Loading…
Loading…
Tender Value
₹18.3 L
EMD Value
₹36,643
Closing Date
3 Oct 2026, 6:00 pmClosed
Executive Officer
D H Road Kurseong Municipality
Construction of Footpath from Nima Sherpas house to Hill Cart Road near the house of Sri Manoj Chettri Ward No 7 under Kurseong Municipality
2026_MAD_5023014_1
004/Kurseong/2026-27
Open Tender
CIVIL WORKS
Percentage
30 days
Kurseong Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹36,643
Administrator Chamber Kurseong Municipality
14 Oct 2026
9 Sept 2026
5 Oct 2026
10 Sept 2026
3 Oct 2026
10 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A | |||||
| 1.01 | Earthwork in excavation by mechanical means(Hydrulic excavator/Manual means in foundation trenches or drains(not exceeding1.5m in width or 10sqmtr on plan) including dressing sides and ramming of bottoms, for all lift, including getting out excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 mtr. | 87.75 | Cum | 260.3 | ₹22,841.33 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:
1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 146.25 | Cum | 7,878.5 | ₹11,52,230.63 |
| 1.03 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 162.5 | Sqm | 392.15 | ₹63,724.37 |
| 1.04 | GST Correction Factor @ 0.973 on Subtotal of Part A | 1 | Each | - | - |
| 1.05 | Add Cost Index @ 37% on Corected Subtotal of Part A | 1 | Each | - | - |
| 2PART B | |||||
| 2.01 | Supplying and laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 630 | Sqm | 243.21 | ₹1,53,222.3 |
| 3 | Add GST @ 18% on Subtotal of Part B | 1 | each | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 2.71 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 31.62 MB
BOQ_5105848.xls
BOQ • 0.27 MB
corrigendum.pdf
PDF • 1.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .