Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹7.9 L+₹5,319.06 (0.68%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹7.9 L+₹5,716 (0.73%)Admitted-Fee/PreQual/Technical/Finance 05 BABA PALACE MUSRIGHARARI JANDAHA ROAD MUSRIGHARARI SAMASTIPUR BIHAR 848101 | SAMASTIPUR | BIHAR | 848101 | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.9 L
EMD Value
₹15,878
Closing Date
21 Aug 2026, 5:00 pmClosed
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
Work Mahatma Gandhi Nagar Ward mein Alishah Baba Mazar par Boundarywall Chhat Tiles ka nirmaan karya
2026_DOLBU_1173645_2
181/NPP/RUDAULI/2026-27
Open Tender
Civil Works
Percentage
60 days
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹937
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
₹15,878
5 Oct 2026
3 Aug 2026
22 Aug 2026
3 Aug 2026
21 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in fountation in ordinary soil including filling lift upto 1.5 meter and lead upto 30m including filling watering and remaining of excavated earth into the trenches etc all complete S.I. No 251 | 33.01 | CuM | 125 | ₹4,126.25 |
| 2 | P/L P.C.C. 1:6:12 cement, F Sand & B Ballas Including supply of materials Labour and T&P etc required for proper completeion of the work and curing complete also including cost of formwork in foundation and floor all complete S.I. No 275 | 6.09 | CuM | 4,350 | ₹26,491.5 |
| 3 | RCC work in 1:2:4 cement C Sand & Stone grit in raft S.I No 287 | 14.03 | CuM | 7,750 | ₹1,08,732.5 |
| 4 | R.C.C. work in 1:1:5:3 cement c Sand & Stone grit in lighter beam all completeSI NO 285(b) | 2.43 | CuM | 8,935 | ₹21,712.05 |
| 5 | R.C.C. work in 1:1:5:3 cement c Sand & Stone grit in in column all completeSI NO 289 | 2.34 | CuM | 9,480 | ₹22,183.2 |
| 6 | R.C.C. work in 1:1:5:3 cement c Sand & Stone grit for slab all completeSI NO 284(a) | 3.9 | CuM | 8,650 | ₹33,735 |
| 7 | First class 150 brick waork in 1.4 cement &C. sand mortar all complete . S.I.N0305 b for foundation. | 10.86 | CuM | 5,390 | ₹58,535.4 |
| 8 | First class 150 brick waork in 1.4 cement &C. sand mortar all complete . S.I.N0305 b fsuper St b | 19.19 | CuM | 5,760 | ₹1,10,534.4 |
| 9 | 12mm thick plaster in 1.3 cement &C. sand all complete SI NO 583 | 183.27 | Sqm | 190 | ₹34,821.3 |
| 10 | providing and applying white cement based putty of avrage thickness 1mm of approved brand and manufacture over the plastered wall surface toprepare the surface even and smooth complete S.I. No DSR 13.8 | 183.27 | CuM | 98 | ₹17,960.46 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_2204498.xls
BOQ • 0.28 MB
181OTHER.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .