| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BAMNA HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | Admitted-Finance |
| 2 | Admitted-Finance NAGLA SADAK HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
20 Sept 2023, 12:00 pmClosed
se
edc hathras
Semi Turnkey
2023_DVVNL_837587_1
EDCH-69/2023-24
Open Tender
Electrical Works
Item Rate
180 days
Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
DVVNL WEBSITE
₹15,000
10 Oct 2023
13 Sept 2023
20 Sept 2023
13 Sept 2023
20 Sept 2023
13 Sept 2023
Amount
Supply of Following Matarial as per relevent ISS
Danger Board With Clamp
Copper L-Piece 50*225*10 MM (LS)
MS Channel 125*65*1300 MM
Holding clamp Top Channel, TPMO etc
T/F Base Angle 75*75*6*2028 mm with clamp nut & Bolt
11 KV Fuse Set
Stone pad
Tee Off Channal
Painting Number Mark with paint
Top Channal
Dropper Channal
AL LUG 400 sqmm
Scope of work
Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
8.5 Mtr. long PCC Poles.
9/11 Mtr Long STP Poles.
11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps Abc Bunch and other required line material, if any.
Incoming VCB 600/300/5 AMP 350 MVA
Outgoing VCB 200/100/5 AMP 350 MVA
Safe Carriage of following from Electricty Store center Hathras to Pit Site of Work through the Kacha and Pakka road loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-70 Kms.)
16 KVA T/F
25/63/100 KVA T/F
Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
PCC poles 8.5/9 Mtr.
9/11 Mtr Long STP Poles.
Double pole complet fitting
Fixing/ Errection of new 11 KV switch gears with Grouting as per respoo manual all cost of labor, material and T&P which required for completion of work
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
ACSR Weasal conductor
ACSR DOG Conductor
Resagging of Existing line by stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
ACSR Weasal conductor
ACSR DOG Conductor
AB Cable 50/95/120 sqmm
Safe Dismenteling of old and used following T/F from Double Pole with opening of all HT/LT Jumpers, all works which required for dismentling of T/F and carriage it up to Store Hathras/ J.E Store all cost of labour and T&P which required for completion of work
10/16 KVA T/F
25/63/100 KVA T/F
250 KVA T/F
Dismentalling of old and used VCB from switchyard and carriage it up to Store Center Hathras/ J.E Store Including all Cost of Labour and T&P Which required for completion of work distance range 0-50 Km
Safe Dismenteling of old 5 MVA T/F from Foundation with opening of all HT Jumpers, opening of radiators, draining of oil all works which required for dismentling of power T/F and carriage it from switch yard to out side boundary all cost of labour and T&P which required for completion of work
Installation of 250/400 KVA T/F on newly/Old constructed Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work
Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection.
16 KVA T/F
25/63/100 KVA T/F
Fixing of Following Accessirious
11 KV TPMO
11 Kv Fuse Set
Danger Board/Plate
Painting Number Mark with paint
Construction of plinth of size 5' * 5 * 4' above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand.
Pipe earthing of 250/400 KVA medium Power Transformers
Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut
Re Guarding / Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The "T" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material.
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Making of all HT Jumpers of new 10 MVA T/F after completion of work all cost of labour and T&P
Back Cartage of Following Matarial
Acsr weasal Conductor scrap
Scrap old Incoming VCB
Scrap old Outgoing VCB
LT PVC Cable Scrap
R.N. ELECTRICAL WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .