Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAdmitted-Finance | ₹29.0 L | L1 | Admitted-Finance |
| 2 | L2₹29.9 L+₹92,124.65 (3.18%)Admitted-Finance NOT AVAILABLE | NORTH | DELHI | 110006 | ₹29.9 L+₹92,124.65 (3.18%) | L2 | Admitted-Finance |
| 3 | L3₹31.0 L+₹2.0 L (6.86%)Admitted-Finance | ₹31.0 L+₹2.0 L (6.86%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | LUCKY ENTERPRISES L2 | M/S AARADHYA AND ADHYATM ASSOCIATES L1 | A. A. ENGINEERING CO. L3 |
|---|---|---|---|---|---|---|
| 1.00Supply and erection of follwing material | ||||||
| 2.00 | Cross arm holding clamp PCC 11 mtr | 299 | Nos | 250 ₹74,750 | 220 ₹65,780 | 200 ₹59,800 Lowest |
| 3.00 | Holding clamp for PCC 8.5 | 84 | Nos | 250 ₹21,000 | 220 ₹18,480 | 180 ₹15,120 Lowest |
| 4.00 | 11 kv F-clamp/F bracket | 250 | Nos | 300 ₹75,000 | 250 ₹62,500 Lowest | 250 ₹62,500 Lowest |
| 5.00 | LT shackle insulator | 110 | Nos | 40 ₹4,400 Lowest | 50 ₹5,500 | 40 ₹4,400 Lowest |
| 6.00 | Bolt & nut for shakcle insulator | 109 | Kg | 100 ₹10,900 Lowest | 100 ₹10,900 Lowest | 180 ₹19,620 |
| 7.00 | Eye hook | 109 | Kg | 150 ₹16,350 Lowest | 150 ₹16,350 Lowest | 168 ₹18,312 |
| 8.00 | Stone pad 300×300×75mm | 381 | Nos | 140 ₹53,340 | 100 ₹38,100 Lowest | 200 ₹76,200 |
| 9.00 | Three phase distribution box clamp | 33 | Nos | 150 ₹4,950 | 140 ₹4,620 Lowest | 167 ₹5,511 |
| 10.00 | holding clamp for PCC pole | 270 | Nos | 160 ₹43,200 Lowest | 170 ₹45,900 | 240 ₹64,800 |
Tender Value
₹34.5 L
EMD Value
₹34,450
Closing Date
17 Aug 2026, 2:00 pmClosed
Electricity Distribution Circle hardoi
Electricity Distribution Circle hardoi
32/EDC(H)/2026-27
2026_MVVNL_1173068_1
32/EDC(H)/2026-27
Open Tender
Miscellaneous Works
Item Rate
90 days
EDC Asha Nagar Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
A/C No. 066505005389, IFSC Code ICIC0000665
₹34,450
Electricity Distribution Circle hardoi
24 Aug 2026
28 Jul 2026
18 Aug 2026
28 Jul 2026
17 Aug 2026
28 Jul 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Supply and erection of follwing material | - | - | - | - |
| 0.0 | Cross arm holding clamp PCC 11 mtr | 299 | Nos | - | - |
| 0.0 | Holding clamp for PCC 8.5 | 84 | Nos | - | - |
| 0.0 | 11 kv F-clamp/F bracket | 250 | Nos | - | - |
| 0.0 | LT shackle insulator | 110 | Nos | - | - |
| 0.0 | Bolt & nut for shakcle insulator | 109 | Kg | - | - |
| 0.0 | Eye hook | 109 | Kg | - | - |
| 0.0 | Stone pad 300×300×75mm | 381 | Nos | - | - |
| 0.0 | Three phase distribution box clamp | 33 | Nos | - | - |
| 0.0 | holding clamp for PCC pole | 270 | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_2202871.xls
BOQ • 0.27 MB
TD32.pdf
Tender Documents • 1.65 MB
03-35.pdf
PDF • 0.39 MB
32.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .