| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.5 LAccepted-AOC | ₹18.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹18.5 LSame as L1Rejected-AOC AT TINIGHARIA NUA SAHI PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹18.5 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L2₹18.5 LSame as L1Rejected-AOC AT NEHUR COLONY PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹18.5 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹18.5 LSame as L1Rejected-AOC | ₹18.5 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹18.5 LSame as L1Rejected-AOC W NO 03 FOREST COLONY BARIPADA PO PS BARIPADA DIST MAYURBHANJ | ₹18.5 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹18.5 L
EMD Value
₹18,500
Closing Date
13 Mar 2026, 5:00 pmClosed
Executive Engineer,Div-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of RCC drain from Rabindranath Mohanty res. to Manu Kar Apartment at Mahanadi Vihar in ward no-47.
2026_ORULB_124262_4
CMC)CTC_Div-IIINo.35/25-26
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹18,500
Yes
25 Jul 2026
27 Feb 2026
18 Mar 2026
27 Feb 2026
13 Mar 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing R.C.C.columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead. | 25.94 | CUM | 1,697 | ₹44,015.43 |
| 2 | Earth work in excavation of foundation in all kind of soil including dressing and leveling the bed and depositing the soil with intial lead and lift etc complete. | 35.63 | CUM | 299.52 | ₹10,670.4 |
| 3 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost of as per the direction of Engineer-In-Charge. | 53.93 | CUM | 612.7 | ₹33,039.85 |
| 4 | Providing cement concrete for unreinforced cement concrete works of proportion (1:4:8) with 40mm size crusher broken hard granite (CBHG) metal of approved quality and from approved quarry in foundation bed and floors including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading and unloading) & equipments for handing, transportation, batching, mixing, placing in position vibrating, curing for __ days complete as per specification drawing and direction of the Engineer-in-charge. | 25.3 | CUM | 6,003.7 | ₹1,51,893.61 |
| 5 | Providing & laying cement concrete of prop. (1:2:4) using 12mm size, screened, washed hard black crusher broken granite chips of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&p etc. as required for the work complete and as per direction of Engineer in charge. | 20 | CUM | 8,041.7 | ₹1,60,854.91 |
| 6 | R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour . | 87.69 | CUM | 6,552.1 | ₹5,74,553.65 |
| 7 | Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). | 73.47 | qntl | 9,395.3 | ₹6,90,272.69 |
| 8 | Rigid smooth centering and shuttering for R.C.C work including false work and dismantling after casting including cost of all labour, materials, T&P required etc. as per the direction of Engineer in charge. | 649.4 | SQM | 248.7 | ₹1,61,505.78 |
| 9 | Remove excavated & dismantled materials from the site by mechanical means with loading and unloading the same within 5 kms lead as per direction of enginner in charge . | 54.44 | CUM | 278.77 | ₹15,176.57 |
| 10 | Provission for Sign Board | 1 | Nos | 6,737.56 | ₹6,737.56 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_583421.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_583421.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .