| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 CrAccepted-Finance | ₹8.8 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹9.6 Cr+₹86.6 L (9.89%)Accepted-Finance | ₹9.6 Cr+₹86.6 L (9.89%) | L2 | Accepted-Finance L2 |
| 3 | L3₹9.9 Cr+₹1.2 Cr (13.4%)Accepted-Finance | ₹9.9 Cr+₹1.2 Cr (13.4%) | L3 | Accepted-Finance L3 |
| 4 | L4₹10.4 Cr+₹1.6 Cr (18.4%)Accepted-Finance D 1 23 IST FLOOR VASANT VIHAR NEW DELHI 110057 | NEW DELHI | DELHI | 110057 | ₹10.4 Cr+₹1.6 Cr (18.4%) | L4 | Accepted-Finance L4 |
| 5 | L5₹10.4 Cr+₹1.6 Cr (18.7%)Accepted-Finance 04 PANKAJ KANNAUJIA SONADIH ROAD NAUKAPURA BELTHARA ROAD BALLIA BALLIA UTTAR PRADESH 221715 | BALLIA | UTTAR PRADESH | 221715 | ₹10.4 Cr+₹1.6 Cr (18.7%) | L5 | Accepted-Finance L5 |
Tender Value
₹9.6 Cr
EMD Value
₹19.3 L
Closing Date
30 Apr 2026, 3:00 pmClosed
Executive Engineer SWR-II
O/o EE SWR-II Under Dabri Flyover, Pankha Road, ND
Construction of 6,75,000 litre UG Tank with inlet and screening chambers and laying of 1000mm DI of K-9 from Jharoda Village to Mungeshpur Drain under SD-II, SWR-II, Najafgarh, New Delhi. (SH Civil and Electrical Work).
2026_PWD_290195_1
01/SE/SOUTH WEST CIRCLE/PWD/2026-27/R-1 (01/EE/SWR-II/PWD/2026-27/R-1)
Open Tender
Composite Works
Works
120 days
New Delhi
As per tender documents
12 documents required · 12 mandatory
₹0
₹19.3 L
6 May 2026
22 Apr 2026
30 Apr 2026
22 Apr 2026
30 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. 1.1) All kinds of soil | |||||
| 2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | |||||
| 3Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. | |||||
| 4Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | |||||
| 5Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres | |||||
| 6Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. 6.1) With medium setting bitumen emulsion | |||||
| 6.01 | On W.B.M / W.M.M. @ 0.4kg/sqm | - | sqm | - | - |
| 6.02 | On bituminous surface @ 0.25kg/sqm | - | sqm | - | - |
| 7Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. | |||||
| 7.1 | 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.44 MB
BOQ_385232.xls
BOQ • 0.50 MB
NIT01R.pdf
Tender Documents • 6.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .