| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.4 LAdmitted-Fee/PreQual/Technical/Finance AT NIRMAL NAGAR MANJI TOLA ADITYAPUR MAIN ROAD ADITYAPUR | ADITYAPUR | -12.10% | ₹10.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.6 LAdmitted-Fee/PreQual/Technical/Finance 251 TATA KANDRA MAIN ROAD ADITYAPUR SERAIKELLA KHARSAWAN JHARKHAND PIN 831013 | SARAIKELA KHARSAWAN | JHARKHAND | 831013 | -11.00% | ₹10.6 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11.9 L
EMD Value
₹24,000
Closing Date
27 Jun 2026, 5:00 pmClosed
AMC Muncipal Corporation Adityapur
Kalpanapuri, Adityapur
i. Renovation of Aadivasi Kalyan Samiti bhawan ii. Construction of Rcc drain from road 19 to Aadivasi Kalyan Samiti bhawan iii. Paver block in front and left side gali of Aadivasi Kalyan Samiti bhawan in Ward No. 35 under MC Adityapur
2026_UDD_115425_58
UDD/AMC/01/2026-27
Open Tender
Civil Works
Percentage
90 days
Ward No. 35
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹24,000
Yes
7 Jul 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
27 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of pucca brick work or lime work including stacking serviceable materials in countable stacks within 15m lead and disposal of unserviceable materials with all leads and complete as per directions of E/I [ 5.10.1] | 27.05 | Per M3 | 541.67 | ₹14,652.17 |
| 2 | Earth work in excavation for laying of different types and sizes of R.C.C. spun pipes with disposal of excavated earth within intial lead and lift as per specification and direction of E/I. (i) For classification of soil item -A.[JSOR DWSD- 3.3.1(i)] | 6.24 | Per M3 | 239.74 | ₹1,496.46 |
| 3 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance of 50m including all lifts, levelling, ramming the foundation trenches, removing roots of the tree, shrubs all cpmplete as per approved design, building specifications and directions of E/l …..do….do….. specification and direction of E/I. Extra for earthwork in hard soil.[BCD SOR -5.1.1+5.1.2 ] | 99.38 | Per M3 | 167.33 | ₹16,629.59 |
| 4 | Providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/I.[BCD SOR-5.1.10] | 4.16 | Per M3 | 589.51 | ₹2,453.54 |
| 5 | Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete as per buinidng specifiacation and direction of E/I.[BCD SOR-5.6.3] | 41.62 | Per M2 | 330.34 | ₹13,748.75 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement – All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [SOR BCD 5.3.9.1] | 6.24 | Per M3 | 5,218 | ₹32,570.76 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [SOR BCD 5.3.10] | 10.29 | Per M3 | 6,082.45 | ₹62,586.18 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [SOR BCD 5.311] | 16.65 | Per M3 | 6,308.87 | ₹1,05,019.6 |
| 9 | Providing Tor steel of reinforcement of 10mm,12mm &16mm dia. Bars as per approved design and drawing ......... do ........ do ...........E/I.[ BCD SOR- 5.5] | - | - | - | - |
| 10 | 8 mm dia main bar [5.5.4] @ 0.395kg/m | 270.96 | Per Kg | 83.31 | ₹22,574.79 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
terms_conditions.pdf
Tender Documents • 0.39 MB
BOQ_156140.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].