Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹84,833.95Admitted-Finance | -13.13% | ₹84,833.95 | L1 | Admitted-Finance |
| 2 | L2₹92,519.50+₹7,685.54 (9.06%)Admitted-Finance | -5.26% | ₹92,519.50+₹7,685.54 (9.06%) | L2 | Admitted-Finance |
| 3 | L3₹1.0 L+₹17,705.07 (20.9%)Admitted-Finance | +5.00% | ₹1.0 L+₹17,705.07 (20.9%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-challan digitally edited |
| 5 | Not Admitted-Fee/PreQual/Technical MEHLA DADRA BHADIAN KOTHI CHAMBA CHAMBA HIMACHAL PRADESH 176318 INDIA | CHAMBA | HIMACHAL PRADESH | 176318 | - | - | - | Not Admitted-Fee/PreQual/Technical Others-challan digitally edited |
Tender Value
₹97,000
EMD Value
₹1,940
Closing Date
18 Aug 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Constt of Culvet near house of Jagir Singh Kotli Raiyan Pyt Magowali Block Suchetgarh Under District CAPEX Budget DDC Component for FY 2026-27
2026_RDPR_319087_7
e-NIT No. 368 REWJ of 2026-27 dated 03-08-2026
Open Tender
Civil Works
Percentage
90 days
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹1,940
5 Sept 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:in AKOS | 9.04 | cum | 479.3 | ₹4,332.87 |
| 2 | Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work Upto plinth level (1:5:10) 1 cement:5 coarse sand:10 graded stone aggreagate 40mm nominal size (crusher) | 2.24 | cum | 4,826.5 | ₹10,811.36 |
| 3 | Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work Upto plinth level (1:3:6) 1 cement:3 coarse sand:6 graded stone aggreagate 20mm nominal size (crusher) | 6.8 | cum | 5,733.6 | ₹38,988.48 |
| 4 | Centring and shuttering including strutting, propping etc and removal of form for. for mass concrete foundations | 44.61 | sqm | 286.35 | ₹12,774.07 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto Plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.64 | Cum | 7,788.4 | ₹4,984.58 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 96.98 | KG | 123.2 | ₹11,947.94 |
| 7 | Providing and laying 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand:4 graded stone aggregate 20mm nominal size | 7.43 | sqm | 416.5 | ₹3,094.6 |
| 8 | CIB (citizen information Board ) | 1 | Nos | 3,500 | ₹3,500 |
| 9 | Carriage of Sand AND Stone Agg. av. 30 KM by M.T | 13.88 | cum | 520.34 | ₹7,222.32 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1055377.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .