Loading…
Loading…
Tender Value
₹81.8 L
EMD Value
₹1.6 L
Closing Date
8 Aug 2025, 11:00 pmClosed
Agriculture Department
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk
AD/2024-25/OW/WORK_INDENT67/CALL-2
AD/2024-25/OW/WORK_INDENT67/CALL-2
Open
Other Works
Two Tender Document System(Two Cover)
Joint Director of Agriculture Office KALABURAGI
₹2,050
₹1.6 L
31 Jul 2025
31 Jul 2025
11 Aug 2025
6 Aug 2025
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk CheckDam Block I
Foundation excavation for construction of RRS/CD/VD/Digging foundation for bund seat of NB/PT with a lead and of 50m and 2.00m a) Up to a depth of 2m in Red/Black Soils
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
Providing and constructing Granite/Trap/Basalt Size stone chisel dresses, reinforced with bond stones at every 2m distance, machinery for super structure with cement mortar 1:4, with OPC cement @106.4...
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Filling up of gaps noticed during execution of Check Dam, RRS, with clay watering and Compacting.
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk CheckDam Block II
Foundation excavation for construction of RRS/CD/VD/Digging foundation for bund seat of NB/PT with a lead and of 50m and 2.00m a) Up to a depth of 2m in Red/Black Soils
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
Providing and constructing Granite/Trap/Basalt Size stone chisel dresses, reinforced with bond stones at every 2m distance, machinery for super structure with cement mortar 1:4, with OPC cement @106.4...
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Filling up of gaps noticed during execution of Check Dam, RRS, with clay watering and Compacting.
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk CheckDam Block III
Foundation excavation for construction of RRS/CD/VD/Digging foundation for bund seat of NB/PT with a lead and of 50m and 2.00m a) Up to a depth of 2m in Red/Black Soils
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
Providing and constructing Granite/Trap/Basalt Size stone chisel dresses, reinforced with bond stones at every 2m distance, machinery for super structure with cement mortar 1:4, with OPC cement @106.4...
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Filling up of gaps noticed during execution of Check Dam, RRS, with clay watering and Compacting.
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk CheckDam Block IV
Foundation excavation for construction of RRS/CD/VD/Digging foundation for bund seat of NB/PT with a lead and of 50m and 2.00m a) Up to a depth of 2m in Red/Black Soils
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
Providing and constructing Granite/Trap/Basalt Size stone chisel dresses, reinforced with bond stones at every 2m distance, machinery for super structure with cement mortar 1:4, with OPC cement @106.4...
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Filling up of gaps noticed during execution of Check Dam, RRS, with clay watering and Compacting.
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk CheckDam Block V
Foundation excavation for construction of RRS/CD/VD/Digging foundation for bund seat of NB/PT with a lead and of 50m and 2.00m a) Up to a depth of 2m in Red/Black Soils
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
Providing and constructing Granite/Trap/Basalt Size stone chisel dresses, reinforced with bond stones at every 2m distance, machinery for super structure with cement mortar 1:4, with OPC cement @106.4...
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Filling up of gaps noticed during execution of Check Dam, RRS, with clay watering and Compacting.
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk CheckDam Block VI
Foundation excavation for construction of RRS/CD/VD/Digging foundation for bund seat of NB/PT with a lead and of 50m and 2.00m a) Up to a depth of 2m in Red/Black Soils
Providing and laying in position plain cement concrete of mix 1:4:8 with OPC cement @ 180Kgs, with 40mm and down size graded granite metal jelly @ 0.85Cum and sand @ 0.57Cum, Machine mixed, concrete l...
a) Providing and constructing Granite/Trap/Basalt Rubble stone machinery in foundation with cement mortar 1:6 with OPC cement @82.5Kgs, with sand @0.35Cum and 1.1Cum rubble stones not less than 0.3m. ...
Providing and constructing Granite/Trap/Basalt Size stone chisel dresses, reinforced with bond stones at every 2m distance, machinery for super structure with cement mortar 1:4, with OPC cement @106.4...
Providing and Laying in position plain cement concrete of mix 1:3:6 with OPC cement @ 220Kgs, with 20mm and down size graded granite metal jelly @ 0.84Cum and sand @ 0.56Cum, Machine mixed, concrete l...
a) Cement Pointing: Pointing walls built in size stone or rubble Granite/Lateritic Stones in 1:3 cement sand mortar, curing and other works complete.
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Stone pitching of Nala Bund, Check Dam, RRS and other structures if the stones are not locally available, to be transported from approved quarry rough stone pitching to a thinkness of 0.45m in Granite...
Filling up of gaps noticed during execution of Check Dam, RRS, with clay watering and Compacting.
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Boulder Checks Block-I
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth)a) Foundation excavation as per design for Boulder Checks/ Rubble Checks & Middle Reach Treatments in Red and Black soils
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block I
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block II
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block III
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block IV
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block V
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block VI
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block VII
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block VIII
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block IX
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block X
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block XI
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block XII
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block XIII
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block XIV
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block XV
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block XVI
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Proposed for Micro Watershed treatment at Sarsamba Village of Aland Taluk Trench Cum Bund Block XVII
Machinery Works Rates for Soil and Water Conservation works when JCB/POKELINER or any other machines which are used for excavation of foundation of Stone masonry structures. 1.1 Red/Red Sandy/Black So...
MACHINERY WORKS (I) Formation & Dressing of Bunds / Bunds around Farm Pond/Gokatte/ Recharge Pond/Sunken pond/Dugout pond ; Spoil bank of Diversion channel/ Bunds on either side of Waterway/Bunds arou...
MACHINERY WORKS (II) Smoothening of the Trench bottom surface on excavation using Machinery
EXCAVATION OF FOUNDATION AS PER DESIGN SPECIFICATION (Up to 1 m depth) a) Foundation excavation for COF/ waste weir.
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
STONE WORKS Use of locally available Boulders/Rubbles for construction of : Boulder / COF waste weir/Channel Weir/ Pipe outlet/Well waste weir/ Boulder check/ Rubble check/ Boulder Flume, Drops, Stone...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .