (1:2.5:5) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation). i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Painting on concrete surface (Providing and applying 2 coats of water-based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m.) For Plain surface i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) Depth upto 3 m i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. Without plasticiser
, PCC Grade M15 i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork, Without plasticiser, RCC Grade M35, With Batching Plant, Transit Mixer and Concrete Pump Height upto 5m i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall /return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical specification. i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surfaces behind the abutment, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. M30 For Footing i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 i) Stone / Boulder i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and comp g actin to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (i) Private Land i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 . i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
WBM Grading 2 , Using stone screening Type-B 11.2 mm for Gr.II - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. A. By Manual Means i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
WBM Grading 3 , Using stone screening Type-B 11.2 mm for Gr.III - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. A. By Manual Means i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Soil/ Sub-Grade stabilisation using non-woven Geo-Textiles/ Geo- Grids Providing and laying one layer of Non-Woven geotextile of minimum mass per unit area of 280gms/sqm.having minimum roll width of 5.0m treated with carbon black with physical properties as given in clause no 702.2.3. over 25mm thick compacted sand layer on a prepared subgrade as a filter media with necessary overlaps as per drawing and technical specification and as directed by the Engineer in charge complete. i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 900mm equilateral triangle i) Bridge No. 3/1 on NH-31 to Gapal Ata Satra Road.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.94 MB
LOT.pdf
Additional Documents • 0.50 MB
SBD_Barpeta_30.pdf
Tender Documents • 2.45 MB
BOQ_77885.xls
BOQ • 0.34 MB
Drawing_Barpeta_30.pdf
Additional Documents • 3.88 MB
Technical_Specification.pdf
Additional Documents • 2.26 MB
LOF.pdf
Additional Documents • 0.80 MB
ESMP_Barpeta_30.pdf
Additional Documents • 1.25 MB
AnnexureX.pdf
Additional Documents • 2.68 MB
Download all tender documents and submit your bid