Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-Finance | ₹16.6 L | L1 | Accepted-Finance stood as L1 |
| 2 | L1₹16.6 LAccepted-Finance AT WARD NO 21 BALANGIR MUNICIPALITY DIST BALANGIR PIN 767001 | BALANGIR | BALANGIR | ODISHA | 767001 | ₹16.6 L | L1 | Accepted-Finance stood as L1 |
| 3 | L1₹16.6 LAccepted-Finance | ₹16.6 L | L1 | Accepted-Finance stood as L1 |
| 4 | L1₹16.6 LAccepted-Finance | ₹16.6 L | L1 | Accepted-Finance stood as L1 |
| 5 | L1₹16.6 LAccepted-Finance WORD NO 09 BALANGIR MUNICIPALITY P O P S BALANGIR DIST BALANGIR PIN 767001 | BALANGIR | BALANGIR | ODISHA | 767001 | ₹16.6 L | L1 | Accepted-Finance stood as L1 |
Tender Value
₹16.6 L
EMD Value
₹16,645
Closing Date
11 May 2026, 5:30 pmClosed
Superintending Engineer
Office of the SE, LSRRC and B Division, Balangir, Laltikra
Construction of AWC in the RR Colony, Larkipali and Sadeipali of LSP (For E block).
2026_CEEBO_128383_1
LSRRC AND BD-BGR-1/2026-27
Open Tender
Civil Works - Buildings
122 days
Sadeipali
Tender Cost, EMD,PAN,valid RC, valid GSTIN, Affidavit, No relation certificate, undertaking and any other document as per DTCN.
3 documents required · 3 mandatory
₹6,000
₹16,645
Yes
Office of the SE, LSRRC and B Division, Balangir
20 May 2026
27 Apr 2026
12 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
27 Apr 2026 - 6 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation of foundation in hard or gravelly soil, stiff black cotton soil & stoney earth mixedwith boulder with all leads lifts and delifts including dressing, levelling the bed and depositing the excavated materials away from the work site including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 35.22 | Cum | 276.9 | ₹9,752.42 | BI01010001010000000000000515BI0100001113 |
| 2 | Filling foundation and plinth with sand of approved quality,watered and rammed including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 34.13 | cum | 596.7 | ₹20,365.37 | BI01010001010000000000000515BI0100001114 |
| 3 | Back filling of excavated earth in foundation and plinth including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 11.74 | Cum | 184.6 | ₹2,167.2 | BI01010001010000000000000515BI0100001115 |
| 4 | Cement Concrete M15 with 40 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 11.56 | cum | 4,958.8 | ₹57,323.73 | BI01010001010000000000000515BI0100001116 |
| 5 | RCC M20 with HG (CB) 20 mm size aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 30.08 | cum | 5,672.3 | ₹1,70,622.78 | BI01010001010000000000000515BI0100001117 |
| 6 | Fly ash brick (23cm x 11cm x 8 cm ) size having crushing strength not less than 75kg/cm2 with dimensional tolerance ±2% in cement mortar(1:6) in plinth and foundation including cost & conveyance of materials, royalty of materials, T & P required for the work,sundries, labour and labour cess etc complete as per specification and direction of Engineer-in-charge. | 5.21 | cum | 5,472.3 | ₹28,510.68 | BI01010001010000000000000515BI0100001118 |
| 7 | Fly ash brick (23cm x 11cm x 8 cm ) size having crushing strength not less than 75kg/cm2 with dimensional tolerance ±2% in cement mortar(1:6) in super structure including cost & conveyance of materials, royalty of materials, T & P required for the work,sundries, labour and labour cess etc complete as per specification and direction of Engineer-in-charge. (a) Ground Floor | 47.87 | cum | 5,505.6 | ₹2,63,553.07 | BI01010001010000000000000515BI01000011191 |
| 8 | 2.5 cm AS flooring with Cement Concrete (1:2:4) with 12 mm to 20 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including cement punning, rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 18.38 | cum | 397.4 | ₹7,304.21 | BI01010001010000000000000515BI01000011192 |
| 9 | Supply, fitting, fixing, straightening, bending, binding and placing in position of uncoated HYSD bar reinforcement complete including cost & conveyance of all materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 27.48 | qntl | 9,302.8 | ₹2,55,640.94 | BI01010001010000000000000515BI01000011193 |
| 10 | Rigid smooth centering and shuttering for R.C.C works including false works and dismentalling there after casting including cost, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. (a) Foundation & Plinth. | 103.37 | sqm | 248.7 | ₹25,708.12 | BI01010001010000000000000515BI01000011194 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
DTCN.pdf
Tender Documents • 2.21 MB
BOQ_588514.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid