| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 CrAccepted-Finance | ₹10.5 Cr | L1 | Accepted-Finance Quoted Amount is Lowest bidder is L1 |
| 2 | L2₹10.6 CrRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹10.6 Cr | L2 | Rejected-Finance Quoted Amount is not Lowest bidder is L2 |
| 3 | L3₹11.8 CrRejected-Finance 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | ₹11.8 Cr | L3 | Rejected-Finance Quoted Amount is not Lowest bidder is L3 |
| 4 | L4₹12.9 CrRejected-Finance C 65 RDC RAJNAGAR DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹12.9 Cr | L4 | Rejected-Finance Quoted Amount is not Lowest bidder is L4 |
| Sl No | Description | Qty | Unit | BHAMAR SINGH L2 | M/s Kaiser Construction Engineers and Contractor L1 | Shri Krishna Construction Projects Pvt Ltd L4 | VELJI RATNA SORATHIA INFRA PVT. LTD L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry ordinary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m from the foundation trenches for proper completion of work as per relevent clause of IS Code and ID Specification. | 13,701.22 | M³ | 40 ₹5.5 L | 60 ₹8.2 L | 60 ₹8.2 L | 55 ₹7.5 L |
| 2.00 | Providing and laying of Cement concrete in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size ) and curing complete , including cost of form work in foundation and floors for proper completion of work as per relevent clause of IS Code and ID Specification as per direction of Engineer-in-Charge. | 191.91 | M³ | 4,400 ₹8.4 L | 4,000 ₹7.7 L | 6,000 ₹11.5 L | 5,950 ₹11.4 L |
| 3.00 | Class - 150 ( Non modular ) brick work in 1:4 cement and coarse sand mortar in foundation and plinth including cost of labour, material and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 123.92 | M³ | 4,950 ₹6.1 L | 4,900 ₹6.1 L | 5,800 ₹7.2 L | 5,800 ₹7.2 L |
| 4.00 | Mild steel or Iron work in plain work such as reinforced concrete or reinforced brick work (When not including in and an all over rates) brought to required shape as necessary including bending for proper completion of the work and excluding the supply of steel and its waistage Bend, Hooks, binding wire and authorized over lapping shall be measured up to floor to level. (6mm TMT to 32 mm TMT ) . | 179.33 | Mt | 68,500 ₹1.2 Cr | 60,000 ₹1.1 Cr | 91,000 ₹1.6 Cr | 80,000 ₹1.4 Cr |
| 5.00 | RCC work Providing and laying in position specified grade of reinforced cement concrete, Slab including the cost of centering, shuttering, finishing and excluding reinforcement- Above plinth level upto fifth floor level in 1:1.5:3 (1cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2,175.55 | M³ | 7,155 ₹1.6 Cr | 6,000 ₹1.3 Cr | 8,700 ₹1.9 Cr | 8,100 ₹1.8 Cr |
| 6.00 | Providing and laying of cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size ) and curing including cost of labour, material and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 5,941.95 | M3 | 6,010 ₹3.6 Cr | 4,800 ₹2.9 Cr | 6,950 ₹4.1 Cr | 6,400 ₹3.8 Cr |
| 7.00 | Providing and Laying of Cement concrete 1:3:6 with cement, coarse sand , and stone grit 20 mm nominal size, including cost of all materials, labour, dewatering, curing and T&P etc . for proper completion of work as per relevent clause of IS Code and ID Specification as per direction of Engineer-in-Charge. | 249.6 | M3 | 5,000 ₹12.5 L | 4,500 ₹11.2 L | 6,500 ₹16.2 L | 6,200 ₹15.5 L |
| 8.00 | 12mm Cement plaster with cement mortar in 1:4 (1 Cement : 4 corse sand) of single coat for interior plastering upto floor to level including internal rounded angles chamfers and rounded angles not exceeding 80mm in girth finished even and smooth including all cost of labour, material and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 3,920.56 | M2 | 170 ₹6.7 L | 150 ₹5.9 L | 160 ₹6.3 L | 140 ₹5.5 L |
| 9.00 | Lettering and Painting with enamel paint (renewal coat) including all cost of material, labour and T&P etc. Complete. K.M. Stone ( 5th). | 5 | Each | 100 ₹500 | 300 ₹1,500 | 200 ₹1,000 | 175 ₹875 |
| 10.00 | Providing and supplying of boundry piller as per approved drawing including all cost of labour, material and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 248 | No | 1,750 ₹4.3 L | 1,200 ₹3.0 L | 1,910 ₹4.7 L | 1,300 ₹3.2 L |
Tender Value
₹15.8 Cr
EMD Value
₹31.7 L
Closing Date
17 Apr 2026, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer 2nd Circle Irrigation Works Kanpur.
Janapad Mainpuri me Etawah Shakha ke Km. 20.000 se Km. 44.705 tak Puransthapana ke Karya.
2026_UPIDC_1133579_2
12/S.E.-II/2025-26
Open Tender
Civil Works - Canal
365 days
Mainpuri
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,800
₹31.7 L
Yes
Kanpur
27 May 2026
7 Apr 2026
17 Apr 2026
7 Apr 2026
17 Apr 2026
7 Apr 2026
8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry ordinary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m from the foundation trenches for proper completion of work as per relevent clause of IS Code and ID Specification. | - | M³ | - | - |
| 2 | Providing and laying of Cement concrete in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size ) and curing complete , including cost of form work in foundation and floors for proper completion of work as per relevent clause of IS Code and ID Specification as per direction of Engineer-in-Charge. | - | M³ | - | - |
| 3 | Class - 150 ( Non modular ) brick work in 1:4 cement and coarse sand mortar in foundation and plinth including cost of labour, material and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | - | M³ | - | - |
| 4 | Mild steel or Iron work in plain work such as reinforced concrete or reinforced brick work (When not including in and an all over rates) brought to required shape as necessary including bending for proper completion of the work and excluding the supply of steel and its waistage Bend, Hooks, binding wire and authorized over lapping shall be measured up to floor to level. (6mm TMT to 32 mm TMT ) . | 0.2 | Mt | - | - |
| 5 | RCC work Providing and laying in position specified grade of reinforced cement concrete, Slab including the cost of centering, shuttering, finishing and excluding reinforcement- Above plinth level upto fifth floor level in 1:1.5:3 (1cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | M³ | - | - |
| 6 | Providing and laying of cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size ) and curing including cost of labour, material and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | - | M3 | - | - |
| 7 | Providing and Laying of Cement concrete 1:3:6 with cement, coarse sand , and stone grit 20 mm nominal size, including cost of all materials, labour, dewatering, curing and T&P etc . for proper completion of work as per relevent clause of IS Code and ID Specification as per direction of Engineer-in-Charge. | - | M3 | - | - |
| 8 | 12mm Cement plaster with cement mortar in 1:4 (1 Cement : 4 corse sand) of single coat for interior plastering upto floor to level including internal rounded angles chamfers and rounded angles not exceeding 80mm in girth finished even and smooth including all cost of labour, material and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | - | M2 | - | - |
| 9 | Lettering and Painting with enamel paint (renewal coat) including all cost of material, labour and T&P etc. Complete. K.M. Stone ( 5th). | - | Each | - | - |
| 10 | Providing and supplying of boundry piller as per approved drawing including all cost of labour, material and T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | - | No | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.97 MB
Tendernotice_2.pdf
PDF • 5.97 MB
BOQ_2116744.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid