Loading…
Loading…
Tender Value
₹1.8 Cr
EMD Value
₹2.4 L
Closing Date
24 Mar 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
BRIDGE
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N crores or V, whichever is lower; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of total contractual payments in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar nature of work for this tender is "Any Civil Engineering Work comprising of Earth work/ blanketing work".
Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. 2 In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of credentials. 3 If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials. 4 In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work. 5 If a bidder has successfully completed a work as subcontractor and the work experience certificate has been issued for such work to the subcontractor by a Govt. Organization or public listed company as defined in Note for Item 10.1 Para 10 of the Tender Form (Second Sheet), the same shall be considered for the purpose of fulfillment of credentials.
19 conditions · 2 needing a document upload
Documents to be uploaded only in the website by the Tenderer Following Annexure duly filled and signed are to be uploaded online only prior to Closing of Tender. Original copy of all the documents to be submitted to office within 7 days whenever demanded by the Railway. Otherwise, Railway reserves rights to Reject/Accept such tender/offer without any reference to the tenderer/ tenderers. Annexure are available at Upload/View Document menu in Home Page of IREPS portal for works tender. Annexure Description 1. Annexure-I(a) Details of the Works Completed by the tenderer during the last seven years to be filled & submitted as per Annexure-I(a). 2. Annexure-I(b) Details of contractual payment received by the Tenderer during the last 3 (three) financial years including the current financial year to be filled & submitted in Annexure-I(b).3 Annexure-II Details of Plants and Machinery with the tenderer to be filled & submitted as per Annexure- II. 4. Annexure-III Details of Personnel and Organization of the Tenderer to be filled & submitted as per Annexure-III. 5. Annexure-IV Details of Works Presently on hand of the Tenderer to be filled & submitted as per Annexure- IV. 6. Annexure-V Details regarding Association of Railway Officer(s) with the tenderer to be filled & submitted as per Annexure- V. 7. Annexure-VI List of the Arbitration Cases of the Tenderer during last five years to be filled & submitted as per Annexure-VI. 8. Annexure-VII List of the Court Cases of the Tenderer during last Five years to be filled & submitted in Annexure- VII. 9. Annexure- VIII NEFT MANDATE FORM. All Payments to the agency (including the refund of the Bid Security of the unsuccessful bidder preferably) will be remitted through NEFT. The Tenderer is required to submit Bank details and A/C No. etc. in Annexure- VIII. 10. Annexure-IX GST COMPLAINT INVOICE: To be filled & submitted as per Annexure-IX. 11. Annexure-V of GCC-2022 FORMAT FOR CERTIFICATE TO BE SUBMITTED / UPLOADED BY TENDERER ALONGWITH THE TENDER DOCUMENTS as per Annexure-V of GCC-2022. 12. Annexure-XI LETTER OF CREDIT: To be filled & submitted as per Annexure-XI. 13. Annexure-VIA BID SECURITY: Bank Guarantee Bond from any scheduled commercial bank of India to be filled & submitted as per Annexure-VIA. 14. Annexure-VIB Annual Contractual Turnover Data for the Previous 3/4 Years (Contractual Payment only) to be filled & submitted as per Annexure-VIA. 15. Submission of Form V & VA properly. 16. Annexure-VI of GCC- 2022: TENDERER'S CREDENTIALS (BID CAPACITY) to be submitted as per Annexure- VI of GCC-2022. (This annexure will be applicable, if tenders having advertised value more than Rs 20 crore wherein eligibility criteria includes bid capacity).
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII, IX, XI. Annexure-V, V(A), VI, VI A & VI B of GCC-2022 respectively. These Annexure are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days. Otherwise, Railway reserves rights to Reject/Accept such tender/offer without any reference to the tenderer/tenderers.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Open e-tender for the work of strengthening of Bridge approaches of major bridges in the section of Assistant Engineer/Line/Jamalpur in the jurisdiction of Senior Divisional Engineer-III/Malda. (Bridge No.163, 164, 165, 182, 183, 184, 186, 187, 188, 195, 205, 57, 58, 59, 60, 75)
204-MLDT-25-26
204-MLDT-25-26
Open
Works - General
12 Months
Maldah, West Bengal
₹0
₹2.4 L
24 Mar 2026
2 Mar 2026
10 Mar 2026
51 items across 4 schedules · ₹1,82,39,761.79 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Making water tight coffer dam earthen platform by any means i.e. by earth work or filled with earth sand retained on nominal slope or ballah piling as necessary or lay other means in a particular space i.e. excavation etc. to enable the space to dewatered. The rate also includes removal earthen platform and clearing work site upto the satisfaction of Site In-charge. After work is completed written approval of Railway Engineer should be obtained for operating item. Ingredients of RCC including cement, labour, tools & plants and all testing directed by the Site Engineer In-charge. | cum by any in be of the this as | 200.00 | 361 | 72,200 |
| 2 | Supplying and driving hard wood ballah piles of sal or similar types of length varying from 5m to 6m and of average diameter 150mm. The rates includes supplying and erecting derricks, monkey, all other necessary equipment, tools, plants, fuel, labours etc. required for completion of the work in respect. The rate also includes application single layer bitumen on the ballah piles before they driven in to the ground. The ballah shall be driven only when these are passed by competent authority and driven order is given. | Metre of as all on the | 950.00 | 505 | 4,79,750 |
| 3 | Driving Rail of section 90R/52kg/75 lbs length 8 mtr. to 10 mtr. The rate should included labours, cutting of rails (to supplied by the Railway free of cost), leading of rails to the site of work upto man in distance of 100 mtr. from the unloading site. Supply all tools & plants, fuel, lift complete Note: Approx. 2/3rd of rail length will be driven inside the earth and payment will be made the length of rail driven in the earth only. | of Metre be be of for | 100.00 | 700 | 70,000 |
| 4 | RCC M-25 grade as per Rlys approved drawing and specification for construction of bridge structure /super strucre /RCC jacketing of arch ,pier abutment etc.The rate includes design concrete mix manufacture of concrete batching plant ,cost of form work included erection and de-shuttering ,placement concrete using concrete pump /placing boom,compaction steel reinforecement cutting ,bending and binding of reinforcement with inding wires and placing in proper position,curing of concrete up to specified period complete in all respect including all lead lift crossing road /track etc.The rate also includes cost of all ingredient of RCC cement,sand aggregate ,admixture ,labour tools and plants etc.but excluding the cost reinforcement.The contractor has to construct the approach road to the site at his own cost required no extra payment will be made this. | cum sub of y of in/c of ,if for | 70.00 | 12,592 | 8,81,440 |
| 5 | Measuring and collecting of existing field data of Bridsges after conducting field survey site for calculation of long section and cross section of each bridge for preparation drawings in AutoCad for the purpose of R. C. Jackeing/ flooring of arch bridges/ New additional openings, RUB etc. The rate includes to submit the photograph print of each bridge showing the existing condition of the bridges. The rate includes transportation & other conveyance with man power to reach the section of bridge site. The rate includes lead, lift, ascend, descend etc. | Each at of C. mid all | 14.00 | 6,700 | 93,800 |
| 6 | After collection of field survey data of existing bridges, the same is to be developed, digitization(vectorization), plotting scanning for preparation of new drawing minimum A0 size through AutoCad 2004 higher version as per instruction of Engineer- in-charge based on data supplied by Railway. Every drawing should be supplied by Contractor in 1 no. tracing sheet (Minimum GSM) of approved quality (Gateway or simiar). The rate should be inclusive of supplying copies of each drawings on 2 nos CDROM main, 1 back up) as well as loading the same hard disk of nominated PC. No Railway material shall be supplied by the Railway this work. | Each and or the soft (1 in for | 14.00 | 8,180 | 1,14,520 |
| 7 | The Hard copies of photographs to be supplied in good quality paper (1 set), and duly laminated and in a file format documentation and preservation at Divisional HQ. | Each for | 14.00 | 695 | 9,730 |
| 8 | RCC M-35 grade as per Rlys approved drawing and specification for construction of bridge structure /super strucre /RCC jacketing of arch, pier abutment etc. The rate includes design concrete mix manufacture of concrete batching plant, cost of form work included erection and de-shuttering, placement concrete using concrete pump /placing boom,compaction steel reinforecement cutting, bending and binding of reinforcement with inding wires and placing in proper position, curing of concrete up to specified period complete in all respect including all lead lift crossing road/track etc. The rate also includes cost of all ingredient of RCC cement, sand aggregate, admixture, labour tools and plants etc. but excluding the cost reinforcement. The contractor has to construct the approach road to the site at his own cost, required no extra payment will be made this. | cum sub of y of in/c of if for | 60.00 | 13,001 | 7,80,060 |
| Schedule total | ₹25,01,500 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCACS6.pdf
ATTACHMENT
GCC-2022ACS7.pdf
ATTACHMENT
GCC-2022ACS9.pdf
ATTACHMENT
ModifiedTDofHQ-29.08.25.pdf Bid Document
ATTACHMENT
GCCACS10.pdf
ATTACHMENT
BGFormatforBidSecurity.pdf
ATTACHMENT
Instruction regarding Cable Cutting
ATTACHMENT
I_CT_GCC-
ATTACHMENT
GCCACS.pdf
ATTACHMENT
ACS-2toGCC-2022.pdf
ATTACHMENT
3rd Corrigendum to GCC 22
ATTACHMENT
FormV.pdf
ATTACHMENT
FormVA.pdf
ATTACHMENT
FormVIB.pdf
ATTACHMENT
TechnicalCompliance.pdf
ATTACHMENT
Commercialcompliance.pdf
ATTACHMENT
CheckList.pdf
ATTACHMENT
GCCACS4.pdf
ATTACHMENT
GCCACS5.pdf
ATTACHMENT
ModifiedTDofHQ-29.08.25.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
GCC2022ACS-3_20230426_114140.pdf
ATTACHMENT
Tele_Cir_17-2013regardingcablecut.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .