Tender Value
₹17.3 L
EMD Value
₹18,000
Closing Date
12 Feb 2026, 3:00 pmClosed
BDO BP
The Block Development Office, Karimangalam
Can be seen in the tender documents
2026_RDTN_651257_1
Roc.No.3455-2022-A2 dt 04.02.2026
Open Tender
Civil Works
Item Rate
The Block Development Office, Karimangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹18,000
Yes
13 Feb 2026
4 Feb 2026
12 Feb 2026
4 Feb 2026
12 Feb 2026
4 Feb 2026
Construction of Anganwadi Building @ Keragodahalli H/o Keragodahalli
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc. complete. (For Depth upyo 0.30m) Main Column Toilet Column GB Main wall alround Cross wall D/F Column Area D/F Column Area Step Infront of Building Septic tank Inlet Outlet Chamber Plinth Protecion wall Ramp wall to EWC Ramp wall to Hall
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. Flooring Hall Kitchen Store Baby Toilet EWC
Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete. Flooring Hall Kitchen Store Baby Toilet EWC D/F WC Ramp to EWC Ramp to Hall Ramp to Hall Ramp Landing at Step
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed Main Column Toilet Column Grade Beam Main wall alround Cross wall D/F Column Area Steptic tank Plinth Protecion wall Ramp wall to EWC Ramp wall to Hall Flooring Hall Kitchen & Store Baby Toilet D/f WC Step Plinth Protection Ramp at EWC Ramp at Hall Ramp at Landing
Cement concrete 1:2:4 mix using 20mm metal including cost and Conveyance of all site etc. Complete. Plinth Protection
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Basement,wall alround,CW Between Kit. & Hall, Super Structure wall alround upto lintel,CW Between Kit. & Hall & WC,wall alround lintel to roof,C/W,CW Bet. Toilet & EWC Store wall ,Store wall Parapet alround,Parapet -WC-3 side For shelf @ ,Kitchen Platform Septic tank wall alround Baffle wall,Step I,Step II,Step III Plinth Protection,Hall self wall Kitchen self wall,Kitchen self wall Kitchen slab wall,store slab wall Handrails,Ramp to EWC Ramp to Hall,Ramp to Hall Ramp to Hall,Ramp ,Deductions Door D2,Door D in Store,Door D1 Windows ,Ventilator Jolly,Column Portion,Column Portion,Lintel ,Lintel for cross wall ,Lintel for cross wall ,Roof level beam,Roof Level Beam Hall & Kit., Tee Beam
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle Column , Column up to Grade Beam, Column Bet. Grade & Bas, Grade beam Inner, Alround, C/W Basement to Top of Parapet For Columns, For Columns Toilet, Deductions Lintel Alround, Cross wall, Cross wall - Kitchen & Store Roof Beam Alround, Cross wall, Tee beam Roof Slab - Ceiling Hall, Kitchen, Store, Toilet, Outsides alround, Toilet Outside alround, Roof Rear Projection Bottom Door D, Door D in Store, Door D1, Windows , Ventilator, Jolly, Septic tank, Septic tank alround Sunshade Front window & door, Loft in store, Loft in store, Rear side windows
Basement to Top of Parapet For ColumnsFor Columns Toilet, Deductions Lintel Alround, Cross wall, Cross wall- Kitchen & store Roof Beam Alround, crosswall, Tee beam Roof Slab- Ceiling Hall, Kitchen, Store, Toilet, Outsides alround, Toilet Outside alround, Roof Rear Projection Bottom Door D, Door D in store, Door D1, Windows, Ventilator, Jolly, Septic tank alround Sunshade Front window & door, Loft in store, Loft in store, Rear side windows
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs Column Matt, Coping, Column, Coping, Column up to Grade Beam, Column up to Grade Beam, Column Bet. Grade & Base,Column Bet. Grade & Base Grade beam Alround, Cw, For Columns, For Columns Toilet, Lintel Alround, Cross wall, Cross wall Roof level Beam Alround, Cross wall, Tee beam, Sill Slab, loft in store, Sunshade Front, rear side windows, Roof Slab, Toilet Roof Slab, D/F column in lintel, D/F column in Roof beam
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Supplying and applying of two coars of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface whall then be allowed to dry for atleast 48 hours. It shall then be sand papered (Waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2 nd coar of putty atfer 6 hours of 1st coar of putty and then sand papering(Waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly etc., complete complying with standard specifications and as directed by the Departmental Officers IThe rates are inclusive of hire charges for grinding machine with wheet, coast of sand paper(Water proof abrasive sheet) cost of putty blade, labour charges for grinding the joints and sand papering two coat of putty, scrapping the putty area to level the surface smooth, etc., complete) The putty should be got approved by the Executive Engineer before use on work. Ceiling Hall, Kitchen, Store, Tee Beam Sides, Baby Toilet
Special Ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs , beams, sunshades, facia, canopyslab, staircase waist slab, landing slab etc., with cement mortar 1:3 (one cement and three P.Sand) 10mm thick including hacking the surfaces, p[roviding cement mortar nosing beading for sunshades, staircases steps landing slabs and curing etc., in all floors complying with standard specification and as directed by the departmental officers. Bottom Door D,Door D in Store,Door D1,Windows W,Ventilator,Jolly,Sunshade Front,Rear Sunshade, Front Sunshade Side, Rear Sunshade Side
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. Septic Tank Inner, Cross wall, Septic Tank Bottom, Septic tank Top
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Hall, Kitchen, Store, Baby Toilet, EWC, For shelf @, Kitchen Platform , Outer alround, Toilet 3 Sides Soffits Door D, Door D in Store, Door D1. Windows w, Ventilator, Jolly, Ramp wall, Parapet wall inner alround, Parapet Top, Step Sides 1,Step Sides 2, Step Sides 3, Deductions Door D in Store, Door D1. Windows w, Ventilator, Jolly,
Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dses Roof Slab, Main Building Splash Portion Toilet Portion Splash Portion
Finishing the top of roof with one copurse of machine pressed tiles of size 230mm x 230mm x20mm of approved quality set in Cement Mortar 1:3 (One Cement and three crushed stone M.Sand) 12mm thick wiith water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specifications and as directed by the departmental officers. Main Building Splash Portion Toilet Portion Splash Portion
Paving the floor with best quality Vetrified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. Flooring, hall,Side alround
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick including finishing the joints neatly completed.Flooring, Toilet. D/F WC
Dadooing walls with Colour Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard.Toilet sides alround, Toilet sides alround, D/F Door D, D/F Door D2
Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed. i. 20mm thick for Resid Step Ramp Top, Ramp Top, Ramp Top, Kitchen, store
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete Ceiling Hall, Kitchen, Store,Tee Beam Sides,Baby Toilet, Bottom Door D, Door D in Store, Door D1, Windows W, Ventilator, Jolly, Sunshade Front, Rear Sunshade, Hall, Kitchen, Store, Baby Toilet, EWC, For shelf @ ,Kitchen Platform Soffits Door D, Door D in Store, Door D1, Windows W, Ventilator, Jolly,Ramp wall Deductions Door D, Door D in Store, Door D1, Windows W, Ventilator, Black Board Paiting
Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.Schedule ItemNo.359 – B) Outer alround, Toilet 3 Sides, Parapet wall inner alround, Parapet Top, Front Sunshade Side, Rear Sunshade Side, Deductions, Door D, Windows W, Ventilator
Black Board Paint Two Coats with Approved Cement Paint over Cement Plastered surface including cost and conveyance of materials and labour charges etc complete. Black Board
Painting two Coats over New iron Works using best quality of enamel paint including cost and conveyance of materials and labour charges etc complete. Door D, Door D in Store, Door D1, Windows W, Ventilator
Supply and Cost of Steel door , Window, Ventilator Door D (1.10x 2.40m)
Door D1 (0.75 x 1.50m)
Door D2 (0.90 x 2.40m)
Windows (1.20 x 1.60m)
Ventilator (0.90x0.45m)
Ventilator (0.60x0.45m)
Fixing Charges of Steel doors, windows and ventilators Door D (0.90x 2.40m) Door D1 (0.75 x 1.50m) Door D2 (0.75 x 2.40m)
Windows (1.20 x 1.60m) Ventilator (0.90x0.45m)
Supply and fixing of Cuddappa Slab 20/30mm Thick including cost and Conveyance of all site etc. Complete. Shelf at store cubboard Hall & Kitchen Gas platform Gas platform
Provision for Electrification arrangements a) Light & Fan Point SD.no.23
b) Supply&Fixing of Tube Light SD.no.88
c)CFL SD.no.80
d)BHF with CFL SD.no.83
e)Supply & Fixing of Fan SD.no.110
f)Plug Point SD.no.36
g)S & Fixing DP Main switch SD.no.142
h)Service pipe SD.no.73
i)Service Connection SD.no.68
J)Service Charge to EB
Provision of Water Supply arangment 1000 Ltr Tank
25mm PVC Pipe
25mm PVC Elbow
25mm PVC Tee
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc., Outer
Provision for RWHS including pipes & specials etc., all complete
Provision of wash basin
Provision of EWC,
Provision of Baby IWC
Provision towards Drawings
Provsion for Name Board.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.85 MB
TT.pdf
Tender Documents • 0.73 MB
PP.pdf
Additional Documents • 0.56 MB
BOQ_780926.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .