Tender Value
₹3.4 Cr
EMD Value
₹6.7 L
Closing Date
24 Jun 2026, 3:00 pm
SC Division: Replacement of Leaning/critical less contact wire height OHE structures due to raising of track with new OHE structure in connection with safety in KZJ-WD section.
C-E29-TRD-09-2026-27
C-E29-TRD-09-2026-27
Open
12 Months
Unknown (Unspecified Location)
₹0
₹6.7 L
1 Jun 2026
1 Jun 2026
10 Jun 2026
2-SCHEDULE A2: FOUNDATION ITEMS (incl. Supply & Erection) 6407508.00 Below/P
5-SCHEDULE B3: INSULATOR SUPPLY 1744587.00 Below/P
Item Breakup - 1-SCHEDULE A1: OHE & PSI ITEMS
Square Supply and Erection Foot Total 279620.00 Item- 2 1(g) Design and Preparation of Structure Erected Drawing (SED). S No. Item Description of Item Unit Qty Rate Amount No
Supply and Erection Total 120240.00 Item- 3 3(a) Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations. S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 270270.00 Item- 4 3(b) Erection of TTCs, Portals and Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 167937.00 Item- 5 3(e)Supply and Erection of Guy Rod Assembly S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 125412.00 Item- 6 4(a)(i) Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 2738340.00 Item- 7 4(a)(ii) Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 38856.00 Item- 8 4(a)(iii) Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 11154.00 Item- 9 4(a)(iv)Supply (without Insulators) and Erection of Single Cantilever Assembly for Tramway OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 19020.00 Item- 10 4(b)(i)Supply (without Insulators) and Erection of a Pull Off arrangement for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 45912.00 SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY 8(a)(v) Supply and Erection of Regulating Equipment WithCounter-Weightassembly for Item- 11 Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 447498.00 8(a)(vi)Supply and Erection of Regulating Equipment With Counter-Weight assembly for Tramway Item- 12 Type OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 115136.00 Item- 13 8(b)(ii) Supply (without Insulator) and Erection of Materials for Termination of Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 37284.00 Item- 14 8(b)(vi)Supply (without Insulator) and Erection of Materials for Termination of Tramway OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 11016.00 9(a) Supply (without Insulators) and Erection of Anti-creepwithgalvanizedsteelwirefor Conventional Item- 15 OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 101488.00 9(b)Supply (without Insulators) and Erection of Anti-creep with galvanized steel wire for regulated Item- 16 Tramway OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 49018.00 Item- 17 11(a)(i) Supply (without Insulator) and Erection of 25 kV Solid Core Cut-in Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 41120.00 Item- 18 11(a)(ii) Supply (without Insulator) and Erection of 25 kV Solid Core Suspension Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 10064.00 Item- 19 11(b) Supply (without Insulator) and Erection of 25 kV Post Insulator S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 9488.00 SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY 12(a) Supply (without Insulators) and Erection of 25 kV Section Insulator Assembly for Conventional Item- 20 OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 110094.00 13(a)Supply (without Insulators) and Erection of 25 kV Single Pole Isolator without earth contact Item- 22 assembly S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 172076.00 13(b)Supply (without Insulators) and Erection of 25 kV Double Pole Isolator without earth contact Item- 23 assembly. S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 142830.00 Item- 24 13(c)Supply and Erection of Earth Contact Assembly for an Isolator S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour /Erection Total 82614.00 Item- 25 13(d)Supply and Erection of an Interlocking device S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 29424.00 15(a)Supply and Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) Item- 26 (excluding copper jumper supply) S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour /Erection Total 48928.00 Item- 27 15(b) Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 44896.00 Item- 28 16(a) Supply and Erection of Structure Bond S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 204660.00 Item- 29 16(b) Supply and Erection of Longitudinal Bond S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 17560.00 SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Item- 30 16(c) Supply and Erection ofTransverse & Special Bond S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 25540.00 Item- 31 16(aa) Drilling of Holes on Rails S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 27820.00 Item- 32 16(d)Supply and Erection of Structure Bond on Platform Area S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 31896.00 Item- 33 17(a) Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc. S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 29148.00 31(a)Transfer of Overhead Equipment from one Mast or Support to another, including removal of Item- 34 Cantilever Assembly from old Mast or Support S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 374000.00 Item- 35 31(b) Provision of additional bracket assembly/assemblies on a mast or support S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 55584.00 Item- 36 31(e)Splicing and Extension of Anchored OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 15348.00 Item- 37 31(f)Dismantling of Section Insulator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 7866.00 Item- 38 31(g)Slewing and Putting back of OHE in original position S No. Item Description of Item Unit Qty Rate Amount No
Each Labour / Erection Span Total 82296.00 Item- 39 31(h)Dismantling of an Isolator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 5340.00 Item- 40 31(i) Dismantling of Post Insulator S No. Item Description of Item Unit Qty Rate Amount No SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
Labour / Erection Total 2688.00 Item- 41 31(j)(i) Dismantling of Suspension Insulator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 1976.00 Item- 42 31(j)(ii) Dismantling of Cut-in Insulator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 4712.00 Item- 43 31(k)(i) Dismantlement of OHE Mast or structure by cutting S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 551160.00 Item- 44 31(k)(ii) Dismantlement of Upright of TTC/Portal by cutting S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 35008.00 Item- 45 31(l)(i) Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 230400.00 Item- 46 31(n) Dismantling of Guy Rod S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 6288.00 31(o) Releasing of Multiple Cantilever Crossarm cantilever assemblies where single cantilever Item- 47 assembly is leftover S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 6288.00 Item- 48 31(p) Dismantling of Drop Arms/Booms/ Temporary Masts S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 10718.00 Item- 49 31(r) Dismantling of Cantilever Assembly including Insulators S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 5760.00 Item- 50 31(s) Dismantling of Fabricated Steel or Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 1418.00 31(t)(i Dismantling of a Regulating Equipment (Three- pulley type) with counter weight assembly Item- 51 for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Total 15252.00 31(t)(ii) Dismantling of a Regulating Equipment (Three-pulley type) with counter weight assembly Item- 52 for Tramway OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 3748.00 Item- 53 31(t)(iii) Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 8880.00 Item- 54 31(t)(iv)Dismantling of all types of Copper Jumpers S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 7560.00 Item- 55 31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 3090.00 Item- 56 31(t)(vi) Dismantling of Termination for Tramway type Overhead Equipment S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 1030.00 Item- 57 31(t)(ix) Re-adjustment of OHE Spans, including droppers S No. Item Description of Item Unit Qty Rate Amount No
Each Labour / Erection Span Total 700160.00 Item- 58 31(t)(x) Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 26100.00 32/3(a) Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations Item- 59 under power block S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 270270.00 Item- 60 32/3(b) Erection of TTCs, Portals and Small Parts Steel (SPS) under power block S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 167937.00 Item- 61 32/3(e) Supply and Erection of Guy Rod Assembly under power block S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 13440.00 32/4(a)(i) Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional Item- 62 OHE under power block S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Total 194400.00 32/4(a)(ii) Erection of Two Cantilever Assemblies on same structure or support for Conventional Item- 63 OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 38856.00 32/4(a)(iii) Erection of Three Cantilever Assemblies on same structure or support for Conventional Item- 64 OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 11154.00 Item- 65 32/4(b)(i)Supply (without Insulators) and Erection of a Pull Off arrangement for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 3140.00 Item- 66 32/8(a)(v) Erection of Regulating Equipment With Counter-Weight assembly for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 24000.00 32/8(a)(vi)Supply and Erection of Regulating Equipment With Counter-Weight assembly for Item- 67 Tramway Type OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 8000.00 Item- 68 32/8(b)(ii) Erection of Materials for Termination of Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 4480.00 Item- 69 32/8(b)(vi)Supply (without Insulator) and Erection of Materials for Termination of Tramway OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 2000.00 Item- 70 32/9(a) Erection of Anti-creep with galvanized steel wire for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 13488.00 32/9(b)Supply (without Insulators) and Erection of Anti-creep with galvanized steel wire for Item- 71 regulated Tramway OHE under power block S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 6744.00 Item- 72 32/11(a)(i) Erection of 25 kV Solid Core Cut-in Insulator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 11376.00 Item- 73 32/11(a)(ii) Erection of 25 kV Solid Core Suspension Insulator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Total 1976.00 Item- 74 32/11(b) Erection of 25 kV Post Insulator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 2688.00 32/12(a) Supply (without Insulators) and Erection of 25 kV Section Insulator Assembly for Item- 75 Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 6234.00 32/13(a)Supply (without Insulators) and Erection of 25 kV Single Pole Isolator without earth contact Item- 76 assembly S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 11564.00 32/13(b)Supply (without Insulators) and Erection of 25 kV Double Pole Isolator without earth Item- 77 contact assembly. S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 8376.00 Item- 78 32/15(a) Supply and Erection of 50 sq.mm Copper Jumper (C Jumper, F-Jumper, Anti-Theft Jumper) S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 15664.00 Item- 79 32/15(b) Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 10880.00 32/31(a) Transfer of Overhead Equipment from one Mast or Support to another, including removal Item- 80 of Cantilever Assembly from old Mast or Support S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 374000.00 Item- 81 32/31(b) Provision of additional bracket assembly/assemblies on a mast or support S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 55584.00 Item- 82 32/31(e) Splicing and Extension of Anchored OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 15348.00 Item- 83 32/31(f) Dismantling of Section Insulator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 7866.00 Item- 84 32/31(g) Slewing and Putting back of OHE in original position S No. Item Description of Item Unit Qty Rate Amount No SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
Each Labour / Erection Span Total 82296.00 Item- 85 32/31(h) Dismantling of an Isolator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 5340.00 Item- 86 32/31(i) Dismantling of Post Insulator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 2688.00 Item- 87 32/31(j)(i) Dismantling of Suspension Insulator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 1976.00 Item- 88 32/31(j)(ii) Dismantling of Cut-in Insulator S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 4712.00 Item- 89 32/31(k)(i) Dismantlement of OHE Mast or structure by cutting S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 551160.00 Item- 90 32/31(k)(ii) Dismantlement of Upright of TTC/Portal by cutting S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 35008.00 Item- 91 32/31(l)(i) Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 230400.00 Item- 92 32/31(n) Dismantling of Guy Rod under power block S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 6288.00 32/31(o) Releasing of Multiple Cantilever Cross arm cantilever assemblies where single cantilever Item- 93 assembly is leftover S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 6288.00 Item- 94 32/31(p) Dismantling of Drop Arms/Booms/ Temporary Masts S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 10718.00 Item- 95 32/31(r) Dismantling of Cantilever Assembly including Insulators S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Total 5760.00 Item- 96 32/31(s) Dismantling of Fabricated Steel or Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 1418.00 32/31(t)(i) Dismantling of a Regulating Equipment (3-pulley type) with counter weight assembly for Item- 97 Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 15252.00 32/31(t)(ii) Dismantling of a Regulating Equipment (Three-pulley type) with counter weight Item- 98 assembly for Tramway OHE S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 3748.00 Item- 99 32/31(t)(iii) Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 8880.00 Item- 32/31(t)(iv) Dismantling of all types of Copper Jumpers 100 S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 7560.00 Item- 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 101 S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 3090.00 Item- 32/31(t)(vi) Dismantling of Termination for Tramway type Overhead Equipment 102 S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 1030.00 Item- 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 103 S No. Item Description of Item Unit Qty Rate Amount No
Each Labour / Erection Span Total 700160.00 Item- 34(j)Providing and Laying Pitching with Stone Boulders 105 S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour Total 399540.00 Item- 36(a) Unloading of all types of Steel Structures 106 S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 14000.00 SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Item- 36(b) Loading of all types of Steel Structures 107 S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 24000.00 Item- 37(a) Unloading of all types of Copper & Aluminium conductors 108 S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 240.00 Item- 37(b) Loading of all types of Copper & Aluminium conductors 109 S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 240.00 Item- 38 Transportation of OHE structures / Materials / Equipments 110 S No. Item Description of Item Unit Qty Rate Amount No
Labour / Erection Total 290000.00 Item- 40(a) Supply and Erection of Number Plate (Enamel Type) 111 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 123200.00 Item- 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 112 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 28752.00 Item- 41(c) Supply and Erection of Enamel type Staff Caution board 113 S No. Item Description of Item Unit Qty Rate Amount No
Supply /Purchase
Labour / Erection Total 12504.00 Item- 41(d)Supply and Erection of Retro-Reflective Type Electric Engine Stop Board/Caution Unwired 114 Turnout Board S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 14356.00 Item- 41(e) Supply and Erection of Retro-Reflective Type Power Block Working Limit Board 115 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 5852.00 SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Item- 41(f)Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 116 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 2004.00 Item- 41(g)Supply and Erection of Retro-Reflective type Danger Board for Height Gauge 117 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 10964.00 Item- 41(h)Supply and Erection of Vitreous Enameled 25 kV Danger Board with skull & bones for Overline 118 Structure (OLS) and Auxiliary Transformer S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 6372.00 Item- 41(i)Supply and Erection of Enamel Protected Area Board 119 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 3308.00 Item- 41(j) Supply and Erection of Retro-Reflective Sigma Board 120 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 6952.00 Item- 42Supply and Erection of Shock Treatment Chart 121 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase
Labour / Erection Total 6132.00
Item Breakup - 2-SCHEDULE A2: FOUNDATION ITEMS (incl. Supply & Erection)
Supply and Erection Total 200080.00 Item- 2(a)(ii) Concrete for foundations and plinth in Rocky Soil 123 S No. Item Description of Item Unit Qty Rate Amount No
Supply and Erection Total 123108.00 Item- 2(b) Concrete for foundations and plinth in other than Hard and Rock Soil 124 S No. Item Description of Item Unit Qty Rate Amount No
Supply and Erection SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Total 5907200.00 Item- 2(i) Breaking of foundation up to 200 mm below track formation and drain / PF surface etc 125 S No. Item Description of Item Unit Qty Rate Amount No
Supply and Erection Total 177120.00
Item Breakup - 3-SCHEDULE B1: STEEL SUPPLY
Supply / Purchase Total 10309572.00 Item- 3(bs) Supply of Fabricated and Galvanized structures such as TTCs, Portals, other than masts (TTC- 127 9) S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 406110.00 Item- 3(cs) Supply of Fabricated and Galvanized Small Parts Steel (SPS) other than Masts, TTCs and 128 Portals. S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 1178048.00
Item Breakup - 4-SCHEDULE B2: COPPER SUPPLY
Supply / Purchase Total 270000.00 Item- 6(ds) Supply of 5 mm dia Hard Drawn Round Copper Dropper Wire 130 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 125000.00 Item- 15(as) Supply of 50 sq.mm Annealed Stranded Copper Jumper Wire 131 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 201760.00 Item- 15(bs) Supply of 160 sq.mm Annealed Stranded Copper Jumper Wire 132 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 1084000.00
Item Breakup - 5-SCHEDULE B3: INSULATOR SUPPLY
Supply / Purchase Total 1313550.00 SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Item- 8(bx) Supply of Porcelain 9-ton Insulator for item no. 8(b)(ii)/8(b)(iii)/8(b)(vi)/8(b) 134 (ix)/9(a)/9(b)/9(c)/9(d)/11(a)( i)/11(a)(ii) S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 124350.00 Item- 11(bx) Supply of Post Insulator for Item no. 11(b) 135 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 44464.00 Item- 12(ax) Supply of Sectioning and 9-ton Insulators for Item no. 12(a) 136 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 128616.00 Item- 12(bx)Supply of Sectioning Insulator for Item no. 12(b) 137 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 19719.00 Item- 13(ax)Supply of Post and Operating Rod Insulators for Item no. 13(a) 138 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 56944.00 Item- 13(bx)Supply of Post and Operating Rod Insulators for Item no. 13(b) 139 S No. Item Description of Item Unit Qty Rate Amount No
Supply / Purchase Total 56944.00
Item Breakup - 6-SCHEDULE C: GENERAL ITEMS
Labour/Erection Total 16000.00 Item- 18(z)(i) Supply of Paint and Stenciling/Painting of mast location, RL, MRL, EC socket symbols and 141 implantations on OHE masts/portals S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 113600.00 Item- 18(z)(ii) Supply of Paint and Painting of ATD Counter Weight including Temperature Marking of 'Y' 142 value for 15°C, 35°C & 45°C S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 4872.00 Item- 18(z)(iii) Supply of Paint and Painting of any type of Bond 143 S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Total 11200.00 Item- 18(z)(iv) White Washing for copping of mast/portal foundations 144 S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 15000.00 Item- 19(z) Trimming/Cutting of Tree Branches including disposal of branches/Bushes outside yard (Note: 145 Girth of more than 20 cm will only be considered as tree branch) S No. Item Description of Item Unit Qty Rate Amount No
Supply and Labour/Erection Total 10200.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Technicalspecificationandstandarddrawings.pdf Technical spec and Drawings
ATTACHMENT
GCCCorrectionslipslatestupto11.pdf
ATTACHMENT
SpecialconditionsofContract.pdf
ATTACHMENT
MasterTenderDocument_1.pdf
ATTACHMENT
StandardGeneralConditionsofcontract2.pdf
ATTACHMENT
Instructionsofthetenderer09202627.pdf
ATTACHMENT
IRSGCCApril2022.pdf
ATTACHMENT
ExplanatoryNotes09202627.pdf
ATTACHMENT
Technicalspecificationandstandarddrawings.pdf
ATTACHMENT
Download all tender documents and submit your bid