| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10 LAccepted-AOC NO 1 1 ANNA STREET ETHIRAJ NAGAR WEST MAMBALAM METTUPALAYAM CHENNAI 600 033 | CHENNAI | TAMIL NADU | 600033 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.3 L+₹2,145 (0.26%)Rejected-AOC COIMBATORE | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | S RAJATHI L2 | SRK CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for CC Flooring in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 101 | Cum | 220 ₹22,220 Lowest | 220 ₹22,220 Lowest |
| 2.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 101 | Cum | 105 ₹10,605 | 100 ₹10,100 Lowest |
| 3.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 37 | Cum | 5,970 ₹2,20,890 | 5,960 ₹2,20,520 Lowest |
| 4.00 | Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights. | 51 | Sqm | 540 ₹27,540 | 530 ₹27,030 Lowest |
| 5.00 | Plain cement concrete 1:2:4 mix (One part of cement, two parts of sand and four aggregates) using 20mm gauge hard stones complying with standard specification. | 76 | Cum | 7,270 ₹5,52,520 | 7,260 ₹5,51,760 Lowest |
| 6.00Add :- GST @ 18% | |||||
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
23 Dec 2025, 3:00 pmClosed
Assistant Commissioner, South Zone
South Zone, Coimbatore Corporation, Kuniyamuthur, Coimbatore 641008
Restoration of damaged cement concrete flooring due to UGSS and water supply pipeline works at Uthami nagar 1st and 2nd cut roads in Ward No 96, South Zone
2025_MAWS_631719_42
E8 / South Zone / 2025
Open Tender
Civil Works
Works
120 days
South Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹10,000
15 Feb 2026
15 Dec 2025
24 Dec 2025
16 Dec 2025
23 Dec 2025
16 Dec 2025
Earth work excavation for CC Flooring in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete
Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete.
Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Supplying and erecting centering for sides and soffits including supports and strutting for plain surfaces such as reinforced cement concrete slabs, walls etc., with all cross bracing etc., including decentering after curing period,complete complying with standard specifications, at all leads inside the building, at all heights.
Plain cement concrete 1:2:4 mix (One part of cement, two parts of sand and four aggregates) using 20mm gauge hard stones complying with standard specification.
Add :- GST @ 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
tenderdocument.pdf
Tender Documents • 0.55 MB
BOQ_756591.xls
BOQ • 0.31 MB
ITB.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .