| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC | ₹16.6 L | L1 | Accepted-AOC WON IN THE TRANSPARENT LOTTERY |
| 2 | L1₹16.6 LRejected-AOC | ₹16.6 L | L1 | Rejected-AOC LOSE IN THE TRANSPARENT LOTTERY |
| 3 | L1₹16.6 LRejected-AOC AT WARD NO 21 BALANGIR MUNICIPALITY DIST BALANGIR PIN 767001 | BALANGIR | BALANGIR | ODISHA | 767001 | ₹16.6 L | L1 | Rejected-AOC LOSE IN THE TRANSPARENT LOTTERY |
| 4 | L1₹16.6 LRejected-AOC | ₹16.6 L | L1 | Rejected-AOC LOSE IN THE TRANSPARENT LOTTERY |
| 5 | L1₹16.6 LRejected-AOC | ₹16.6 L | L1 | Rejected-AOC LOSE IN THE TRANSPARENT LOTTERY |
Tender Value
₹16.6 L
EMD Value
₹16,645
Closing Date
11 May 2026, 5:30 pmClosed
Superintending Engineer
Office of the SE, LSRRC and B Division, Balangir, Laltikra
Construction of AWC in the RR Colony, Larkipali and Sadeipali of LSP (For E block).
2026_CEEBO_128383_1
LSRRC AND BD-BGR-1/2026-27
Open Tender
Civil Works - Buildings
Percentage
122 days
Sadeipali
Tender Cost, EMD,PAN,valid RC, valid GSTIN, Affidavit, No relation certificate, undertaking and any other document as per DTCN.
3 documents required · 3 mandatory
₹6,000
₹16,645
Yes
Office of the SE, LSRRC and B Division, Balangir
1 Jul 2026
27 Apr 2026
12 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
27 Apr 2026 - 6 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in hard or gravelly soil, stiff black cotton soil & stoney earth mixedwith boulder with all leads lifts and delifts including dressing, levelling the bed and depositing the excavated materials away from the work site including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 35.22 | Cum | 276.9 | ₹9,752.42 |
| 2 | Filling foundation and plinth with sand of approved quality,watered and rammed including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 34.13 | cum | 596.7 | ₹20,365.37 |
| 3 | Back filling of excavated earth in foundation and plinth including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 11.74 | Cum | 184.6 | ₹2,167.2 |
| 4 | Cement Concrete M15 with 40 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 11.56 | cum | 4,958.8 | ₹57,323.73 |
| 5 | RCC M20 with HG (CB) 20 mm size aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 30.08 | cum | 5,672.3 | ₹1,70,622.78 |
| 6 | Fly ash brick (23cm x 11cm x 8 cm ) size having crushing strength not less than 75kg/cm2 with dimensional tolerance ±2% in cement mortar(1:6) in plinth and foundation including cost & conveyance of materials, royalty of materials, T & P required for the work,sundries, labour and labour cess etc complete as per specification and direction of Engineer-in-charge. | 5.21 | cum | 5,472.3 | ₹28,510.68 |
| 7 | Fly ash brick (23cm x 11cm x 8 cm ) size having crushing strength not less than 75kg/cm2 with dimensional tolerance ±2% in cement mortar(1:6) in super structure including cost & conveyance of materials, royalty of materials, T & P required for the work,sundries, labour and labour cess etc complete as per specification and direction of Engineer-in-charge. (a) Ground Floor | 47.87 | cum | 5,505.6 | ₹2,63,553.07 |
| 8 | 2.5 cm AS flooring with Cement Concrete (1:2:4) with 12 mm to 20 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including cement punning, rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 18.38 | cum | 397.4 | ₹7,304.21 |
| 9 | Supply, fitting, fixing, straightening, bending, binding and placing in position of uncoated HYSD bar reinforcement complete including cost & conveyance of all materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 27.48 | qntl | 9,302.8 | ₹2,55,640.94 |
| 10 | Rigid smooth centering and shuttering for R.C.C works including false works and dismentalling there after casting including cost, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. (a) Foundation & Plinth. | 103.37 | sqm | 248.7 | ₹25,708.12 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
DTCN.pdf
Tender Documents • 2.21 MB
BOQ_588514.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .