Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC 213 SRI KRISHNA NAGAR BRAHMRSI CHOWK AURANGABAD SRI KRISHNA NAGAR AURANGABAD BIHAR 824101 | AURANGABAD | BIHAR | 824101 | L1 | Accepted-AOC Techno commercially accepted L-1 bidder | |
| 2 | Rejected-Technical WARD NO 13 LAHSUI CAMP KOTMA DIST ANUPPUR 484334 M P | KOTMA | ANUPPUR | MADHYA PRADESH | 484334 | - | Rejected-Technical L-3 bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical L-4 bidder | |
| 4 | Rejected-Technical AMLAI COLLIERY DHANPURI DISTT ANUPPUR M P | DHANPURI | ANUPPUR | MADHYA PRADESH | 484116 | - | Rejected-Technical L-2 bidder |
Tender Value
₹9.0 L
EMD Value
₹11,200
Closing Date
23 Sept 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO(EnM), JK Area
SO(EnM) Office, JK Area
Shifting of different mechanical and electrical equipments from P-2 depillaring panel LKII seam to new development panel in MK seam in Bhadra 7/8 mine, Bhadra Sub Area, Jamuna Kotma Area
2023_SECL_288560_1
SECL/JK/SO(EnM)/eT/23-24/14
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Bhadra 7-8 mine, Jamuna Kotma Area
As per NIT
3 documents required · 3 mandatory
₹11,200
21 Oct 2023
12 Sept 2023
25 Sept 2023
12 Sept 2023
23 Sept 2023
13 Sept 2023
12 Sept 2023 - 19 Sept 2023
Amount
Loading, Transportation and Unloading of Main switches(05), Starters(07), HT Switches(02), Gate End boxes(05), Drill panels(05), Auxiliary fan with motor(01), Hydraulic power pack with cable & hoses(01), Gearboxes(03), Motors(03), Tail end drums(03), Drive drum frame(03), Tail end frame(03) and Drive head base(01) from from LKII seam to 1LW/16xcut, MK seam [Manual(Trackline)-530m, Haulage-440m] in Coal tubs/trolleys.
Loading, Transportation and Unloading of Main switches(05), Starters(07), HT Switches(02), Gate End boxes(05), Drill panels(05), Auxiliary fan with motor(01), Hydraulic power pack with cable & hoses(01), Gearboxes(03), Motors(03), Tail end drums(03), Drive drum frame(03), Tail end frame(03) and Drive head base(01) from from LKII seam to 1LW/16xcut, MK seam. [Manual(Trackline)-530m, Haulage-440m] in Coal tubs/trolleys.
Manual Pulling of Main switches(05), Starters(07), HT switches(02), Gate End boxes(05), Drill panels(05), Auxiliary fan with motor(01), Hydraulic power pack with cable & hoses(01), Gearboxes(03), Motors(03), Tail end drums(03), Drive drum frame(03), Tail end frame(03) and Drive head base(01) before loading in coal tub/trolley (30m lead) LKII seam.
Manual Pulling of Gate End boxes(05), Drill panels(05), Auxiliary fan with motor(01), Hydraulic power pack with cable & hoses(01), Gearboxes(03), Motors(03) after unloading from coal tub/trolley in panel MK seam (30m lead)
Loading, Transportation and Unloading of Flexible cable-600m, Power cable 1000m, Lighting cable and Signalling cable from LKII seam to 1LW/16xcut, MK seam [Manual(Trackline)-530m, Haulage-440m] in Coal tubs/trolleys.
Loading, Transportation and Unloading of Flexible cable-600m, Power cable 1000m, Lighting cable and Signalling cable from LKII seam to 1LW/16xcut, MK seam [Manual(Trackline)-530m, Haulage-440m] in Coal tubs/trolleys.
Loading, Transportation and Unloading of Transformers (03) from LKIl seam to 1LW/16xcut, MK seam [Manual(Trackline) 530m, Haulage-440m] in Coal tubs/trolleys.
Loading, Transportation and Unloading of Transformers (03) from LKIl seam to 1LW/16xcut, MK seam [Manual(Trackline) 530m, Haulage-440m] in Coal tubs/trolleys.
Laying of Power cable in MK seam-1000m
Laying of Power cable in MK seam-1000m
Positioning of 9 switches within 400 metres of new development panel MK seam
Positioning of 9 switches within 400 metres of new development panel MK seam
Shifting/Marching of 03 nos LHD and 01 no. UDM from LKII seam to Surface for repairing works for proper working in MK seam development panel. (Shifting/Marching of 01 no LHD/UDM machine for every 400m is taken as 1 shifting will require 12 Manshift)
Shifting/Marching of 03 nos LHD and 01 no. UDM from LKII seam to Surface for repairing works for proper working in MK seam development panel. (Shifting/Marching of 01 no LHD/UDM machine for every 400m is taken as 1 shifting will require 12 Manshift)
Shifting/Marching of 01 no. UDM from LKII seam to MK seam development panel. (Shifting/Marching of 01 no LHD/UDM machine for every 400m is taken as 1 shifting will require 12 Manshift)
Shifting/Marching of 01 no. UDM from LKII seam to MK seam development panel. (Shifting/Marching of 01 no LHD/UDM machine for every 400m is taken as 1 shifting will require 12 Manshift)
Marching of 03 nos of LHD and 01 no. UDM from surface to new development panel MK seam. (Shifting/Marching of 01 no LHD/UDM machine for every 400m is taken as 1 shifting will regquire 12 Manshift)
Marching of 03 nos of LHD and 01 no. UDM from surface to new development panel MK seam. (Shifting/Marching of 01 no LHD/UDM machine for every 400m is taken as 1 shifting will regquire 12 Manshift)
Total impact of GST for the purpose of CTC
MAHENDRA SINGH
KUTBUDDIN ANSARI
M/S SONU SAH
stage.html
html • 0.04 MB
techsummary_298830.pdf
PDF • 2.70 MB
finsummary_298830.pdf
PDF • 2.70 MB
23-24eLOA14.pdf
PDF • 1.53 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .