| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹6.1 L (2.71%)Admitted-Finance | ₹2.3 Cr+₹6.1 L (2.71%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 Cr+₹18.4 L (8.13%)Admitted-Finance | ₹2.4 Cr+₹18.4 L (8.13%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SAKTHI ENGINEERS L3 | DAMU CONSTRUCTIONS L2 | Anusha Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing light jungle area, bulb weeds, grass including cutting all unwanted plants, branches, twigs, wild growth etc. complete, and disposing the same 100metres away manually or burning them without disturbing other areas etc., complete all as directed by the Engineer-in-Charge. Contractor must be informed to Engineer-in-charge and prior permission shall be obtained from him for burning the wild growth. | 1,500 | Sq.m. | 7 ₹10,500 | 6 ₹9,000 Lowest | 11 ₹16,500 |
| 2.00 | Earthwork excavation by mechanical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level up to the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, leveling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-charge 2a)All kinds of soil with depth up to 1.5m below average Ground level and disposing surplus excavated earth up to a lead of 50 meters. | 3,040 | Cu.m. | 725 ₹22,04,000 Lowest | 780 ₹23,71,200 | 790 ₹24,01,600 |
| 3.00 | Supplying and filling in basement with Quarry dust, filling in layers of not more than 150mm thick, each layer well rammed and consolidated by hand/mechanical roller including watering, leveling, dressing the top surface to the required level complete all as per specification and as directed by the Engineer. | 220 | Cu.m. | 1,800 ₹3,96,000 Lowest | 2,100 ₹4,62,000 | 2,300 ₹5,06,000 |
| 4.00 | Providing and laying plain cement concrete 1:4.5:8 using 25mm maximum size graded aggregates including mechanical mixing, transporting and placing in required position, ramming, compaction, leveling, curing, shuttering, dewatering if any, complete all as per specification for leveling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications. | 220 | Cu.m. | 8,700 ₹19,14,000 | 7,000 ₹15,40,000 Lowest | 7,460 ₹16,41,200 |
| 5.00 | Supplying, fabricating, erecting and fixing in position at all levels, centering and shuttering to correct line and levels including strutting, propping, etc., with necessary bracings in all axes to give a stable assembly with provision for making the joints in the shuttering fully leak proof and with provision for fixing coil nuts with tie rods along with suitable channel for lateral supports and for inserts, projecting dowels, anchor bolts or any other fixture, including staging, access and working platforms etc., all complete as specified and directed including dismantling and removing the aforesaid assembly after the concrete attains the sufficient strength to self-support itself without cracking and distortion all as per specification, including all materials and labour complete in all respects at all lifts. (The measurement for the formwork will be the actual area of forms in contact with concrete surfaces.) Shuttering with plywood panels alone will be permitted. | 3,330 | Sq.m. | 880 ₹29,30,400 Lowest | 1,030 ₹34,29,900 | 910 ₹30,30,300 |
| 6.00 | Providing, straightening, decoiling wherever necessary bending, cutting, binding and fixing in position steel reinforcement TMT bars of Fe500D grade steel conforming to IS:1786 and tying with approved annealed binding wire of 1.6mm dia in all reinforced cement concrete work at all lifts, including cost of supplying and fixing the spacer/cover blocks and binding wire complete all as per specification and as directed by Engineer-in-Charge at all lifts.
Note: The rate shall be including the cost and testing of reinforcement steel at third party NABL lab. The reinforcement steel will be procured from dealers with a test certificate as approved by the department. For further details please see Clause 11 of Section VIII, General Information for Guidance of Tenderers. | 75 | M.T | 1,20,000 ₹90,00,000 | 1,09,500 ₹82,12,500 | 1,09,000 ₹81,75,000 Lowest |
| 7.00 | Providing and laying cast insitu controlled reinforced cement concrete of specified grade at all levels and lifts mentioned below using 20mm maximum size hard granite machine crushed graded stone aggregates including weigh batching, charges for mixing & cost of admixture, mechanical mixing, transporting and placing at all lifts, vibrating, consolidating, curing and finishing smooth of all exposed faces complete for column footings, columns, lintels, sunshades, gutter slabs, beams, slabs, water tank, machine foundation and all other structural elements including dewatering wherever necessary (Formwork and reinforcement will be paid for separately) all as per specification and all as shown in drawings and as directed by the Engineer-in-charge for all in-situ item. Note:1. The rate of concrete shall include all labour,equipment charges for mixing & cost of admixture. chemical admixture confirming to IS 9103 shall be mixed in frresh concrete and prior permission from engineer-in-charge shall be obtained for dosage and compatibility. 2.Test certificate of cement,procured from dealer/company to be submitted for all cement related works by the contractor. 3.The rate shall be quoted on the basis of using minimum cement per cu.m of concrete mentioned below for relevent grade of concrete.Any upward /downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in scedule F (7a.M30 grade with 370 kg. of cement per Cu.m. of concrete for all floors) | 560 | Cu.m. | 13,000 ₹72,80,000 | 11,800 ₹66,08,000 | 11,075 ₹62,02,000 Lowest |
| 8.00 | Providing, supplying, cutting, bending to shape, welding, fabricating, hoisting, placing and fixing in position structural steel members like MS structural embedment’s/pipe and sleeves/penetration etc. using MS angles, channels, I-sections, plates, tees, flats, rounds, square sections etc. including chamfering and rounding off the edges, applying a coat of Red lead paint primer / Zinc chromate primer of approved make and 2 coats of flat oil paint / synthetic enamel paint of approved colour and make, scaffolding and staging required for fabrication as well as erection complete all as per specifications, drawings and as directed by the Engineer-in-charge.NOTE:Lifting device arrangements if any required also arranged by the contractor at his own cost. | 5 | MT | 1,42,500 ₹7,12,500 | 1,18,000 ₹5,90,000 Lowest | 1,27,500 ₹6,37,500 |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
31 Jan 2024, 3:00 pmClosed
General Manager, INRP(K)
Office of GM, 608 Building, BARC, Kalpakkam
Construction of RCC Pedestals in CWMF complex
2024_BARC_789967_1
BARCF/INRPK-MA/CW/TR/65 /2023
Open Tender
Civil Works
Item Rate
300 days
INRPK/NRB/BARC/Kalpakkam
Please refer tender documents
8 documents required · 8 mandatory
₹0
₹4.4 L
22 Mar 2024
16 Jan 2024
7 Feb 2024
17 Jan 2024
31 Jan 2024
17 Jan 2024
17 Jan 2024 - 25 Jan 2024
Amount
Clearing light jungle area, bulb weeds, grass including cutting all unwanted plants, branches, twigs, wild growth etc. complete, and disposing the same 100metres away manually or burning them without disturbing other areas etc., complete all as directed by the Engineer-in-Charge. Contractor must be informed to Engineer-in-charge and prior permission shall be obtained from him for burning the wild growth.
Supplying and filling in basement with Quarry dust, filling in layers of not more than 150mm thick, each layer well rammed and consolidated by hand/mechanical roller including watering, leveling, dressing the top surface to the required level complete all as per specification and as directed by the Engineer.
Providing and laying plain cement concrete 1:4.5:8 using 25mm maximum size graded aggregates including mechanical mixing, transporting and placing in required position, ramming, compaction, leveling, curing, shuttering, dewatering if any, complete all as per specification for leveling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications.
Supplying, fabricating, erecting and fixing in position at all levels, centering and shuttering to correct line and levels including strutting, propping, etc., with necessary bracings in all axes to give a stable assembly with provision for making the joints in the shuttering fully leak proof and with provision for fixing coil nuts with tie rods along with suitable channel for lateral supports and for inserts, projecting dowels, anchor bolts or any other fixture, including staging, access and working platforms etc., all complete as specified and directed including dismantling and removing the aforesaid assembly after the concrete attains the sufficient strength to self-support itself without cracking and distortion all as per specification, including all materials and labour complete in all respects at all lifts. (The measurement for the formwork will be the actual area of forms in contact with concrete surfaces.) Shuttering with plywood panels alone will be permitted.
Providing, straightening, decoiling wherever necessary bending, cutting, binding and fixing in position steel reinforcement TMT bars of Fe500D grade steel conforming to IS:1786 and tying with approved annealed binding wire of 1.6mm dia in all reinforced cement concrete work at all lifts, including cost of supplying and fixing the spacer/cover blocks and binding wire complete all as per specification and as directed by Engineer-in-Charge at all lifts. Note: The rate shall be including the cost and testing of reinforcement steel at third party NABL lab. The reinforcement steel will be procured from dealers with a test certificate as approved by the department. For further details please see Clause 11 of Section VIII, General Information for Guidance of Tenderers.
Providing and laying cast insitu controlled reinforced cement concrete of specified grade at all levels and lifts mentioned below using 20mm maximum size hard granite machine crushed graded stone aggregates including weigh batching, charges for mixing & cost of admixture, mechanical mixing, transporting and placing at all lifts, vibrating, consolidating, curing and finishing smooth of all exposed faces complete for column footings, columns, lintels, sunshades, gutter slabs, beams, slabs, water tank, machine foundation and all other structural elements including dewatering wherever necessary (Formwork and reinforcement will be paid for separately) all as per specification and all as shown in drawings and as directed by the Engineer-in-charge for all in-situ item. Note:1. The rate of concrete shall include all labour,equipment charges for mixing & cost of admixture. chemical admixture confirming to IS 9103 shall be mixed in frresh concrete and prior permission from engineer-in-charge shall be obtained for dosage and compatibility. 2.Test certificate of cement,procured from dealer/company to be submitted for all cement related works by the contractor. 3.The rate shall be quoted on the basis of using minimum cement per cu.m of concrete mentioned below for relevent grade of concrete.Any upward /downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in scedule F (7a.M30 grade with 370 kg. of cement per Cu.m. of concrete for all floors)
Providing, supplying, cutting, bending to shape, welding, fabricating, hoisting, placing and fixing in position structural steel members like MS structural embedment’s/pipe and sleeves/penetration etc. using MS angles, channels, I-sections, plates, tees, flats, rounds, square sections etc. including chamfering and rounding off the edges, applying a coat of Red lead paint primer / Zinc chromate primer of approved make and 2 coats of flat oil paint / synthetic enamel paint of approved colour and make, scaffolding and staging required for fabrication as well as erection complete all as per specifications, drawings and as directed by the Engineer-in-charge.NOTE:Lifting device arrangements if any required also arranged by the contractor at his own cost.
DAMU CONSTRUCTIONS
SAKTHI ENGINEERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.07 MB
tenderdoc.pdf
Tender Documents • 16.16 MB
BOQ_830338.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .