Updated dates
Tender Value
₹15.2 Cr
EMD Value
₹25.2 L
Closing Date
8 Jun 2026, 4:00 pm3d left
Executive Engineer
HPPWD Division Nadaun
Balance work for the Construction of Building Portion including WS, SI, Septic Tank, Rain water harvesting tank, Site Developnent etc. (Deposit Work)
2026_PWD_135422_1
Construction of Rajiv Gandhi Govt. Model Day Boarding School at Amlehar Tehsil Nadaun Distt. Hamirpu
Open Tender
Civil Works - Buildings
120 days
Nadaun
Please refer Tender documents.
17 documents required · 17 mandatory
₹20,000
EE Nadaun
₹25.2 L
1 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Cutting in earth work by mechanical means in all heights and depths in blasting work in hard rock with chiseling and wedging out of rock ( where blasting work is prohibited) and their intermediate classifiction of soils including, dewatering wherever required, setting of the required lines, levels as shown on the drawing and directed by the Engineer-in-charge at site, and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site( to be arranged by the contractor) as per satisfaction of Engineer-in-charge through all modes of transportion including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools , equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required). All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent . Any loss to the public and private property, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Cubic Metre | 253.6 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in all kinds of soil such as pick, jumper and ordinary/hard rock including getting out and disposal of excavated earth upto all leads and lifts and entire carriage and other incidentals as directed by the Engineer-in charge. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | 1 | Per Cubic Metre | 172.45 | ₹172.28 | BI01010001010000000000000515BI0100001114 |
| 3 | Excavation in foundation trenches etc. in earth work in all kinds of soils such as pick work , jumper work, pick work,pick jumper blasting work, blasting work in soft and hard rock conglomrate rock or saturated soil and its intermediate classification of soil including chiseling/wedging out of rocks (where blasting is prohibited) and pumping or bailing out of watering/dewatering upto any lift stacking the excavated soil clear from the edge of excavation and then returning the stacked soil in layers when required into plinth sides of foundations consolidation each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in charge within any leads including carriage of materials with in all leads, lifts and other incidentals. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | - | Per Cubic Metre | 328.75 | - | BI01010001010000000000000515BI0100001115 |
| 4 | Constructing Course rubble hammer dressed 'U' shape open surface drain with side wall. 15x22 cm(fifteen into twenty two centimetre) in cement mortar 1:6 (one Cement : six Sand) and inside plastring with cement plaster 1:3 (one Cement:three Sand) including earth work and laying 10 cm(ten centimetre) cement concrete in 1:5:10 (one Cement : five Sand : ten graded stone aggregate) of 40 mm(forty millimetre) nominal size and 7.5 cm(seven point five centimetre) cement concrete 1:2:4 (one Cement : two Sand : four Graded stone aggregate of 20 mm(twenty millimetre) nominal size) and finished with a floating coat of neat cement complete as per standard design including providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-25(twenty five), of size 1000 x 450x50 mm(one thousand into four hundred fifty into fifty millimetre), reinforced with 8 mm(eight millimetre) dia four nos longitudinal & 9(nine) nos cross sectional T.M.T. hoop bars, including providing 50 mm(fifty millimetre) dia perforations @ 100 to 125 mm(one hundred to one hundred twenty five millimetre) c/c, including providing edge binding with M.S. flats of size 50 mm x 1.6 mm(fifty millimetre into one point six millimetre) complete, all as per direction of Engineer-in-charge. including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive octroi , royality , Malkana, toll tax, GST or other taxes imposed by the Government. | - | Per Running Metre | 2,421.31 | - | BI01010001010000000000000515BI0100001116 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations excetra in layers in all depth, consolidating each deposited layer by ramming and watering, lead up to all lead and lifts as per direction of the Engineer-in- Charge including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive octroi , royality , Malkana, toll tax, GST or other taxes imposed by the Government. | - | Per Cubic metre | 199.05 | - | BI01010001010000000000000515BI0100001117 |
| 6 | Providing and laying cement concrete 1:4:8 (one cement : four sand : eight graded crushed/broken stone aggregate 40 mm (forty millimetre nominal size) mechanically mixed and vibrated on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights and depths including cost of form work in open foundation complete as per direction of Engineer-in- Charge including carriage of material within all leads and lifts and other incidentals The rates are inclusive octroi , royality , Malkana, toll tax, GST or other taxes imposed by the Government . | - | Per Cubic metre | 5,529.7 | - | BI01010001010000000000000515BI0100001118 |
| 7 | Centering and shuttering including strutting, propping etcetera and removal of form work for Foundations, footings, bases for columns including entire carriage of material in all leads and lifts and other incidentals. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | - | Per Square metre | 277.5 | - | BI01010001010000000000000515BI0100001119 |
| 8 | Centering and shuttering including strutting, propping etcetera and removal of form work for Suspended floors, roofs, landings, balconies and access platform including entire carriage of material in all leads and lifts and other incidentals. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | - | Per Square metre | 684.05 | - | BI01010001010000000000000515BI0100001120 |
| 9 | Centering and shuttering including strutting, propping etcetera and removal of form work for Lintels, beams, plinth beams, girders, bressumers and cantilevers including entire carriage of material in all leads and lifts and other incidentals. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | - | Per Square metre | 558.3 | - | BI01010001010000000000000515BI0100001121 |
| 10 | Centering and shuttering including strutting, propping etcetera and removal of form work for Columns, piers, abutments, pillars, posts and struts including entire carriage of material in all leads and lifts and other incidentals. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | - | Per Square metre | 703.75 | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 0.48 MB
Tendernotice_3.pdf
PDF • 0.21 MB
Tendernotice_4.pdf
PDF • 0.45 MB
Tendernotice_5.pdf
PDF • 0.43 MB
SBD.pdf
Tender Documents • 3.61 MB
BOQ_200589.xls
BOQ • 0.48 MB