Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹6.8 L
EMD Value
₹6,760
Closing Date
10 Aug 2022, 2:00 pmClosed
Superintending Engineer/VEDC/Vellore
10 th East Main Road, Gandhinagar, Vellore
Works Contract for Transport, Insertion of poles, Replacement of poles Erection of 33KV lines, dismantling of exist 33KV lines and other works in 33KV Punnai feeder from 110/33-11KV Kaveripakkam SS under RDSS in rural/panapakkam section
2022_EB_244843_1
0412029
Open Tender
Electrical Works
Works
365 days
vellore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,760
20 Aug 2022
30 Jul 2022
11 Aug 2022
30 Jul 2022
10 Aug 2022
30 Jul 2022
Amount
Excavation and Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual with base plate.
Excavation and Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding, Stay Plate etc.
Fixing of HT Tapping X arm / V Cross arms 3 1/2, 4 1/2 & 5 feet
Fixing of HT / LT TI Fitting
Fixing of HT Pin Insulators (11/33KV)
Fixing of HT 33 KV stain disc
Paving and stringing of conductors of sizes dog(6/4.727/1.57MM) or other equivalent conductor/AB Cable. (route length)
Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM
Transporting of all types of poles by bullock cart or other vehicle (for all size of poles including loading and unloading) for a lead upto 5KM
Transporting of all types of poles by bullock cart or other vehicle (for all size of poles including loading and unloading) Above 5KM of lead of every KM
Transporting of Distribution Transformer / Line materials from Sub stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
Transporting of Distribution Transformer / Line materials from stores to office/ site above 10KM distance by engaging 1 ton capacity Minidor(lorry)
Loading/Unloading of variouse size of REC, RCC,PSC Poles above 8.0m length
Loading of conductor
Unloading of conductor
Loading/Unloading of line material
Dismantling of conductor of upto 7/3.35/AB cable including transporting the conductor to the nearest road side and stocking in coils
Earthing of poles with GI wires 4/ 6/8 SWG by coil earthing
Cement Concrete of ratio for individual poles shall be in the ratio of 1:2:4 (1 part Cement, 2 parts coarse sand and 4 parts 20mm aggregate stones chips)(material +labour) sleeve concreting of poles
Cement Concrete of ratio for stay set foundation shall be in the ratio of 1:3:6 (Cement concrete in mixture 1 part cement, 3 part coarse sand, 6 part 40mm size aggregate stone chips).
Numbering of each Poles with black letters in Yellow base by using stencils/skilled painters (including cost of paint per pole).The height of the lettering shall be 40mm for numbers and 50mm for alphabets.
Painting of all types of X arm and TI fitting with Aluminium Paint (including cost of paint)
Tree cutting
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .