| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.2 LAccepted-Finance MIRZAPUR UTTAR PRADESH UP | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹21.2 L | 1 | Accepted-Finance 1st Lowest Rate |
| 2 | 2₹21.7 LRejected-Finance ADOT JOGIA BARI JADAL PUR MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | ₹21.7 L | 2 | Rejected-Finance Higher Rate |
| 3 | 3₹22.9 LRejected-Finance ME SAHIA GELA MIRZAPUR UTTAR PRADESH INDIA | PILIBHIT | UTTAR PRADESH | 262001 | ₹22.9 L | 3 | Rejected-Finance Higher Rate |
Tender Value
₹25 L
EMD Value
₹2.5 L
Closing Date
8 May 2026, 12:00 pmClosed
EE, PD, PWD, Mirzapur
EE, PD, PWD, Mirzapur
Anganwadi Center
2026_CEMRZ_1144238_1
1584/Nivida/2026-27 Dt. 13-04-2026
Open Tender
Civil Works - Buildings
90 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹950
₹2.5 L
Yes
13 May 2026
2 May 2026
8 May 2026
2 May 2026
8 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Main Building
Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 53.77 | CUM | 190 | ₹10,216.3 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 15 | CUM | 499 | ₹7,485 |
| 3 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors. | 18.28 | CUM | 4,853 | ₹88,712.84 |
| 4 | (4) Anti Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 7.5 liters/sqm (6) Treatment of soil under apron along external perimter 5 liters/sqm. (As per manufacturer's standard dilution) | 113.76 | SQM | 221 | ₹25,140.96 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) R.C.C. work in Plinth Band | 3.23 | CUM | 6,444 | ₹20,814.12 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) . R.C.C. work in Lintel | 18.16 | CUM | 7,732 | ₹1,40,413.12 |
| 7 | M-150 brick work in 1:4 (one cement and six coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work. | 27.43 | CUM | 5,251 | ₹1,44,034.93 |
| 8 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil. | 12.84 | SQM | 104 | ₹1,335.36 |
| 9 | Brickwork in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of brick work as required and also including oneycombed brick work in thickness of wall more than 12cms. (1:4 cement : coarse sand) | 28.04 | CUM | 6,657 | ₹1,86,662.28 |
| 10 | Half brick masonry with (Class M-150 First Class Brick) in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand) | 71.82 | SQM | 801 | ₹57,528.62 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
Tendernotice_2.pdf
PDF • 2.07 MB
BOQ_2137797.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid