Loading…
Loading…
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
5 Jun 2026, 4:00 pmDue today
Er Rajesh Kumar
Executive Engineer PWD R and B Division Basohli
Please refer in BOQ
2026_PWDJK_311245_2
e-NIT No. 21 of 2026-27 dated 30-05-2026
Open Tender
Civil Works
60 days
Basohli
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division Basohli
₹2,000
Executive Engineer PWD R and B Division Basohli
30 May 2026
30 May 2026
6 Jun 2026
30 May 2026
5 Jun 2026
31 May 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engaging of labour for demolishing of old structure etc. | 5 | Day | 553 | ₹2,765 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables, etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of surplus excavated earth as directed lead upto 1mtr. from cutting edge.a) All kinds of soil. | 0.57 | cum | 479.3 | ₹273.2 |
| 3 | Providing and laying cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: a) 1:4:8 (1 cement:4 coarse sand:8 graded stone aggregate 40mm nominal size). | 0.04 | cum | 5,202.9 | ₹208.12 |
| 4 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) . a) Light shade using white cement | 7.18 | sqm | 1,293.6 | ₹9,288.05 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centring ,shuttering, finishing and reinforcement. All work upto plinth level with: a) 1:1.5:3 (1 cement:1.5 coarse sand:3 graded stone aggregate 20mm nominal size). | 0.45 | Cum | 7,788.4 | ₹3,504.78 |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. a) 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 0.71 | Cum | 9,395.7 | ₹6,670.95 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: a) Thermo-Mechanically Treated bars of grade Fe-500D or more | 92.8 | Kg | 123.2 | ₹11,432.96 |
| 8Centering and shuttering including strutting propping etc. and removal of form work for:- | |||||
| 8.01 | Foundations, footings, bases of columns etc. for mass concrete. | 3.72 | sqm | 286.35 | ₹1,065.22 |
| 8.02 | Columns, pillars, piers, abutments, posts and struts. | 8.92 | Sqm | 742.55 | ₹6,623.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1007841.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid