Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23,928.20Admitted-Finance | -31.64% | ₹23,928.20 | L1 | Admitted-Finance |
| 2 | L2₹25,517.35+₹1,589.15 (6.64%)Admitted-Finance | -27.10% | ₹25,517.35+₹1,589.15 (6.64%) | L2 | Admitted-Finance |
| 3 | L3₹29,367.70+₹5,439.50 (22.7%)Admitted-Finance | -16.10% | ₹29,367.70+₹5,439.50 (22.7%) | L3 | Admitted-Finance |
| 4 | L4₹30,032.76+₹6,104.56 (25.5%)Admitted-Finance | -14.20% | ₹30,032.76+₹6,104.56 (25.5%) | L4 | Admitted-Finance |
| 5 | L5₹31,100.36+₹7,172.16 (30.0%)Admitted-Finance | -11.15% | ₹31,100.36+₹7,172.16 (30.0%) | L5 | Admitted-Finance |
Tender Value
₹9.4 L
EMD Value
₹18,900
Closing Date
12 Aug 2026, 4:30 pmClosed
Er. fayaz Ahmed
Executive engineer REW Ramban
AS PER NIT
2026_RDPR_318568_2
e-Nit 30 of REW Ramban(SBM BANIHAL)
Open Tender
Civil Works
Percentage
BANIHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Ramban
₹18,900
18 Sept 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
12 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil | - | cum | 479.3 | - |
| 2 | R.R stone masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 graded stone aggregate 20 mm nominal size upto plinth level and curing complete with cement mortar 1:6 nallah agg. | - | cum | 5,402.9 | - |
| 3 | Dry stone Pitching (any thickness excluding the cost of stone on horizontal level) | - | cum | 635.25 | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 7,788.4 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | 286.35 | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | 123.5 | - |
| 7 | Providing and fixing on wall face un-plasticized Rigid PVC rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10 mm gap for thermal expansion. 75 mm diametre | - | Rm | 226.15 | - |
| 8 | Carriage of stone | 1 | cum | 1,087.6 | ₹1,086.51 |
| 9 | Carriage of sand | - | cum | 1,497.4 | - |
| 10 | CIB( citizen information board of Granite Stone) ( complete job) | - | nos | 1,500 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
BOQ_1050572.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .