| 1 | L1₹2.0 CrAccepted-AOC NO 5 37 VITTAMPALAYAM EMAPALLI TIRUCHENGODE TALUK NAMAKKAL DISTRICT 637211 | EMAPALLI | NAMAKKAL | TAMIL NADU | 637211 | ₹2.0 Cr | L1 | Accepted-AOC ACCEPTED AS L1 CONTRACTOR |
| 2 | L2₹2.1 CrRejected-AOC | ₹2.1 Cr | L2 | Rejected-AOC REJECTED SINCE RATE QUOTED ARE HIGHER THAN L1 |
| Sl No | Description | Qty | Unit | V.RAJENDRAN L2 | RKK CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Walls in BRICK masonry in Cement mortar walls under 3m height as directed by the Departmental officers Complying with standard specification. | 43 | Cu.m. | 343 ₹14,749 | 333 ₹14,319 |
| 2.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Walls in SOILD BLOCK masonry in Cement mortar walls under 3m height as directed by the Departmental officers Complying with standard specification. | 95.3 | Cu.m. | 343 ₹32,687.90 | 333 ₹31,734.90 |
| 3.00 | Dismantling of Aerocon panel 50mm thick with hardware joinning compound etc., the rate is inclusive of erection and transportation charges etc., complete | 565.5 | Sq.m | 1,198 ₹6.8 L | 1,155 ₹6.5 L |
| 4.00Construction of Solid Blocks Wall of size 300mmx 230mmx200mm using best quality solid blocks in Cement Mortar 1:3 [One Cement and Three Crushed Stone Sand] using hoop iron reinforcement if found necessary, including curing etc. complete and as directed by the departmental officers.(Hoop iron reinforcement will be measured and paid for separately). | |||||
| 4.01 | For Superstructure in Ground Floor | 45 | Sq.m | 16,526 ₹7.4 L | 15,895 ₹7.2 L |
| 4.02 | For Superstructure in First Floor | 73 | Sq.m | 16,708 ₹12.2 L | 16,080 ₹11.7 L |
| 5.00 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 676 | Sq.m | 328 ₹2.2 L | 320 ₹2.2 L |
| 6.00 | Hire charges for Closing the glazed doors and windows in Strong room using 12 mm plywood sheet and strengthening the same with countrywood reeper 2"x1". The entire cost should be borne by the contractor himself and the work should be completed. After the counting is over the same same protection should be removed as directed by the departmental officers. (Hire charges for 14 days) | 832 | Sq.m | 1,331 ₹11.1 L | 1,290 ₹10.7 L |
| 7.00 | Hire charges for Providing weldmesh partition using 7.50cm x 2.50 cm weldmesh (10 gauge) with silver oak scantling of required length and size of vertical and horizontal supports and cross supports using countrywood reeper of size 2" x 1" etc., complete as directed by the departmental officers. (Hire charges for 14 days) | 3,256.4 | Sq.m | 1,886 ₹61.4 L | 1,818 ₹59.2 L |
| 8.00 | Supplying and fixing of Aerocon panel 50mm thick with hardware joinning compound etc., the rate is inclusive of erection and transportation charges etc., complete | 852 | Sq.m | 3,123 ₹26.6 L | 3,006 ₹25.6 L |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
7 Apr 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
O/o THE SUPERINTENDING ENGINEER PWD BUILDINGS CONSTRUCTION AND MAINTENANCE CIRCLE COIMBATORE
PROVIDING STRONG ROOM, ADDl STRONG ROOM, COUNTING HALL AND WELD MESH PARTITION, AEROCON PARTITION, HIPPED ROOF RAIN PROOF G.I SHEET PANDAL AND BARRICADING ARRANG FOR COUNTING CENTRES FOR 10LEGISLATIVE ASSEMBLY CONSTITUENCIES IN GCT COLLEGE CAMPUS CBE
2026_PWD_675279_1
89BCMCBE24032026(1)
Open Tender
Civil Works
GOVERNMENT COLLEGE OF TECHNOLOGY IN COIMBATORE
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.1 L
11 Apr 2026
31 Mar 2026
7 Apr 2026
31 Mar 2026
7 Apr 2026
31 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Walls in BRICK masonry in Cement mortar walls under 3m height as directed by the Departmental officers Complying with standard specification. | ||||||
| 2Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Walls in SOILD BLOCK masonry in Cement mortar walls under 3m height as directed by the Departmental officers Complying with standard specification. | ||||||
| 3Dismantling of Aerocon panel 50mm thick with hardware joinning compound etc., the rate is inclusive of erection and transportation charges etc., complete | ||||||
| 4Construction of Solid Blocks Wall of size 300mmx 230mmx200mm using best quality solid blocks in Cement Mortar 1:3 [One Cement and Three Crushed Stone Sand] using hoop iron reinforcement if found necessary, including curing etc. complete and as directed by the departmental officers.(Hoop iron reinforcement will be measured and paid for separately). | ||||||
| 4.01 | For Superstructure in Ground Floor | - | Sq.m | - | - | item code 005 |
| 4.02 | For Superstructure in First Floor | - | Sq.m | - | - | item code 006 |
| 5Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | ||||||
| 6Hire charges for Closing the glazed doors and windows in Strong room using 12 mm plywood sheet and strengthening the same with countrywood reeper 2"x1". The entire cost should be borne by the contractor himself and the work should be completed. After the counting is over the same same protection should be removed as directed by the departmental officers. (Hire charges for 14 days) | ||||||
| 7Hire charges for Providing weldmesh partition using 7.50cm x 2.50 cm weldmesh (10 gauge) with silver oak scantling of required length and size of vertical and horizontal supports and cross supports using countrywood reeper of size 2" x 1" etc., complete as directed by the departmental officers. (Hire charges for 14 days) | ||||||
| 8Supplying and fixing of Aerocon panel 50mm thick with hardware joinning compound etc., the rate is inclusive of erection and transportation charges etc., complete | ||||||
stage.html
html • 0.04 MB
techsummary_811627.pdf
finsummary_811627.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
GenConditionCBEELE.pdf
Tender Documents • 0.66 MB
BOQ_811627.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid