Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LQualified | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹5.4 L+₹40,066 (8.01%)Qualified | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹5.7 L+₹70,460 (14.1%)Qualified 46 DAR PREMISES SRINAGAR GULMARG ROAD CHINAR COLONY CHECK I KAWOSA BARAMULLA JAMMU KASHMIR 193401 | BUDGAM | JAMMU AND KASHMIR | 193401 | L3 | Qualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
28 Nov 2025, 6:00 pmClosed
Earthwork in excavation in trenches oblique drains not exceeding 1 point 5 m in width as well as 10 sq m on plain in all kinds of soils
P oblique L in position of stone soling hand packed tightly including carriage of 10 km lead
P oblique L in position of cement concrete of specified grade excluding the cost of centring and shuttering 1 ratio 4 ratio 8 by using 40 mm nominal size nallah agg
P oblique L in position of Reinforced cement concrete of specified grade 1 ratio 2 ratio 4
Brickwork with common burnt clay FPS non modular bricks of class designation 75 in foundation and plinth in cement mortar 1 ratio 4 coarse sand
Extra for B oblique W in superstructure above plinth level upto floor V level by manual means
P oblique L in position of RCC in slab lintels etc in 1 ratio 2 ratio 4 mix complete job
Mild steel reinforcement including bending binding and placing in position
Carriage of materials from source to site of work by MT bricks avg lead 5 KM
First class deodar wood
Providing and fixing of CGI Sheets roofing 0 point 63 mm thick
Cement plaster 12 mm thick in 1 ratio 4 mix
8505420
GEM/2025/B/6818621
Two Packet Bid
P oblique L in position of stone soling hand packed tightly
21 days
KUPWARA
Total value wise evaluation
BOQ
6 documents required · 6 mandatory
10%
Exempted
16 Nov 2025
16 Nov 2025
28 Nov 2025
Upg of Trg Infra
Earthwork in excavation in trenches oblique drains not exceeding 1 point 5 m in width as well as 10 sq m on plain in all kinds of soils
P oblique L in position of stone soling hand packed tightly including carriage of 10 km lead
P oblique L in position of cement concrete of specified grade excluding the cost of centring and shuttering 1 ratio 4 ratio 8 by using 40 mm nominal size nallah agg
P oblique L in position of Reinforced cement concrete of specified grade 1 ratio 2 ratio 4
Brickwork with common burnt clay FPS non modular bricks of class designation 75 in foundation and plinth in cement mortar 1 ratio 4 coarse sand
Extra for B oblique W in superstructure above plinth level upto floor V level by manual means
P oblique L in position of RCC in slab lintels etc in 1 ratio 2 ratio 4 mix complete job
Mild steel reinforcement including bending binding and placing in position
Carriage of materials from source to site of work by MT bricks avg lead 5 KM
First class deodar wood
Providing and fixing of CGI Sheets roofing 0 point 63 mm thick
Cement plaster 12 mm thick in 1 ratio 4 mix
Earthwork in excavation in trenches oblique drains not exceeding 1.5 m in width as well as 10 sq m on plain in all kinds of soils
P oblique L in position of stone soling hand packed tightly including carriage of 10 km lead
P oblique L in position of cement concrete of specified grade excluding the cost of centring and shuttering 1:4:8 by using 40 mm nominal size nallah agg Bid Number : GEM/2025/B/6818621 Dated : 16-11-2025 Bid Document 1/12
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8505420.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
cyc_upgd_expdr_dtls_2025-10-23-19-55-11_fd5d0cd7224b9e832e57e110857f31d0.pdf
BOQ
boq_item_sample_file_2025-10-23-19-55-11_6daa8ac1bf52190a3b976c6c64e2b31c.csv.pdf
BOQ
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .