Loading…
Loading…
Tender Value
₹2.9 Cr
EMD Value
₹5.9 L
Closing Date
24 Aug 2026, 6:00 pmDue today
The Superintending Engineer PWD Circle Balotara
The Superintending Engineer PWD Circle Balotara
Remaining work of Construction of Various BT Road Under UCRV Scheme Pkg. No. RJ05-18/UCRV/2023-24
2026_CEPWD_582783_1
EE PWD BAITU NIT 06/2026-27
Open Tender
Civil Works
Percentage
180 days
Balotara
Please refer tender Documents
5 documents required · 5 mandatory
₹2,000
The Executive Engineer PWD Dn. Baytu
₹5.9 L
Yes
24 Aug 2026
6 Aug 2026
25 Aug 2026
6 Aug 2026
24 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) | 5,096.22 | CUM | - | - |
| 2 | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) | 4,820.86 | CUM | - | - |
| 3 | Construction of Subgrad and Earthen Shoulders (Construction subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2). | 10,139.87 | CUM | - | - |
| 4 | Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections) | 6,995.5 | CUM | 69 | ₹4,82,689.5 |
| 5 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work) Ordinary soil Manual Means (Depth upto 3 m) | 39 | CUM | 156 | ₹6,084 |
| 6 | Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness) By Mechanical Means In area of light jungle | 4.4 | hectare | 12,507 | ₹55,030.8 |
| 7 | Granular Sub-base with Close Graded Material (Table 400-1) Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density. complete as per clause 401) for grading-III Material (incl. lead & all lifts to 1 km | 6,772.28 | CUM | 268 | ₹18,14,971.04 |
| 8 | Water Bound Macadam (Providing, laying. spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) By Manual Means Grading- II (Using Screening Crushable type such as Moorum or Gravel) Using Screening Crushable type such as Moorum or Gravel | 1,662.19 | CUM | 1,105 | ₹18,36,719.95 |
| 9 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density) By Manual Means Grading-III (Using Screening Crushable type such as Moorum or Gravel) Using Screening Crushable type such as Moorum or Gravel | 1,662.19 | CUM | 1,201 | ₹19,96,290.19 |
| 10 | Open-Graded Premie Surcing (Providing, laying and rolling of open uraded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades) Case-1. Mechanical method using Penetration grade Bitumen and HMP of appropriate capacity not less than 75 tonnes/hour | 22,162.5 | SQM | 83 | ₹18,39,487.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.83 MB
Tendernotice_2.pdf
PDF • 0.40 MB
Tendernotice_3.pdf
PDF • 1.71 MB
Tendernotice_4.pdf
PDF • 8.73 MB
BOQ_1035358.xls
BOQ • 0.39 MB
baitu.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].