| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.6 L+₹38,910.61 (2.14%)Rejected-Finance | L2 | Rejected-Finance 2nd lowest | |
| 3 | L3₹19.2 L+₹1.0 L (5.69%)Rejected-Finance | L3 | Rejected-Finance 3rd lowest |
Tender Value
₹17.8 L
EMD Value
₹36,000
Closing Date
17 Jan 2026, 12:00 pmClosed
DG (CIVIL)
5 S N BANERJEE ROAD KOLKATA-700013
Infrastructure Development of the Proposed Community Hall at 22/1 Ripon Lane, Kolkata-700016. in Ward No. 61.Ref-Construction of Five Storied New Community Hall at 22/1,Ripon Lane, Kol-700016 in Ward No. 61.(Civil Structural Part of 3rd AND 4TH FLOOR
2025_KMC_980548_1
KMC/DG(C)/EE(C/HQ)/118/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
WARD NO-61
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹36,000
7 Mar 2026
31 Dec 2025
19 Jan 2026
31 Dec 2025
17 Jan 2026
31 Dec 2025
size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. [cement to be supplied by the Manufacturer/ supplier]In ground floor and foundation.(ii) With approved concrete pump 3RD FLOOR
size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. [cement to be supplied by the Manufacturer/ supplier]In ground floor and foundation.(ii) With approved concrete pump 4TH FLOOR
BRICKWORKS,CONCRETE WORKS ETC.40..REINFORCEMENT FOR REINFORCED CONCRETE WORK IN ALL SORTS OF STRUCTURES INCLUDING DISTRIBUTION BARS, STIRRUPS, BINDERS ETC INITIAL STRAIGHTENING AND REMOVAL OF LOOSE RUST (IF NECESSARY), CUTTING TO REQUISITE LENGTH, HOOKING AND BENDING TO CORRECT SHAPE, PLACING IN PROPER POSITION AND BINDING WITH 16 GAUGE BLACK ANNEALED WIRE AT EVERY INTERSECTION, COMPLETE AS PER DRAWING AND DIRECTION.(A) FOR WORKS IN FOUNDATION AND UPTO ROOF OF GROUND FLOOR/UPTO 4 M.(I) TOR STEEL/MILD STEEL.II. 3RD FLOOR
BRICKWORKS,CONCRETE WORKS ETC.40..REINFORCEMENT FOR REINFORCED CONCRETE WORK IN ALL SORTS OF STRUCTURES INCLUDING DISTRIBUTION BARS, STIRRUPS, BINDERS ETC INITIAL STRAIGHTENING AND REMOVAL OF LOOSE RUST (IF NECESSARY), CUTTING TO REQUISITE LENGTH, HOOKING AND BENDING TO CORRECT SHAPE, PLACING IN PROPER POSITION AND BINDING WITH 16 GAUGE BLACK ANNEALED WIRE AT EVERY INTERSECTION, COMPLETE AS PER DRAWING AND DIRECTION.(A) FOR WORKS IN FOUNDATION AND UPTO ROOF OF GROUND FLOOR/UPTO 4 M.(I) TOR STEEL/MILD STEEL.II. 4TH FLOOR
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work.3RD FLOOR
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work.4TH FLOOR
BUILDING WORKS ( C ) BRICKWORKS,CONCRETE WORKS ETC A. BRICK WORKS 7. BRICK WORK WITH 1ST CLASS BRICKS IN CEMENT MORTAR (1:4) (B) IN SUPERSTRUCTURE, GROUND FLOOR.3RD FLOOR ( 3RD CORRIGENDA & ADDENDA DATED 04.06.2018)
BUILDING WORKS ( C ) BRICKWORKS,CONCRETE WORKS ETC A. BRICK WORKS 7. BRICK WORK WITH 1ST CLASS BRICKS IN CEMENT MORTAR (1:4) (B) IN SUPERSTRUCTURE, GROUND FLOOR.4TH FLOOR FLOOR ( 3RD CORRIGENDA & ADDENDA DATED 04.06.2018)
Sub Total
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.40 MB
FORM118.pdf
Tender Documents • 0.57 MB
BOQ_2390929.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .