Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹75.3 LAdmitted-Finance | +5.99% | ₹75.3 L | L1 | Admitted-Finance |
| 2 | L2₹78.5 L+₹3.2 L (4.27%)Admitted-Finance | +10.52% | ₹78.5 L+₹3.2 L (4.27%) | L2 | Admitted-Finance |
Tender Value
₹71.1 L
EMD Value
₹1.4 L
Closing Date
22 Jul 2026, 6:00 pmClosed
Executive Engineer
RSAMB Division TM Jaipur
Remaining Work for Construction of First Floor of Girls Hostel and Other Development Works at College of dairy Science and Technology Jobner, District Jaipur (Risk and Cost)
2026_RSAMB_573601_1
RSAMB/TM/NIT-06/2026-27
Open Tender
Civil Works
Percentage
Jaipur
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
EE RSAMB Division TM Jaipur
₹1.4 L
Yes
24 Jul 2026
7 Jul 2026
24 Jul 2026
7 Jul 2026
22 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-A (Building Work) | - | - | - | - |
| 2 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. M20 grade Nominal Mix / Design Mix | 17.76 | Cum | 5,609 | ₹99,615.84 |
| 3 | Providing M-25 grade concrete by using cement as per codal provision instead of M-20 grade design mix. | 26.46 | Cum | 69 | ₹1,825.74 |
| 4 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 334.89 | Sqm | 340 | ₹1,13,862.6 |
| 5 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Columns, pillars, posts and struts etc. | 450.43 | Sqm. | 375 | ₹1,68,911.25 |
| 6 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. Thermo-mechanically Treated bars (Conforming of relevent IS code) | 751.32 | Kg. | 77 | ₹57,851.64 |
| 7 | Brick work with clay flyash F.P.S. brick (IS 13757- 1993 ) of class designation 75 in superstructure above plinth level upto floor five level in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 10.01 | Cum. | 4,832 | ₹48,368.32 |
| 8 | Half Brick work with mechanised autoclaved flyash lime bricks conforming to IS: 12894 :2002 of class designation 75 in superstructure above plinth level upto floor V level in. Cement mortar 1 : 4 (1 cement : 4 coarse sand) | 305.86 | Sqm. | 564 | ₹1,72,505.04 |
| 9 | Add extra providing and placing in position 2 Nos. ,6mm Ø M.S. bar at every third course of half brick masonry . | 912 | Sqm | 64 | ₹58,368 |
| 10 | Supplying and fixing in walls machine cut and polished stone shelves, tands and in CM 1:3 with machine cut edges :Kota stone 30mm thick. | 32.8 | Sqm. | 609 | ₹19,975.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 2.29 MB
Tendernotice_3.pdf
PDF • 0.34 MB
Tendernotice_4.pdf
PDF • 0.12 MB
Tendernotice_5.pdf
PDF • 0.43 MB
Tendernotice_6.pdf
PDF • 1.45 MB
Tendernotice_7.pdf
PDF • 0.61 MB
BOQ_1020350.xls
BOQ • 0.57 MB
Bid-Doc-Jobner.pdf
Tender Documents • 0.53 MB
Corr.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .