Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAccepted-AOC | ₹4.9 Cr Quoted ₹303.63 | L1 | Accepted-AOC L1, low rate |
| 2 | L2₹375+₹71.37 (23.5%)Rejected-Finance | ₹375+₹71.37 (23.5%) | L2 | Rejected-Finance high rate |
| 3 | L3₹599+₹295.37 (97.3%)Rejected-Finance 44 M PALLONJI AND CO PVT LTD CAWASJI PATEL STREET FORT MUMBAI MAHARASHTRA 400001 | MUMBAI | MAHARASHTRA | 400001 | ₹599+₹295.37 (97.3%) | L3 | Rejected-Finance high rate |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
21 Sept 2020, 1:00 pmClosed
CEO
Maharashtra Maritime Board Indian Mercantile Chambers 3rd floor Ramjibhai Kamani Marg Ballard Estate Mumbai 400 001
Maintenance Dredging at Inner Navigation Channel of Mandwa for the period from October 2020 to May 2021
2020_MMB_606139_1
MMB/CEO/MECS/MandwaDredging/2
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
Lump-sum
365 days
Mandwa
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
via Net Banking
₹2.4 L
Mumbai
4 Jun 2021
27 Aug 2020
22 Sept 2020
27 Aug 2020
21 Sept 2020
27 Aug 2020
27 Aug 2020 - 1 Sept 2020
2 Sept 2020
Amount
Maintenance Dredging at Inner Navigation Channel of Mandwa for the period from October 2020 to May 2021 by suitable dredging equipment, to dredge a navigation channel of 740 meters in length, 150 meters in width to achieve a assured depth of 3.5 meters at specified area, along with slope of 1:4 & tolerance 0.3m as mentioned in the Mandwa Layout Plan. The dredger should be capable of dredging all type of soils, silt marine soft/stiff clay loose boulders, pebbles, soft rocks, hard strata etc. The cost should include all lifts and leads conveying and deposition of the same over dumping area located at an average distance of approx. 11 Km in deep sea. This further includes all necessary arrangements of crew, fuel oil, tools, plants, equipment, machinery and labour along with accessories assembling, mobilising & demobilising all plant and equipment required with cost of pre and post dredging survey, monthly hydrographic survey etc. to the complete satisfaction of the Marine Engineer & Chief Surveyor, MMB. The quantity to be dredged is approximately 1,75,000 Cum for the period from October 2020 to May 2021
Per Cubic meter rate (Inclusive of GST)
ABNCO VIE WIN ENT PVT LTD
M PALLONJI AND CO PVT LTD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .