Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹30.3 LAccepted-Finance 2 III 7 OBRA COLONY OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | L-1 | Accepted-Finance L-1 Bidder | |
| 2 | L-2₹40.1 L+₹9.7 L (32.1%)Rejected-Finance | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Qualified as per PQC. |
Tender Value
₹30.5 L
EMD Value
₹30,500
Closing Date
27 Jun 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, OandMC-II, 2X200MW, BTPS
Superintending Engineer, OandMC-II, 2X200MW, BTPS, Obra
Preventive/Breakdown maintenance of Turbine side rotating auxiliaries of 5x200MW Units, BTPS, Obra.
2022_RVUNL_703514_1
e-t- No. 03/SE-II/2x200MW/TMD-II/22-23
Open Tender
Miscellaneous Works
Fixed-rate
365 days
5x200MW, BTPS, OBRA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
DY. Chief Account Officer, BTPS, OBRA
₹30,500
26 Aug 2022
27 May 2022
30 Jun 2022
27 May 2022
27 Jun 2022
27 May 2022
27 May 2022 - 27 Jun 2022
Amount
Changing of Mech. Seal Boiler Feed Booster Pumps:-
Driving End.
Non Driving End.
Re-visioning of seal water cooler of Boiler Feed Pumps.
Re-visioning & checking of working oil cooler of BFP.
Re-visioning & checking of Lub Oil Cooler of B.F.P.
Re-visioning & Checking of Tube Leakage of S.W. Heat Exchanger (Cooler)
Re-visioning & Checking of the Tube Leakage of B.C.W. heat exchanger (Cooler)
Re-visioning & Checking of tube leakage of S.W.C. Heat Exchanger (Cooler).
Re-visioning & checking of wire mesh of suction Strainer of B.F.P.
Overhauling of Boiler Feed Pump up to Balancing Disc only
Replacement of inside Stator Assy. of BFP.
Changing of Mech. Seal of Boiler Feed Pump (Suction side)
Changing of Mech. Seal of BFP (Discharge side).
Inspection/Rectification of fault of BFP Bearings.
Pump Suction End Bearing.
Pump Discharge End Bearing.
Motor Driving End Bearing.
Motor Non Driving End Bearing.
O/H of Boiler Feed Booster Pump.
Complete O/H of Drip pumps.
O/H of C.W. Booster Pump.
Overhauling of H2 Gas Cooling Pump.
Alignment of Motor of Boiler Feed Booster Pump.
Alignment of Motor of C.W. Booster Pump.
Re-adjustment of Bearing for Replacement of Boiler Feed pump (Motor).
Inspection Rectification of fault of Drip pump.
Overhauling of BCW Pump.
Overhauling of H.W. Make up Pump.
Overhauling of S.W.C. Pump.
Overhauling of S.W. Pumps.
Overhauling of Phosphate Dosing Pump.
Re-visioning/Replacement of worn out thrust pad of BFP.
O/H of Hydrazine Pumps:-
Re-visioning of Suction filter and associated Valves of Hydrazine pumps.
Alignment of Motor of Drip Pump:-
Alignment of Motor of H2 Gas Cooling Pump.
Alignment of Motor of B.C.W. Pump.
Alignment of Motor of Hot well make up pump.
Alignment of Motor of S.W.C. Pump.
Alignment of Motor of S.W. Pump.
Alignment of B.F.P. with Hydraulic coupling.
Inspection/Rectification of fault of journal bearings of BF. Booster pump (CE & FE)
Shifting of condensate pump from one unit to other unit.
Without Modification in piping.
With Modification in piping.
Fabrication of Compensator of Suction Line of Condensate pump.
Fitting of compensator in suction line of condensate Pump.
Inspection/Rectification of fault of BHRC-28 Condensate pump Bearing.
Complete Overhauling of Condensate Pump.
Re-visioning & Checking of wire mesh of suction Strainer of condensate pump.
Cleaning of strainer of Cond. Pumps.
Overhauling of pump of centrifuging machine.
Overhauling of OSU of HP/LP by pass system.
Replacement of BFP lub oil cooler/BFP of working oil cooler/SW cooler.
Overhauling of air washer blower.
Overhauling of air washer pump
Tanks cleaning, cleaning/replacement of nozzle, servicing of filters & servicing of valves
Cleaning of water tubes of working oil cooler of BFP.
Cleaning of water tubes of lubricating oil cooler of BFP.
Cleaning of cooling line of Boiler Feed Booster pumps
Cleaning of cooling line of Drip pumps.
Matching of thrust collar, thrust bearing segment, journal bearing, & runner ring of condensate pumps.
Straightening of condensate pump shaft
Replacement of AOP oil seal to stop oil leakage from its shaft
Replacement of damaged coupling bush of AOP
Replacement of Drip pump by repaired/overhauled Drip pump
Replacement of damaged nipple of BFP
Cleaning of filter of AOP.
Decoupling & coupling of motor of Condensate pump
Attending gland leakage of Cond. pump
Attending gland leakage of Drip pump (Driving end & Non-driving end)
Priming of AOP.
Attending oil leakage of lubricating/working oil pipe line of BFP.
Changing of plunger of Phosphate/ Hydrazine pump
Filling gland in Phosphate/Hydrazine pump
Cleaning of fillers of Phosphate/Hydrazine pump tank.
Replacement of damaged coupling of AOP.
Cleaning of suction filter of air washer pump.
Cleaning of cooling oil of BF Booster pump.
Removal of chocking from the bearing cooling line of condensate pump.
Rectification of foundation base plates of motors of small pumps.
Rectification of couplings of small pump and its mounting.
Cleaning of make up oil storage tank and its oil pipe lines of condensate pumps
Replacement of damaged flange of cooling line of BFP
Alignment of motor of Air washer pump
Alignment of motor of Air washer fan.
Alignment of motor of SOP.
Alignment of AC Lub Oil Pump.
Alignment of DC Lub Oil Pump.
Inspection/Replacement of bearing of Hydraulic Coupling.
Bearing No.-1
Bearing No.-2
Bearing No.-3
Bearing No.-4
Bearing no. – 5
Bearing no. – 6
Bearing no. – 7
Bearing no. – 8 + 9
Bearing no. – 10
Complete overhauling of Hydraulic Coupling (R-16k/R-17/K) without MOP & AOP.
Alignment of Hydraulic Coupling with motor and pump.
Replacement/Re-visioning of main oil pump.
Replacement/Re-visioning of A.O.P.
Revisioning and checking of control block of scoop tube.
Oil cleaning, steam washing of tube bunch with H.T. of lub oil cooler of BFP.
Oil cleaning, steam washing of tube bunch with H.T. of working oil cooler of BFP.
Removal of chocking from the headers of the spray nozzle pipe line by cutting welding and mounting of nozzle followed by red oxide painting.
Replacement/ removal of chocking of existing pipe line of air washer tank.
Changing ‘O’ ring of MOP of BFP hydraulic coupling.
Changing labyrinth seal of BFP motor general bearing. (Out side)
Fabrication & replacement of BFP inlet Cooling header with branch line with proper union / flange.
Fabrication & replacement of BFP outlet Cooling header with branch line with proper union / flange.
Annual breakdown maintenance & O/H of Sump pump of 2X50MW
Overhauling of sump pump (dewatering pump) of screen area
Overhauling of sump pump of auxiliary pump house.
Breakdown maintenance and overhauling sump pump of Turbine hall.
Breakdown maintenance and overhauling sump pump of Turbine hall. (10up-2)
Checking / re-visioning of foot valve of sump pump.
Cleaning of suction filter of sump pump.
Cleaning of suction pit of Auxiliary pump house (Sump Pump).
Removal of chocking from the bearing cooling line of condensate pump by brush and high pressure air.
Replacement of cooling line / removal of chocking of bearing cooling of condensate pump by cutting welding at different places.
Removal of chocking of gland cooling line of drip pump by brush from header to drip pump.
Removal of mud from the cooling coil of BFP booster pump bearing by cutting and brazing.
Removal of chocking of gland cooling line of BFP Booster pump by cutting welding from header to gland box.
Removal of chocking /mud from the seal water cooler including O/H of seal water cooler of BFP.
Removal of chocking / mud from the header of BPF lub oil cooler and working oil cooler. (Main header inlet & outlet.)
Replacement of gland cooling header and branch line of BFP with proper union and square block / flange.
Installation of new phosphate dozing pump / Hydrazine pump/BCW pump / SWC pump / CW Booster pumps in 3X200MW unit.
Filling gland in condensate pump.
Filling gland in drip pump at both ends.
Cleaning of suction filter of hydrazine in phosphate pump.
Removal of mud /foreign partcle from the suction filter of air washer pumps.
Transportation of spares part /consumable /oil from CSD to site store.
M/S S N ENTERPRISES
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .