Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹3.4 Cr
EMD Value
₹6.9 L
Closing Date
20 Aug 2024, 5:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Facilities Management Division, Bangalore
HINDUSTAN AERONAUTICS LIMITED Facilities Management Division, Bangalore
Construction of New RCC Retaining Wall for Flow of Rain Water in order to Prevent Flooding of Area near Stores at Overhaul Division, HAL BC.
8844
TENDER NOTICE/NCP/18/24-25
Works
Contract Section Civil-FMD-Bangalore
₹0
₹6.9 L
20 Aug 2024
24 Jul 2024
24 Jul 2024
20 Aug 2024
HINDUSTAN AERONAUTICS LIMITED BANGALORE FACILITIES MANAGEMENT DIVISION
NAME OF THE WORK: Construction of New RCC Retaining Wall for Flow of Rain Water in order to Prevent Flooding of Area near Stores at Overhaul Division, HAL [BC]. CONTRACT NO. HAL/FMD/C-35/24-25
Name of the Contractor : x
Sl. No. Specification Quantity Unit Rate in Figs [Excluding GST] Rate in Words Amount
Preamble: (1) The subject work has been called on works contract basis and prevailing GST for same is 18%. Any change in GST +/- during the currency of contract shall be on HAL account. The Tenderer shall abide by prevailing GST act. (2) L1 (lowest quote) will be determined based on the total quoted amount including GST. (3) This BOQ specification has to be read in conjunction with detailed technical specification and tender drawings if any.
Section - 1 Removal / Carriage
1 Removal of excess earth outside the Overhaul Division premises upto lead of 10km From Bund and Berm, etc., all complete as directed by Engineer-in-Charge. 5035.00 Cu m 406.52 Rupees Four Hundred Six and Fifty One Paise Only 2046812.84
Section - 2 Earth Work Excavation
2 Earth work by mechanical/ manual means in rough excavation, banking in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and in all lifts, etc., all complete as directed by Engineer-in-Charge. 3975.00 Cu m 345.25 Rupees Three Hundred Forty Five and Twenty Five Paise Only 1372385.59
3 Earth work in Excavation by Mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.50m in width as well as 10Sq m on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lifts, etc., all complete as directed by Engineer-in-Charge. 3711.00 Cu m 163.08 Rupees One Hundred Sixty Three and Seven Paise Only 605176.04
4 Filling available excavated earth (excluding rock) in trenches, plinth, retianing walls sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead upto 50m as per site requirement, etc., all complete as directed by Engineer-in-Charge. 1590.00 Cu m 180.07 Rupees One Hundred Eighty and Six Paise Only 286307.80
Section - 4 Concrete Works
5 Providing and laying in position cement concrete 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40mm nominal size derived from natural sources)/M 10 concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth, etc., all complete as directed by Engineer-in-Charge. 318.00 Cu m 6595.32 Rupees Six Thousand Five Hundred Ninety Five and Thirty Two Paise Only 2097312.41
6 Extra for laying in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush, etc., all complete as directed by Engineer-in-Charge. 258.00 Cu m 1110.45 Rupees One Thousand One Hundred Ten and Forty Four Paise Only 286495.88
7 Extra for laying the concrete in or under foul conditions like flowing water, etc., all complete as directed by Engineer-in-Charge. 258.00 Cu m 429.55 Rupees Four Hundred Twenty Nine and Fifty Five Paise Only 110824.12
Section - 5 RCC Works
8 Centering and Shuttering including strutting, propping etc., and removal of the form work for foundations, footings, bases of columns, etc., for mass concrete, etc., all complete as directed by Engineer-in-Charge. 563.13 Sq m 360.28 Rupees Three Hundred Sixty and Twenty Seven Paise Only 202884.29
9 Centering and Shuttering including strutting, propping etc., and removal of the form work for walls (any thickness) including attached pilasters, butteresses, plinth and string courses 1892.00 Sq m 774.03 Rupees Seven Hundred Seventy Four and Two Paise Only 1464456.10
10 Proiding Steel reinforcement TMT bars of Fe 500 grade for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level including handling hooks, etc., all complete as directed by Engineer-in-Charge. 62606.50 Kgs 99.08 Rupees Ninety Nine and Eight Paise Only 6203349.14
11 Providing and laying in position Ready mixed M25 grade with minimum of 330 kg/cum or site batched design mixcement concrete for reinforced cement concrete work; using coarseaggregate and fine aggregate derived from natural sources, PortlandPozzolana / Ordinary Portland /Portland Slag cement, admixtures inrecommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-Charge; for the following grades of concrete. Note:- The supply and laying of RCC work is in or under water and /or liquid mud, including cost of pumping or bailing out water and removing the slush etc., complete and working in foul condition. 537.00 Cu m 10171.34 Rupees Ten Thousand One Hundred Seventy One and Thirty Three Paise Only 5462009.03
12 Providing and laying in position Ready mixed M25 grade with minimum of 330 kg/cum or site batched design mixcement concrete for reinforced cement concrete work; using coarseaggregate and fine aggregate derived from natural sources, PortlandPozzolana / Ordinary Portland /Portland Slag cement, admixtures inrecommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-Charge. 297.00 Cu m 8732.29 Rupees Eight Thousand Seven Hundred Thirty Two and Twenty Eight Paise Only 2593489.58
Section - 7 Pointing for Stone Works
13 Flush/ Ruled pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) ,curing,smooth finish, etc., all complete as directed by Engineer-in-Charge. 1070.00 Sq m 354.08 Rupees Three Hundred Fifty Four and Seven Paise Only 378861.61
Section - 15 Dismantling and Demolition
14 Demolishing R.C.C work / Cement Concrete manually/ by mechanical means including stacking of steel bars and disposal of unservicesable material within 50metres lead, etc., all complete as directed by Engineer-in-Charge. 206.70 Cu m 2749.53 Rupees Two Thousand Seven Hundred Forty Nine and Fifty Two Paise Only 568326.91
15 Demolishing stone rubble masonry built in cement Mortar, manually/ by mechanical means, including stacking of serviceable material and disposal of unserviceable material within 50metres lead, etc., all complete as directed by Engineer-in-Charge. 556.50 Cu m 2259.11 Rupees Two Thousand Two Hundred Fifty Nine and Eleven Paise Only 1257194.81
Section - 16 Road Works
16 Drystone pitching 22.50cm thick including supply of stones and preparation surfaces including dressing stones to proper shape and size, backfilling the surfaces with necessary material like aggregate/morrum including preparation of surfaces, etc., all complete as directed by Engineer-in-Charge. 1070.00 Sq m 765.44 Rupees Seven Hundred Sixty Five and Forty Four Paise Only 819021.53
17 Construction of granular sub-base by providing close graded material conforming to Grade-I (size range 75mm to 0.075mm) having CBR Value-30 mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. 184.50 Cu m 2557.74 Rupees Two Thousand Five Hundred Fifty Seven and Seventy Three Paise Only 471902.53
Section - 26 New Technologies and Materials
18 Supplying, fixing and poistioning of 100mm dia unplasticized PVC medium well screen (RMS) pipe with ribs with ribs, confirming to IS: 12818 in pieces at specified loaction for weepholes as per drawing/directions of EIC for venting out the water pressure, etc., all complete as directed by Engineer-in-Charge. 596.25 R m 617.66 Rupees Six Hundred Seventeen and Sixty Six Paise Only 368280.38
19 Shotcreting over surfcaes with 75mm thick etc. in layers with approved design mix concrete having the specified minimum characteristic compressive strength [with ordinary portland cement, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria] including the cost of centering and shuttering at edges and corners, etc., all complete as directed by Engineer-in-Charge. Note: Rates shall include the providing necessary ground wires etc. Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding/ tapping with a blunt metal instrument. 1656.25 Sq m 1496.47 Rupees One Thousand Four Hundred Ninety Six and Forty Seven Paise Only 2478536.02
Sub Total Rupees Two Crore Ninety Lakh Seventy Three Thousand Six Hundred Twenty Six and Fifty Eight Paise Only 29073626.59
The Tenderer has to Quote Percentage Above / Below as Specified and Percentage Shall be Quoted in Figures. Approximate Amount Put to Tender State Above or Below Percentage in Figures [Excluding GST] Amount
Tenderer's Quote (Excluding GST) 29073626.59 BELOW % 29073626.59
Add 18% GST Rupees Fifty Two Lakh Thirty Three Thousand Two Hundred Fifty Two and Seventy Eight Paise Only 5233252.79
Grand Total (Including GST) Rupees Three Crore Forty Three Lakh Six Thousand Eight Hundred Seventy Nine and Thirty Seven Paise Only 34306879.37
Note: The tenderer has to quote percentage above / below against the total amount considering the specified standard rates. If the contractor does not quote any percentage above / below on the total amount, the tender shall be treated as invalid and will not be considered.
WARNING: PLEASE ENTER PERCENTAGE QUOTE
HINDUSTAN AERONAUTICS LIMITED
Facilities Management Division
Pre-Qulification Profile (To Be uploaded along with Part A)
Tender Ref No. or Contract No.: HAL/FMD/C-35/24-25
Name of Work: Construction of New RCC Retaining Wall for Flow of Rain Water in order to Prevent Flooding of Area near Stores at Overhaul Division, HAL [BC].
Estimated Amount in lakhs.: 34310000
Tender Notice Date:(DD/MM/YYYY) 17.07.2024 Can we give in DD/MM/YYYY
Complition Period(In months) 6
PROVISIONAL GST ID NO. for HAL 29AAACH3641R1Z3 Kindly mention at Col I J &K as " Any Other related Information"
Sl.No Description Details Enclosed / Not Enclosed Any Other Related Information Remarks
1 Name of the Individual / Firm / Company: * Mandatory Pls enter name
2 Type of ownership Related Document to be Uploaded to eProcurement Portal
3 Year of Estblishment of Company/Business
4 If Other, please specify
5 Details of Constitution or Legal Status such as certificate of incorporation, shops and establishments, etc., If not enclosed reasons be to recorded here
6 Address for correspondence:
8 PAN no and Name of Holder
9 PF number (If any)
11 (a) Service Tax Registration No
11 (b) Goods and Service Tax ID No.
12 Contact details
Contact person name Pls
Ph. No. with STD code
FAX No. with STD code 5 6
13 Registered Contractor
If Registered Contractor with HAL Yes/ No Pls Enter Related Document to be Uploaded to eProcurement Portal * Category: A = Above 25 Crores B = 15Crore to 25 Crores C = 5Crore to 15 Crores D = 1 Crore to 5 Crores E = Lessthan 100 Lakhs to 75 Lakhs F = 75 Lakhs to 50 Lakhs 0 7 .A1 1
Name of Organisation 199999 7 A 2
Category and Registration No. 200000 6 B 3
PEMD Amount ( If paid ) 499999 6 C 4
not required Need to Fill Column 19 no comparision 500000 5 D 5
14 I.T Returns for past 03 years 999999 5 E 6
2023-24 Pls Select 'Yes','No' for IT Returns for all the 3 years 2499999 4
15 Maximum value of works excuted during the followinf 5 years. . (In Lakhs)
2018 - 2019 Pls enter Finiancial Turnover in Rupees for all the years NOTE: The value of max work to be supported with the details of Works executed for each year including name of the organisation with period of execution. Here last 3 years cells to be considered to Check Annual Turn Over for 30 % value of Estimation given above 1 6.00 7.00 0 0
Avg Annual Turnover criteria is not met
16 DETAIL OF WORK ON HAND UPTO N-Months (N-contract period) [For Bid capacity calculation] NOTE : PROVISION for 10 works are given. If more, a separate similar sheet to be made showing all the works with all details as per this FORMAT and same to Uploaded. However, 9 works details to be provided and balance work value of other works to be added and to be provided in 10th row as OTHER works.
Sl.No(work No) Name of Organization with address Name of the work on hand Amount of Contract Rs (in Lakhs) Period of CONTRACT in months Date of Commencement of work as Work Order in dd/mm/yyyy Probable date of Completion as Agreed Actual progress achieved till date of Tender Notification Rs (in Lakhs) Balance value of work on hand [Col.(3)-Col.(7)] Rs (in Lakhs) Remarks If Any 0.00
8 0.00 Max Turn Over 07-08 8500000
9 0.00 Current Level to be brought by adding 10% for every year 10-11 8500000 X 1.1 X 1.1 X 1.1
10 0.00 Turn Over to considered A 11313500
0.00 Balance Work On Hand 207452000
Bid Capacity 0.00 Bid Capacity Criteria is not Met this shouldf be hidden while uploading
17 Work Schedule for completion of works with in stipulated time [Please enclose action plan / bar chart as to indicate the completion of work, within the scheduled time (contract period)] Bid Capacity (2 X A X N) - B
Related Document to be Uploaded -162198000
18 Quantity of work Excuted during the last three years
Earthwork [in Cum]
Concrete work [in Cum]
Reinforcement steel [in MT]
Any other quantity of items tenderer would like to mention
19 Bank(s) details: [Copy of the cheque leaf to be uploaded]
19a Bank Account No. Related Document to be Uploaded to eProcurement Portal (Note Canceled cheque leaf to be uploaded)
Name of the Bank
Type of Account
19b Bank Statement for past three month
19c Latest Over draft Facilties with Bank enter Name of Bank, Date of Issue and Value of Over Draft
20 Latest Bankers Solvency Certificate from Nationalized/ scheduled Bank issued NOT before 12 months from the date of Tender Notice. SOLVENCY solvency cal
Name of Bank & Branch Pls Related Document to be Uploaded to eProcurement Portal 17.07.2024 1-Jul 0 40000
Date of Issue(dd-mm-yyyy) #VALUE! 200000 40000
Value Rs. In Lakhs 200001 150000
Solvency value is as per NIT
21 Experience of having successfully completed similar works during last 7 years ending last day of previous month. [Work experience certificates / Completion certificates should be uploaded for verification]. [Latest work experience certificate may be uploaded] (i) THREE similar completed works each costing not less than the amount equal to 40% of the estimated cost. (ii) TWO similar completed works each costing not less than the amount equal to 50% of the estimated cost. (iii) ONE similar completed work each costing not less than the amount equal to 80% of the estimated cost. [Amount put to the Tender] 2000000 500001 250000
Completed similar works during last 7 years You are Not Eligible Pls Select Works Completed during last 7 years 1000000 250000
Work NoI Type of Work [ Incase of private works the same shall be supported with TDS certificate] Related Document to be Uploaded to eProcurement Portal 1000001 500000
Name of The organisation
Brief Description of Work: 2000000 500000
Completed value of Work in Rs. Lakh: 2000001 1000000
Date of Commencement of Work [DD/MM/YYYY]: 4000000 1000000
Date of Actual Completion of Work[DD/MM/YYYY]: 4000001 2000000
Work No II Type of Work [ Incase of private works the same shall be supported with TDS certificate] Related Document to be Uploaded to eProcurement Portal 10000000 2000000
Name of The organisation
Brief Description of Work
Completed value of Work in Rs. Lakh:
Date of Commencement of Work [DD/MM/YYYY]:
Date of Actual Completion of Work[DD/MM/YYYY]: work done
Work No III Type of Work and Organisation name [ Incase of private works the same shall be supported with TDS certificate] Related Document to be Uploaded to eProcurement Portal 17.07.2024 2555
Name of The organisation
Brief Description of Work: #VALUE!
Completed value of Work in Rs. Lakh:
Date of Commencement of Work [DD/MM/YYYY]:
Date of Actual Completion of Work[DD/MM/YYYY]:
Work Competion is NOT with in 7 years
Valid Class I Electrical Licence [or] Undertaking for engaging Electrical Contractor possessing valid Class I Electrical Licence Please Enter Electricial Licence No Electricial Licence valid upto Related Document to be Uploaded to eProcurement Portal
22 DEAILS OF TECHNICAL PERSONNEL AVAILABLE( if space provided is insufficant separate sheet to be uploaded with the same format as below)
Sl.No Name of members or technical personllel avalable in the organization Qualification of similar nature number of years of experience
23 DETAILS OF MACHINERY AVAILABLE
Sl.No Name of Mechinery No Make Year of Manufacture
1 Concrete Mixers - Type etc
2 Vibrators - Diesel - Electrical
3 Weiding equipment's
4 a) Rectifiers
5 b) Welding Generators
6 Erection equipment's
10 Water Lifting motor pumps
13 Drilling Equipment's
16 Stone crushers
17 Bitumen hot mixture plant
18 Bitume boiler
20 Batching plants
21 Vibratory rollers
23 Cranes-Details
24 Concrete pumps
26 Rock breakers
27 Transit mixers
29 Weight batches
24 Details of person holding the power of Attorney (If different from contact person)
Name Related Document to be Uploaded to eProcurement Portal
Ph. No. with STD code
FAX No. with STD code
I/We declare and confirm that - 1. All information and attachments submitted in this application are true and correct. 2. I/We are aware that any false information provided herein will result in the rejection of my application and suspension of any registrations granted. 3. I/We shall not make refund claims of expenditure incurred in processing this application. Pls enter
26 Tender Document Cost and EMD details
Descipttion Enclosed / Not enclosed Valid upto [in case of BG] Related Document to be Uploaded to eProcurement Portal
Tender cost Enclosed
27 Average annual financial turn over during the last 3 years, ending 31st March 2023 [ should not be less than 30% of amount put to tender] and details for last 5 years to be provided to assess the bid capacity. The values provided to be supported by uploading Balance Sheet along with Profit & loss account statement. . (In Lakhs)
2022-23 Pls Select 'Yes','No' for Annual financial turn over for all the 3 years
Average 0.00 FALSE
Balance sheet and Profit & loss statement for last 05 years
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
raw.json
RAW_JSON
TN18.pdf
TENDER_DOCUMENT • 2.38 MB
35PQ.pdf
TENDER_DOCUMENT • 0.20 MB
35Checklist.pdf
TENDER_DOCUMENT • 0.17 MB
35PBF.xlsm
TENDER_DOCUMENT • 0.04 MB
35TB.pdf
TENDER_DOCUMENT • 2.58 MB
35PB.pdf
TENDER_DOCUMENT • 0.30 MB
35Tenderdrawing.pdf
TENDER_DOCUMENT • 0.18 MB
35PQF.xlsm
TENDER_DOCUMENT • 0.04 MB
35ECSForm.pdf
TENDER_DOCUMENT • 0.46 MB
35Undertaking.pdf
TENDER_DOCUMENT • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .