Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹4.6 L (1.86%)Admitted-Finance | ₹2.5 Cr+₹4.6 L (1.86%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 Cr+₹9.6 L (3.92%)Admitted-Finance NO 25 OTTHAVADA STREET NEAR NEW BUS STAND ARAKKONAM 631 001 | ARAKKONAM | RANIPET | TAMIL NADU | 631001 | ₹2.6 Cr+₹9.6 L (3.92%) | L3 | Admitted-Finance |
| 4 | L4₹2.9 Cr+₹44.8 L (18.2%)Admitted-Finance | ₹2.9 Cr+₹44.8 L (18.2%) | L4 | Admitted-Finance |
| 5 | L5₹2.9 Cr+₹49.0 L (19.9%)Admitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹2.9 Cr+₹49.0 L (19.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Dillibabu L1 | V.JOTHIKUMARAVEL L2 | D RAVI L3 | A.H.CONSTRUCTIONS L4 | JD ENTERPRISES L5 | K S CONSTRUCTION L6 | ULTRAPOWER BUILDERS L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete. | 2,795 | cum | - | - | - | - | - | - | - |
| 2.00 | Supplying and filling river sand for foundation and basement including watering and consolidation in15 cm layers including cost of sand all labour lead lift etc. complete | 163 | cum | - | - | - | - | - | - | - |
| 3.00 | Plain cement concrete 1:3:6, using 12 to 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 163 | cum | - | - | - | - | - | - | - |
| 4.00 | RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone without formwork including cost of all materials, curing, all labour charges, lead, lift, etc. complete.for raft and other concretes ( excluding cost of steel reinforcement.) without form work | 357 | cum | - | - | - | - | - | - | - |
| 5.00 | RCC in CC 1:1 1/2:3, mix using 12 to 20 mm HBG machine crushed metal for cable duct wall with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement) with form work | 61 | cum | - | - | - | - | - | - | - |
| 6.00 | RCC 1:1 ½ :3 mix, using 12 to 20mm HBG machine crushed metal, for cable duct cover slab with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement) | 26 | cum | - | - | - | - | - | - | - |
| 7.00 | Plain cement concrete 1:2:4 using 12 to 20mm HBG machine crushed metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. Without form work | 2,060 | cum | - | - | - | - | - | - | - |
| 8.00 | Plain cement concrete 1:2:4 using12 to 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. With form work | 344 | cum | - | - | - | - | - | - | - |
| 9.00 | Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete. | 40 | M.T | - | - | - | - | - | - | - |
| 10.00 | Plastering with cm 1:3, 12mm thick for ceiling, beams, sunshade,plinth etc. including cost of cement, all materials,curing, labour, lead and lift etc., complete. | 1,558 | sqm | - | - | - | - | - | - | - |
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
19 Dec 2019, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru-Vi-Ka Indl Estate, Guindy, Chennai-32
Providing 230 KV side equipment plinth, supplying fabrication and erection of 230 KV lattice equipment structure for the proposed Vembakkam 230/110 KV SS in the premises of the existing Vembakkam 110 KV SS
2019_EB_148464_1
TP1-076/2019-20
Open Tender
Civil Works
Works
120 days
Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.7 L
Yes
19 Feb 2020
22 Nov 2019
20 Dec 2019
22 Nov 2019
19 Dec 2019
22 Nov 2019
Amount
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.
Supplying and filling river sand for foundation and basement including watering and consolidation in15 cm layers including cost of sand all labour lead lift etc. complete
Plain cement concrete 1:3:6, using 12 to 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone without formwork including cost of all materials, curing, all labour charges, lead, lift, etc. complete.for raft and other concretes ( excluding cost of steel reinforcement.) without form work
RCC in CC 1:1 1/2:3, mix using 12 to 20 mm HBG machine crushed metal for cable duct wall with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement) with form work
RCC 1:1 ½ :3 mix, using 12 to 20mm HBG machine crushed metal, for cable duct cover slab with form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, including cost of centering, shutting, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement)
Plain cement concrete 1:2:4 using 12 to 20mm HBG machine crushed metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. Without form work
Plain cement concrete 1:2:4 using12 to 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. With form work
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
Plastering with cm 1:3, 12mm thick for ceiling, beams, sunshade,plinth etc. including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Fabrication and supplying of ISI Foundation bolt threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 3 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including all material, labour, lead, lift etc., complete 20 mm dia 1750 mm length
Fabrication and supplying of Foundation bolt threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 3 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including all material, labour, lead, lift etc., complete 20 mm dia 900 mm length
Assembling of template for all Structures including cost of template, transport charges all labour lead, lift, etc, complete.
Supplying, fabrication and transporting of various equipments lattice structure including cost of all materials for ISI G.I angles, hot tip galvanising, all labour, lead, lift, etc. complete.
Supplying, fabrication and transporting of various size of ISI GI Bolt&Nut with washer as per IS standards and approved by competent authority before erection as per the requirement to site including cost of material lead lift labour etc complete.
Labour charges for transporting and erection of towers with bolt nut including sorting out of tower parts tightening, punching of bolts and nuts and rectification of defects if any during erection, cost of lead lift labour etc complete.
Exterior Emultion Painting two coats with approved quantity White cement over a waterbase primer as priming coat, including cost of all materials, labour, lead, lift, T&P, etc. complete.
Clearing Jungles including cost of all labour, lead,lift,and away from the site. etc. complete.
Dismantling the existing PCC including cost of all labour charges, T & Ps etc., complete.
Dismantling the existing RCC including cost of all labour charges, T & Ps etc., complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
V.JOTHIKUMARAVEL
D RAVI
A.H.CONSTRUCTIONS
JD ENTERPRISES
K S CONSTRUCTION
ULTRAPOWER BUILDERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_178820.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .