| 1 | L1₹48.1 CrAdmitted-Finance 24 MISSION COMPOUND AJMER ROAD JAIPUR 302001 RAJ | JAIPUR | JAIPUR | RAJASTHAN | 302001 | ₹48.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹48.9 CrAdmitted-Finance B 31 32 2ND FLOOR INDUSTRIAL ESTATE NEW POWER HOUSE ROAD JODHPUR 342003 RAJASTHAN | JODHPUR | RAJASTHAN | 342003 | ₹48.9 Cr | L2 | Admitted-Finance |
| 3 | L3₹50.6 CrAdmitted-Finance | ₹50.6 Cr | L3 | Admitted-Finance |
| 4 | L4₹51.5 CrAdmitted-Finance | ₹51.5 Cr | L4 | Admitted-Finance |
| 5 | L5₹53.1 CrAdmitted-Finance | ₹53.1 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Unipro Techno Infrastructure Pvt Ltd L8 | OFFSHORE INFRASTRUCTURES LTD L5 | DARA ENGINEERING AND INFRASTRUCTURES PVT LTD L6 | VISHNU PRAKASH R PUNGLIA LTD L2 | BIHANI CONSTRUCTIONS PRIVATE LIMITED L3 | M/s DEVENDRA CONSTRUCTION CO. L4 | lahotybuildcon L7 | GCKC Projects and Works Pvt. Ltd. L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00INTAKE PUMPING STATION | |||||||||||
| 2.00 | Civil work required for installation of New VT/Submersible Pump sets at existing intake well at Sonwa Intake | 1 | Lot | 20,000 ₹20,000 | 61,728 ₹61,728 | 3,25,000 ₹3.3 L | 50,000 ₹50,000 | 3,00,000 ₹3 L | 15,00,000 ₹15 L | 70,00,000 ₹70 L | 1,33,334 ₹1.3 L |
| 3.00Providing, installation, testing, trial run and commissioning of the following, as per site condition & specifications given | |||||||||||
| 4.00 | 1 nos. Vertical turbine pump/Centrifugal Submersible with column pipes and other accessories 7.72 LPS/ 45 m head/ 05 KW | 2 | Nos | 3,90,000 ₹7.8 L | 2,89,585 ₹5.8 L | 5,25,000 ₹10.5 L | 5,00,000 ₹10 L | 4,00,000 ₹8 L | 2,00,000 ₹4 L | 2,99,368 ₹6.0 L | 84,920 ₹1.7 L |
| 5.00 | Variable frequency drive for above mentioned motors including control panel, contactors, starters, multi function meter, power factor control unit etc. | 1 | Lot | 3,50,000 ₹3.5 L | 91,685 ₹91,685 | 3,25,000 ₹3.3 L | 1,50,000 ₹1.5 L | 8,00,000 ₹8 L | 2,00,000 ₹2 L | 1,35,000 ₹1.4 L | 2,66,667 ₹2.7 L |
| 6.00 | Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications. | 1 | Lot | 95,000 ₹95,000 | 91,685 ₹91,685 | 3,25,000 ₹3.3 L | 1,50,000 ₹1.5 L | 2,50,000 ₹2.5 L | 2,00,000 ₹2 L | 1,05,000 ₹1.1 L | 2,66,667 ₹2.7 L |
| 7.00 | Providing, installation, testing and commissioning of LT MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications . 10 KW | 1 | Lot | 3,50,000 ₹3.5 L | 2,92,348 ₹2.9 L | 3,00,000 ₹3 L | 1,00,000 ₹1 L | 3,00,000 ₹3 L | 5,00,000 ₹5 L | 2,55,000 ₹2.5 L | 2,66,667 ₹2.7 L |
| 8.00 | Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications. for 10 KW Panel | 1 | Lot | 1,90,000 ₹1.9 L | 1,21,551 ₹1.2 L | 8,50,000 ₹8.5 L | 75,000 ₹75,000 | 6,50,000 ₹6.5 L | 5,00,000 ₹5 L | 95,000 ₹95,000 | 1,33,334 ₹1.3 L |
| 9.00 | Earthing system complete for LT equipments | 1 | Lot | 15,000 ₹15,000 | 70,988 ₹70,988 | 1,25,000 ₹1.3 L | 15,000 ₹15,000 | 2,00,000 ₹2 L | 50,000 ₹50,000 | 35,000 ₹35,000 | 26,667 ₹26,667 |
| 10.00 | MS discharge pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk with necessary interconnection with existing delivery system etc, as per design 100mm | 1 | Lot | 25,000 ₹25,000 | 35,926 ₹35,926 | 2,25,000 ₹2.3 L | 25,000 ₹25,000 | 1,50,000 ₹1.5 L | 2,00,000 ₹2 L | 1,00,000 ₹1 L | 73,334 ₹73,334 |
Tender Value
₹54.3 Cr
EMD Value
₹1.1 Cr
Closing Date
3 Jun 2021, 6:00 pmClosed
ACE PHED Region Kota
ACE PHED Region Kota Dadabari Kota
Work of Augmentation cum Reorganization of Sonwa Water Supply Project, Distt Baran, as per JJM guidelines including 10-year operation and maintenance
2021_PHCJA_219044_1
NIT No. 02/2021-22
Open Tender
Civil Works - Water Works
730 days
Baran
as per Tender documents
2 documents required · 2 mandatory
₹20,000
EE PHED Project Div. Baran
₹1.1 Cr
Yes
Chief Engineer(SP) PHED Rajasthan
28 Jul 2021
9 Apr 2021
4 Jun 2021
9 Apr 2021
3 Jun 2021
9 Apr 2021
22 Apr 2021
Amount
INTAKE PUMPING STATION
Civil work required for installation of New VT/Submersible Pump sets at existing intake well at Sonwa Intake
Providing, installation, testing, trial run and commissioning of the following, as per site condition & specifications given
1 nos. Vertical turbine pump/Centrifugal Submersible with column pipes and other accessories 7.72 LPS/ 45 m head/ 05 KW
Variable frequency drive for above mentioned motors including control panel, contactors, starters, multi function meter, power factor control unit etc.
Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications.
Providing, installation, testing and commissioning of LT MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications . 10 KW
Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications. for 10 KW Panel
Earthing system complete for LT equipments
MS discharge pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk with necessary interconnection with existing delivery system etc, as per design 100mm
Electrically operated Sluice Valves of on common header piping of sizes, 100mm dia or as per design
Bellows type dismantling joints on suction & common header piping of sizes, 100mm dia
Electrically operated Butterfly Valves on common delivery piping of sizes 100 mm dia
Dual Plate type Check valve of sizes 100mm dia on individual & common delivery piping of following sizes
Electro megnetic flow meter 100 mm size
Kinetic Air Valves of 100mm diameter with isolating Sluice Valve , PN-1.6
Glycerine filled pressure gauges
Interconnection of new delivery header with existing header
Other items & accessories not specified above but required to complete the work on turn key basis
WATER TREATMENT PLANT
Design, construction, execution, testing, commissioning & trial run of 1.00 MLD ( input capacity with maximum 3% losses) in 16 Hrs . Treatment Plant including all relevant civil, electrical and mechanical works, Stores, office along with ancillary civil works as per specifications and control system.
Inlet and Distribution System : Inlet chamber, Measuring channel, flash mixers, main channel to filter complex, by pass, walkways, stairs, railings
Equipment
Civil Works
Clariflocculators : Pipes between flash mixers and clariflocculators, clariflocculators, walkways, stairs, railings, clarified water channel to the main channel
Equipment
Civil Works
Filters and Filter House : Filters, all distribution channel, pipe gallery with clear water channel and sump, control gallery, observation platforms, walkways, stairs, railings, back wash water tank, clear water measuring channel, post chlorination tank & clear water channel up to CWR's.
Equipment
Civil Works
Administrative & Control Building : Administrative Control Building, backwash pumps, blowers, motor control centre, laboratory equipment, water cooler, furniture etc.
Equipment
Civil Works
Chemical House : Chemical house, alum & lime dosing equipment, piping to the injection point and injection devices
Equipment
Civil Works
Chlorine Building, Chlorination & Chlorine Storage : Chlorine storage area, chlorine building, chlorine tonners, chlorination equipments, injection devices.
Equipment
Civil Works
Recycling system : Recycle tank with all equipments, motor etc.
Equipment
Civil Works
Outdoor Piping
Equipment
Civil Works
Laboratory Equipments
Laboratory equipments as per clause 2.1.5 of Vol-II of Tender Document.
Furniture as per clause 2.1.6 of Vol-II of Tender Document
Ancillary Civil Works as per scope of work
Portable pH meter, Chlorine Sensor and turbidity meters, portable flow meter, one each in addition to laboratory equipments
Providing and installation of LT control panels, exhaust fans, cables, cable ducting, earthing, Lighting fixtures, lighting panels, sockets, receptacles, fans, etc. for all pumps of WTP complete in all respect in the outdoor areas of different Treatment plant units, the administration and control building, and other utility areas.
Other items & accessories not specified above but required to complete the work on turn key basis
CLEAR WATER RESERVOIR
Construction of RCC circular clear water reservoirs pf required capacity including excavation in all types of strata, foundation concrete, container walls, bottom slab, top roof slab/dome, 20 mm thick cement plaster with water proofing compound in CM 1:3 proportion and food grade epoxy paint to inner face of the container and dome/slab, DI double Flange Inlet/ Out Let/ Overflow/ Wash out pipes, Duck foot Bends, Puddle Collars, resileant seated sluice valves, Dismantling joint etc.,including refilling and disposing of surplus stuff, all labour and material charges , providing and fixing accessories such as M.S/Aluminium ladder/RCC stairs inside and outside, manhole frame and cover, puddle collar , ventilators, satisfactory hydraulic test and water tightness test as per IS code and providing three coats of cement paint to all exposed surface of structure including dome etc. complete in all respect as per design data criteria, obligatory requirements and detailed specifications, scope of work and GA drawing. The job include painting the name of scheme and other details on the reservoir and any other work related to structure as per the direction to Engineer-in-Charge technical specification and scope of work, complete in all respect.
At Ghodigaon Head Work, 100 KL
At IPS Seeswali, 500 KL
Other items & accessories not specified above but required to complete the work on turn key basis
CLEAR WATER PUMP HOUSE AT WTP
At WTP Head work for Installation of 1W+1S Pumps : Civil work required for construction of pump foundation including required dismantling work. For replacement of 02 pumps, route exchange of 02 pumps & 02 new additional pumps, along with necessary extension of pump house.
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Centrifugal submersible pumps & motor all other accessories of following duty conditions
Seeswali Route route 42.92 LPS / 40 m head/30 KW (1W+1S)
Ratariya Route route 21.50 LPS / 95 m head/37 KW (1W+1S)
MS individual delivery pipe with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk with necessary interconnection with existing delivery system etc. of approved dia., as per specifications
MS common delivery pipe with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk with necessary interconnection with existing delivery system etc. of approved dia., as per specifications
Electrically operated Sluice Valves of on individual & common delivery piping of following sizes
125 mm dia
Bellows type dismantling joints of following sizes on individual & common delivery piping of following sizes
125 mm dia
Electrically operated Butterfly Valves on individual & common delivery piping of following sizes
125 mm dia
Dual Plate type Check valve of following sizes on individual & common delivery piping of following sizes
125 mm dia
Kinetic Air Valves of 100 mm diameter with isolating Sluice Valve of 100 mm size
Glycerine filled pressure gauges
Providing, installation, testing, trial run and commissioning of the following, as per the specifications
Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications.
Providing, installation, testing and commissioning of LT MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications .
Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications.
Earthing system complete for LT equipments
For LT Panet & motors for New Pump
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Full Bore Electro magnetic Flow meter with suitable size by pass arrangement and associated pipes and specials etc, as per scope of work for following headworks
125 mm dia
Manually operated Sluice Valves for flow meter arrangement :
125 mm dia
Bellows type dismantling joints on flow meter arrangement :
125 mm dia
Construction of Flow meter chamber
Other items & accessories not specified above but required to complete the work on turn key basis
CLEAR WATER PUMP HOUSE AT GHORIGAON
At Ghorigaon IPS Head work for Installation of 3W+3S Pumps : Civil work required for construction of pump foundation including required dismantling work. For replacement of 02 pumps, route exchange of 02 pumps & 02 new additional pumps (100 Sqm)
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Centrifugal horizontal split casing pumps & motor all other accessories of following duty conditions
Mahuwa Route route 11.25 LPS / 75 m head/15 KW (1W+1S)
Sarkanya Route route 5.91 LPS / 70 m head/7.5 KW (1W+1S)
Extension of MS suction header and commong suction pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk
125mm Dia
MS discharge pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk
100 mm dia
80 mm dia
MS common Delivery Pipes (manifold) with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc. -5mm thk
100 mm dia
80 mm dia
Electrically operated Sluice Valves of on suction & common header piping of following sizes
Suction Header -200 mm
125mm Dia
Bellows type dismantling joints on suction & common header piping of following sizes
Suction Header -200 mm
125mm Dia
Electrically operated Sluice Valves of on individual & common delivery piping of following sizes
100 mm dia
80 mm dia
Bellows type dismantling joints of following sizes on individual & common delivery piping of following sizes
100 mm dia
80 mm dia
Electrically operated Butterfly Valves on individual & common delivery piping of following sizes
100 mm dia
80 mm dia
Electro megnetic flow meter 100 mm size
Dual Plate type Check valve of following sizes on individual & common delivery piping of following sizes
100 mm dia
80 mm dia
Kinetic Air Valves of 100 mm diameter with isolating Sluice Valve of 100 mm size
Glycerine filled pressure gauges
Providing, installation, testing, trial run and commissioning of the following, as per the specifications
Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications.
Providing, installation, testing and commissioning of LT MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications .
Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications.
Earthing system complete for LT equipments
For LT Panet & motors for New Pump
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Full Bore Electro magnetic Flow meter with suitable size by pass arrangement and associated pipes and specials etc, as per scope of work for following headworks
100 mm dia
80mm Dia
Manually operated Sluice Valves for flow meter arrangement :
80mm Dia
100 mm dia
Bellows type dismantling joints on flow meter arrangement :
80mm Dia
100 mm dia
Construction of Flow meter chamber
Other items & accessories not specified above but required to complete the work on turn key basis
CLEAR WATER PUMP HOUSE AT SEESWALI
Civil work construction of Pump House for Installation of 3W+3S pump sets with provision of 02 future pump set, 250 Sqm
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Centrifugal horizontal split casing pumps & motor all other accessories of following duty conditions
Seeswali ESR Route route 18.75 LPS / 35 m head/11 KW (1W+1S)
Tisaya Route route 24.76 LPS / 75 m head/30 KW (1W+1S)
Chainpura Route route 15.50 LPS / 75 m head/18.5 KW (1W+1S)
MS Header & suction pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk
300 mm dia
200 mm dia
150 mm dia
125 mm dia
MS discharge pipes with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc.-5mm thk
200 mm dia
150 mm dia
125 mm dia
MS common Delivery Pipes (manifold) with all fittings such as flanges; bends; tees; and other specials; nut & bolts; gasket etc. -5mm thk
200 mm dia
125 mm dia
100 mm dia
Electrically operated Sluice Valves of on suction & common header piping of following sizes
Suction Header -300 mm
Suction Header -200 mm
Suction Header -150 mm
Suction Header -125 mm
Bellows type dismantling joints on suction & common header piping of following sizes
Suction Header -300 mm
Suction Header -200 mm
Suction Header -150 mm
Suction Header -125 mm
Electrically operated Sluice Valves of on individual & common delivery piping of following sizes
150 mm dia
125 mm dia
100 mm dia
Bellows type dismantling joints of following sizes on individual & common delivery piping of following sizes
150 mm dia
125 mm dia
100 mm dia
Electrically operated Butterfly Valves on individual & common delivery piping of following sizes
150 mm dia
125 mm dia
100 mm dia
Dual Plate type Check valve of following sizes on individual & common delivery piping of following sizes
150 mm dia
125 mm dia
100 mm dia
Kinetic Air Valves of 100 mm diameter with isolating Sluice Valve of 100 mm size
Glycerine filled pressure gauges
Electro megnetic flow meter 150 mm size
Electro megnetic flow meter 125 mm size
Providing, installation, testing, trial run and commissioning of the following, as per the specifications
Providing, installation, testing and commissioning of soft starters, for each pump-set, complete in all respect as per the scope of work & specifications.
Providing, installation, testing and commissioning of LT MCC with panels housing motor starters relays, MCB/MCCBs, bus-bar for all pump sets including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications .
Providing, installation, testing and commissioning of capacitor control panels, housing power factor control system panel/capacitors (APFC Panel), other accessaries including all internal cabling and cable/bus-bar from switchyard, up to panels, etc, complete in all respect as per the scope of work & specifications.
Earthing system complete for LT equipments
For LT Panet & motors for New Pump
Providing, installation, testing, trial run and commissioning of the following, as per specifications
Full Bore Electro magnetic Flow meter with suitable size by pass arrangement and associated pipes and specials etc, as per scope of work for following headworks
150 mm dia
125 mm dia
100 mm dia
Manually operated Sluice Valves for flow meter arrangement :
150 mm dia
125 mm dia
100 mm dia
Bellows type dismantling joints on flow meter arrangement :
150 mm dia
125 mm dia
100 mm dia
Construction of Flow meter chamber
Construction of shed and providing Post chlorination System comprising of Supply & installation of chlorine tonners (2 nos. @ 900 kg) with vaccum chlorinator 2 Nos. (1working+1 standby) comprising of chlorine solution-feeding unit, control panel, pipings, sensor for detecting leakages, booster pump, sprinkler system, injector module to suit the capacity of the chlorinator sprinkler system etc. complete in all respect as per the specification.
Other items & accessories not specified above but required to complete the work on turn key basis
CLEAR WATER RISING MAIN
Supply, Laying; jointing; sectional testing; and commissioning of DI (K-7) pipeline including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification. Work also included required earth work in all type of strata (trench excavation & refilling etc) dismantling of CC/ Bitumen/ Kharanja/ CC Block Roads etc and repairing the same as per scope & specification of work (VOl-II)
DI K-7 Pipe Line
100mm Dia
150mm Dia
200mm Dia
Supply, Laying; jointing; sectional testing; and commissioning of DI (K-9) pipeline including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification Work also included required earth work in all type of strata (trench excavation & refilling etc) dismantling of CC/ Bitumen/ Kharanja/ CC Block Roads etc and repairing the same as per scope & specification of work (Vol-II)
DI K-9 Pipe Line
250 mm dia
Supply, Laying; jointing; sectional testing; and commissioning of MS pipeline including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification
100mm Dia
150mm Dia
200mm Dia
Supply & installation of Sluice Valves for scouring size
100mm Dia
Supply & installation of Air Valves size
Construction of air valve Pillars
Construction of scour valve chambers
Construction of Water Meter chambers
Construction of sluice valve chamber at Junction points
Construction of sectionalizing valve chamber as per design & drawings
Provision for CI Specials/ fittings in Sluice Valve Chambers/ offtake chambers, water meter chamber & section valve chamber
CI Fittings
Sluice Valves for Junction Chambers & Water Meter Chamber
100mm Dia
150mm Dia
200mm Dia
250mm Dia
Bellows Type Dismantling joint for Chambers & Sectionilizing valve
100mm Dia
150mm Dia
200mm Dia
250mm Dia
GSM Based Flow Meters
100mm Dia
Butterfly Valves as Sectionilizg Valves
100mm Dia
Other items & accessories not specified above but required to complete the work on turn key basis
CLUSTER DISTRIBUTION PIPE LINE
Supply, Laying; jointing; sectional testing; and commissioning of HDPE PE80/PN-6 including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification. Work also included required earth work in all type of strata (trench excavation & refilling etc) dismantling of CC/ Bitumen/ Kharanja/ CC Block Roads etc and repairing the same as per scope & specification of work (Vol-II)
HDPE PN-6 (Dia in mm)
Supply, Laying; jointing; sectional testing; and commissioning of MS pipeline including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification
80mm Dia
100mm Dia
150mm Dia
200mm Dia
Supply & installation of Air Valves size
Construction of air valve Pillars
Construction of sluice valve chamber at Junction points & Sectional Valve
Provision for CI Specials/ fittings in Sluice Valve Chambers at Junction Points, village transfer chambers etc.
CI Specials for Chambers
Sluice Valves
80mm Dia
100mm Dia
125mm Dia
150mm Dia
200mm Dia
Bellows Type Dismantling joint
80mm Dia
100mm Dia
125mm Dia
150mm Dia
200mm Dia
Interconnection at VTC, as specified locations
Other items & accessories not specified above but required to complete the work on turn key basis
VILLAGE DISTRIBUTION PIPE LINE
Supply, Laying; jointing; sectional testing; and commissioning of HDPE PE80/PN-6 including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification. Work also included required earth work in all type of strata (trench excavation & refilling etc) dismantling of CC/ Bitumen/ Kharanja/ CC Block Roads etc and repairing the same as per scope & specification of work (Vol-II)
HDPE PN-6 (Dia in mm)
Supply, Laying; jointing; sectional testing; and commissioning of MS pipeline including the earthwork, bedding, sand bedding, construction of anchors; thrust blocks; cross walls; traverse block; pipe support structures; road crossing works; river crossing works; providing pitching & NP 3 pipes for scour valves; construction of ancillary structures; providing & installation of specials; clearing the site; disinfection etc. complete in all respect as per the specification
80mm Dia
100mm Dia
150mm Dia
Provision for sluice valves, dismantling joints, spectials & fittings in village distribution system and piped scheme
80mm Dia
100mm Dia
150mm Dia
200mm Dia
Interconnection at VTC, as specified locations
Other items & accessories not specified above but required to complete the work on turn key basis
FUNCTIONAL HOUSE HOLD TAP CONNECTION
Providing service connections as per technical specifications & standards drawing as per relevant IS code (amended up to date) from all kind of water mains up to consumer meter/ premises (complete job). This job included digging out standard size of pits and trench for laying service line in all kind of soil including demolishing of cement concrete, WBM, Black top etc of all thickness. Cutting of CC road/ jhiri by using concrete cutter machine, depositing & refilling of jhiri with watering & ramming/ compacting in layers and disposal of surplus excavated soil as directed within a lead of 50 mtr, providing & fixing of all fittings dully approved in accordance with ISO/DTR 9080 as per specification for potable water including approved make of MS clamp with saddle piece gunmetal ferrule (ISI marked) gunmetal NRV (ISI marked), valve (IS 778) and specials with MDPE Pipe PE-80 PN-16 as per ISO 4427, with flushing, cleaning, disinfecting & testing of pipe line complete required for making of service connection complete in all respect including labour charges. The service line should be laid at least 45cm below ground level, except in case of concrete/ bituminous road where minimum depth shall be 20cm. For detail specification of MDPE pipes, please refer Technical specification. General specification of MDPE pipes shall be as under: • Raw material shall be virgin PE-80 blue compound and comply with the requirement of ISO/ Directive of Testing Material: 9080 with minimum required strength of 8 kg/sq.cm. • The raw material shall be food grade quality • Pressure rating shall be 16 Bar • The pipe shall bear ISO marking
Average length up to 05 meter, 20mm dia MDPE Pipe
Extra length of 20mm MDPE pipe including excavation, providing, laying & jointing for length of service line above 05 meter
Other items & accessories not specified above but required to complete the work on turn key basis
ELEVATED SERVICE RESERVOIRS
Construction of RCC INTZE type Over Head Service Resevoir of following capacity and staging consisting of excavation in all type of strata , RCC work, cement plaster with water proofing compound to the inner face of the container including refilling disposing off the surplus stuff , plinth protection , all labour and material charge including providing and fixing of accessories such as ladder , manhole frame and covers , water level indicator ( float type ) ventilator with SS screen , lightening arrestor , float valves , puddle collar , DI double Flange Inlet/ Out Let/ Overflow/ Wash out pipes, Duck foot Bends, Puddle Collars, resileant seated sluice valves, Dismantling joint etc., G.I. pipe railing around walk way and top dome , providing RCC staircase from 4.5 mtr height of ground level to top level , chambers for all valves , providing and applying three coats of cement paint to the external surface of container , food grade epoxy paint to internal surface and giving satisfactory hydraulic test and water tightnees test as per I.S. code , etc. complete in all respect ae per design data , criteria , obligatory requirements and detailed specifications , scope of work and GA drawing. The job includes painting the name of the scheme and other details on the reservoir , providing aluminium portable ladder suitable to reach at height of 4.5 Mtr and any other work related to structure as per the directions of Engineer -in-charge , Technical Specification and Scope of work.
Construction of Flat Slab Over Head Service Resevoir of following capacity and staging consisting of excavation in all type of strata , RCC work, cement plaster with water proofing compound to the inner face of the container including refilling disposing off the surplus stuff , plinth protection , all labour and material charge including providing and fixing of accessories such as ladder , manhole frame and covers , water level indicator ( float type ) ventilator with SS screen , lightening arrestor , float valves , puddle collar , DI double Flange Inlet/ Out Let/ Overflow/ Wash out pipes, Duck foot Bends, Puddle Collars, resileant seated sluice valves, Dismantling joint etc., G.I. pipe railing around walk way and top dome , providing RCC staircase from 4.5 mtr height of ground level to top level , chambers for all valves , providing and applying three coats of cement paint to the external surface of container , food grade epoxy paint to internal surface and giving satisfactory hydraulic test and water tightnees test as per I.S. code , etc. complete in all respect ae per design data , criteria , obligatory requirements and detailed specifications , scope of work and GA drawing. The job includes painting the name of the scheme and other details on the reservoir , providing aluminium portable ladder suitable to reach at height of 4.5 Mtr and any other work related to structure as per the directions of Engineer -in-charge , Technical Specification and Scope of work.
Other items & accessories not specified above but required to complete the work on turn key basis
Ancillary Civil Works
To Plan, Design, Construct and finish the following as per specifications as per detail given in Annexures.
Construction of Boundary wall, at 11 No ESR sites (30x30M) & IPS Seeswali
Construction of CC approach road, as per specification
Campus development at IPS Seeswali head works including general grading of the campus, electrification, water supply, sanitation arrangement etc.
Installation of MS Gates at Head Works & ESR sites : 1 at Each ESR site
Other items & accessories not specified above but required to complete the work on turn key basis
11/0.44 KV POWER SYSTEM
Provision for supply/ installatio of compact sub station unit with 1w+1s transformers of various range at proposed Pumping Stations:
At IPS-Seeswali-160 KVA
Supplying of following size of XLPE insulated and PVC outer sheathed aluminium conductor armoured UG cable of 1.1 KV grade confirming to IS:7098 (Part-I) 1988 with upto date amendments complete as required. 3.5 x 185 Sq.mm
Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required.
Supplying and laying 25 mm X 5 mm G.I strip at 0.50 metre below ground as strip earth electrode, including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm)
Providing and fixing 25 mm X 5 mm copper strip in 40 mm dia G.I. pipe FRLSom earth electrode including connection with brass nut, bolt, spring, washer excavation and re-filling etc. as required.
Augmentation of existing GSS at intake/WTP/IPS Ghodigaon.
Other items & accessories not specified above but required to complete the work on turn key basis
MISCELLANIOUS ITEMS
Provision for Megha Highway Crossing by trenchless technology including cost deposited to conceren department
Provision for Major Canal Crossing by trenchless technology including charges to be deposited to concern authorities
Provision for Distributiry/ Minor Crossing by trenchless technology including charges to be deposited to concern authorities
Supply of Mechanical & Electrical & instrumentation spare parts as per Scope of work
Supply of pipe line spare parts as per Scope of work
Supply of tools & tackles as per Scope of work
PLC-SCADA SYSTEM
Providing, installation, testing, trial run and commissioning of the additional PLC/ SCADA System under present work , as per the scope of work & specifications given, to the complete satisfaction of Engineer in Charge:
Providing additioanl furniture and other required accessories at Master Control Centre at WTP Head Works as per scope of work,
Other items & accessories not specified above but required to complete the work on turn key basis
PRICE BREAK UP SCHEDULE: B
For 10 Year O & M
Cost for Basic Service Charges, including all chemicals required, to treat water at WTP, Administration and Management, Running of Office, Staff Quarters, Work Shops, Garage, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Cost of Lubricants, Consumables, Spare Parts as per Scope of Work & terms & conditions of contract. After execution of the project and issuance of completion certificate as per relevant clause in Vol-1, Defect Liability Period shall be of 12 months. During Defect liability period O&M shall be done by contractor for which no payment shall be made separately. O&M period shall commence after expiry of 1 year defect liability period.
For Year 1 of O&M
For Year 2 of O&M
For Year 3 of O&M
For Year 4 of O&M
For Year 5 of O&M
For Year 6 of O&M
For Year 7 of O&M
For Year 8 of O&M
For Year 9 of O&M
For Year 10 of O&M
VISHNU PRAKASH R PUNGLIA LTD
BIHANI CONSTRUCTIONS PRIVATE LIMITED
M/s DEVENDRA CONSTRUCTION CO.
OFFSHORE INFRASTRUCTURES LTD
DARA ENGINEERING AND INFRASTRUCTURES PVT LTD
lahotybuildcon
Unipro Techno Infrastructure Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.32 MB
BOQ_390272.xls
BOQ • 0.45 MB
TD2.pdf
Tender Documents • 20.74 MB
Download all tender documents and submit your bid