| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.0 LAccepted-AOC | 1 | Accepted-AOC Allotted | |
| 2 | 2₹6.2 L+₹22,114.60 (3.69%)Rejected-Finance | 2 | Rejected-Finance not lowest | |
| 3 | 3₹6.5 L+₹45,340.40 (7.56%)Rejected-Finance | 3 | Rejected-Finance not lowest |
Tender Value
₹5.6 L
EMD Value
₹11,200
Closing Date
6 Feb 2020, 5:00 pmClosed
ExecutiExecutive Engineer Provn Divin PWD BandR Ji
Executive Engineer Provn Divin PWD BandR Jind
Construction of Side drain on Julana Badchaper road in Jind Distt
2019_HRY_113865_1
PWD/Jind/side drain Julana-Badchapper road
Open Tender
Civil Works
Works
90 days
Jind
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
Executive Engineer Provn Divin PWD BandR Jind
₹11,200
Yes
Executive Engineer Provn Divin PWD BandR Jind
13 Mar 2020
17 Jan 2020
7 Feb 2020
17 Jan 2020
6 Feb 2020
17 Jan 2020
21 Jan 2020
Amount
Earth work in excavation in foundations, trenches etc. in all kinds of soil, not exceeding 2 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry in 15 cm layers with compaction, including disposal of all surplus soil as directed within a lead of 30 Mtrs. (HSR 6.6)
Cement concrete 1:4:8 with stone aggregate 40 mm nominal size in foundation & plinth. (HSR 10.39)
Cement concrete 1:2:4 with stone aggregate 20mm nominal size in foundation and plinth.(HSR 10.41)
Cement concrete 1:1½:3 with stone aggregate 20 mm nominal size for reinforced concrete work in slabs with with inclination not exceeding 25 degree with horizontal, excluding steel reinforcement, but including centring and shuttering, laid in position, complete in all respect. [HSR. 10.82 + 10.95 (a)].
First class brick work laid in cement sand mortar 1:4 in foundation plinth. (HSR 11.4)
12 mm Thick Cement Plaster 1:4 on the rough side of single or half brick wall. (HSR 15.5).
Fe-500 EQR TMT steel bar for RCC work, where not included in the complete rate of RCC including bending, binding & placing in the position complete. (Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. From the length so measured, the weight of reinforcement shall be calculated in tones on the basis of IS:1732.Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing, shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement). (NS).
Ashish
BALWAN CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .