Loading…
Loading…
Tender ID
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
7 May 2026, 4:30 pmClosed
XEN Hyd Div Ramban
XEN Hyd Div Ramban
Refer to BOQ
2026_IFC_308353_1
E-Nit No. 03 of 2026-27
Open Tender
Civil Works
Percentage
334 days
Ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
XEN Hyd Div Ramban
₹8,000
Yes
24 Apr 2026
22 Apr 2026
8 May 2026
23 Apr 2026
7 May 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | - | Cum | 1 | - |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge ordinary rock | - | Cum | 1 | - |
| 3 | Earth work in bulk excavation by Mechanical means (Hydrasulic Excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All Kinds of soil | - | Cum | - | - |
| 4 | E/work in excavation by manual means in trenches for foundations, drains , pipes , cables etc. (Not exceeding 1.5mtr in width) and for shafts , wells , cesspits and like not exceeding 10 Sqm on Plan, lift up to 1.50 mtr. Including disposal of excavted earth , with all leades and lift completed IN all kind of soil . | - | Cum | 1 | - |
| 5 | Demolishing of cement concrete manually/ by mechanical means including disposal of excavated material with in 50 mtrs lead as per directions of the in charge engineer.
a) 1:3:6 or rich mix (I/C equivalent design mix) | - | Cum | - | - |
| 6 | b) 1:4:8 or linear Mix (I/C equivalent design mix) | - | Cum | 1 | - |
| 7 | Dry Random Rubble masonry with hard stone in foundation Plinth using Nallah Stone Without Bond stone. | - | Cum | - | - |
| 8 | Filling available excavated earth (excluding Rocks) in trenches plinth sides of foundations etc in layers not exceeding 20cms in depth consolidating each deposited layer by ramming and watering lead up to 50 mtrs and lift upto 1.5Mtrs. | - | Cum | - | - |
| 9 | Clearing jungle including uprooting of rank vegetation , grass , brushwood, trees and sapling of grith upto 30cm measured at height of 1 M above ground level and removal of rubbish upto a distance of 50m outside the priphery the area cleared | - | Sqm | - | - |
| 10 | Silt clreance from canals / Khuls inclusive of intial lead and lift (50m 1.50 m respectively ). a) Dry | - | cum | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.17 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_999374.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .