| 1 | L1₹9.4 LAccepted-AOC | ₹9.4 L | L1 | Accepted-AOC LER |
| 2 | L2₹9.4 LRejected-Finance | ₹9.4 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | RAJ CONSTRUCTIONS L2 | SDS CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Name of Work:Providing Paver Block Near VPSC in Anna Nagar at Devanampattu Panchayat under G.Fund 25-26 | |||||
| 1.01 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 9.9 | Cu.m | 132 ₹1,306.80 | 131.5 ₹1,301.85 |
| 1.02 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, conso | 9.9 | Cu.m | 5,599 ₹55,430.10 | 5,599 ₹55,430.10 |
| 1.03 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened | 198 | Sq.m | 365 ₹72,270 | 365 ₹72,270 |
| 1.04 | Plain Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 19.8 | Cu.m | 6,990 ₹1.4 L | 6,989 ₹1.4 L |
| 1.05 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | 59.81 | Cu.m | 2,566 ₹1.5 L | 2,566 ₹1.5 L |
| 1.06 | Providing interlocking blocks of approved shape, thickness and size | 478.5 | Sq.m | 778 ₹3.7 L | 777.1 ₹3.7 L |
| 1.07 | Provision for name board charges | 1 | No's | 1,000 ₹1,000 | 1,000 ₹1,000 |
| 1.08 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,42,948 ₹1.4 L | 1,42,866 ₹1.4 L |
Tender Value
₹9.5 L
EMD Value
₹9,500
Closing Date
17 Feb 2026, 3:00 pmClosed
Block Development Officer(B.Pt) Thurinjapuram
Block Development Office(B.Pt) Thurinjapuram
Providing Paver Block Near VPSC in Anna Nagar at Devanampattu Panchayat
2026_RDTN_655364_1
AS No A5/3603944/2025 Dt 25.11.2025
Open Tender
Civil Works
Block Development Office(B.Pt) Thurinjapuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,500
Yes
6 Apr 2026
11 Feb 2026
17 Feb 2026
11 Feb 2026
17 Feb 2026
11 Feb 2026
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, conso
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened
Plain Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing interlocking blocks of approved shape, thickness and size
Provision for name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
01GfundnearVPSCPaver.pdf
Tender Documents • 0.53 MB
BOQ_785792.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid